ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / METRO VRUNDAVAN B BUILDING

Registration lapsed No litigation declared Residential / Group Housing project

METRO VRUNDAVAN B BUILDING

By METRO REALTORS

RG-MH-58911 · RERA P52100052420 · Last updated on MahaRERA portal: 8 Jan 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
8 of 11Construction stages donefurthest along: Podiums (if any), 0%
14 of 27Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 113 documents Report an error

METRO VRUNDAVAN B BUILDING is a Residential / Group Housing project by METRO REALTORS in Pune, Maharashtra, registered with MahaRERA as P52100052420 on 22 Aug 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 13 of the 27 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameMETRO VRUNDAVAN B BUILDING
  • TypeResidential / Group Housing
  • Location
    • Pimprigaon
    • Pimpri
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411017
  • Pincode411017
  • RERA no.P52100052420
  • ReraGenie IDRG-MH-58911

Builder

  • NameMETRO REALTORS
  • Entity typePartnership
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

10 months past promisethis monthRegisteredAug 2023PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 Aug 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed113 files

Current status

48%13 of 27 units booked
100.0%Work done, per cost certificate

Figures as on 8 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
METRO VRUNDAVAN B BUILDINGNA8727027

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

METRO VRUNDAVAN B BUILDING: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 8 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed21

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots21
Closed/Covered21

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,321 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Nov 2025
LandownerVillageDistrict
Hanumant Rajaram KudalePimpri Chinchawad (M Corp.)Pune
Anuradha Hanumant KudalePimpri Chinchawad (M Corp.)Pune
Kalyani Hanumant KudalePimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authoritypimpri chinchwad municipal corporation
Permissible FSI4476.07
Proposed, not sanctioned2,626 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBhosari Pune
Estimated costRs 9.22 cr
Cost incurredRs 9.22 cr
Work done100.0%
BuildingWingEstimatedIncurred
METRO VRUNDAVAN B BUILDINGNARs 7.84 crRs 7.84 cr
-NARs 1.38 crRs 1.38 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArcon Associates Architect Shekhar Nahar
EngineerVikramsingh Dhobale
EngineerSpectrum Consultants
EngineerSunil Dinkar KADAKANE
Chartered AccountantCA Vaibhav R Mayur
Chartered AccountantNITISH VAIDYA
PartnerRole in project
METRO REALTORS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed113

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1 upto 30-06-2025.pdf8 Jan 2026
Withdrawal Update Form 2File: Form 2 upto 30-06-2025.pdf8 Jan 2026
Withdrawal Update Form 3File: Form 3 upto 30-06-2025.PDF8 Jan 2026
Withdrawal Update Form 1File: form 1 upto 30-06-2025.pdf7 Jan 2026
Withdrawal Update Form 1File: form 1 upto 30-06-2025.pdf7 Jan 2026
Withdrawal Update Form 2File: Form 2 upto 30-06-2025.pdf7 Jan 2026
Withdrawal Update Form 2File: Form 2 upto 30-06-2025.pdf7 Jan 2026
Withdrawal Update Form 3File: Form 3 upto 30-06-2025.PDF7 Jan 2026
Withdrawal Update Form 3File: Form 3 upto 30-06-2025.PDF7 Jan 2026
Form 2A (FY 2023-2024)File: form 2A (2023-2024).pdf8 Dec 2025
Form 2A (FY 2024-2025)File: form 2A (2024-2025).pdf8 Dec 2025
Form 5 (FY 2023-2024)File: form 5 (2023-2024).pdf8 Dec 2025
Form 5 (FY 2024-2025)File: FORM-5 (2024-2025).pdf28 Nov 2025
Form 1File: form 1 upto 30-06-2025.pdf30 Jul 2025
Form 2File: Form 2 upto 30-06-2025.pdf30 Jul 2025
Form 3File: Form 3 upto 30-06-2025.PDF30 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory upto30-06-2025.pdf30 Jul 2025
Form 1File: Form 1 upto 31-12-2024.pdf29 Jul 2025
Form 2File: Form 2 upto 31-12-2024.pdf29 Jul 2025
Form 3File: Form 3 upto 31-12-2024.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: Discloser of Sold unsold inventory 31-12-2024.pdf29 Jul 2025
Form 1File: Form1 Architect Certificate.pdf28 Jul 2025
Form 2File: Form2 Engineers Certificate.pdf28 Jul 2025
Form 3File: CA Certificate Sept 2023.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Booked Inventory Details.pdf28 Jul 2025
Form 1File: Form1 Architect Certificate.pdf28 Jul 2025
Form 2File: Form2 Engineers Certificate.pdf28 Jul 2025
Form 3File: Form 3 CA Certificate.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Booked inventory Details.pdf28 Jul 2025
Form 1File: Form 1 Architects Certificate.pdf28 Jul 2025
Form 2File: Form2 Metro Vrundavan.pdf28 Jul 2025
Form 3File: Form3 CA Certificate.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold inventory details.pdf28 Jul 2025
Form 1File: Form1 Arch Certificate.pdf28 Jul 2025
Form 2File: Form2 Eng Certificate.pdf28 Jul 2025
Form 3File: Form 3 CA Certificate.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Details.pdf28 Jul 2025
Form 1File: Form1 Architect Certificate.pdf28 Jul 2025
Form 2File: Form2 Engineers Certificate.pdf28 Jul 2025
Form 3File: Form 3 CA Certificate.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory.pdf28 Jul 2025
Form 1File: Form-1 Architects Certificate.pdf28 Jul 2025
Form 2File: Form-2 Engineer Certificate.pdf28 Jul 2025
Form 3File: Form 3 CA Certificate.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold and booked inventory.pdf28 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_Architects Certificate.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Metro B wing Form 3.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 FY 2024-25 (2).pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_Engineer Certificate.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 Form 2 Engineers Certificate.pdf7 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold.pdf7 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold.pdf7 May 2025
Disclosure of sold/ booked inventoryFile: Q3 Discloser of Sold unsold inventory.pdf7 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5 UPLOAD.pdf25 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Architect Certificate.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Engineers Certificate.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 2024TO25 Q2 Metro.pdf21 Nov 2024
Disclosure of sold/ booked inventoryFile: Metro Vrundavan B Building.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Architect Certificate.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 2024TO25 Q2 Metro.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Engineers Certificate.pdf21 Nov 2024
Disclosure of sold/ booked inventoryFile: Metro Vrundavan B Building.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Arch Certificate001.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Eng Certificate001.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Details001.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 2024to25 Q1.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 Form 1 Architects Certificate.pdf30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Q4 Metro Vrundavan.pdf30 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold unsold inventory details.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 FY 23to24 Q4 Metro Realtors B Wing.pdf30 Apr 2024
Layout approvalFile: scan0256_compressed.pdf9 Feb 2024
Building plan approvalFile: scan0260_compressed.pdf9 Feb 2024
Building plan approvalFile: scan0261_compressed.pdf9 Feb 2024
Copy of Layout Approval (in case of layout)File: scan0256_compressed.pdf9 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: scan0260_compressed.pdf9 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: scan0261_compressed.pdf9 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf9 Feb 2024
Disclosure of sold/ booked inventoryFile: Q2Booked Inventory Details.pdf9 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3Form1 Architect Certificate.pdf30 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3-Form2 Engineers Certificate.pdf30 Jan 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
GREEN SQUARE C D AND E WINGGREEN SQUARE GAT NO 157 BORHADEWADI MOSHI PIMPRI-CHINCHWAD MAHARASHTRA 412105141CompletedApr 2017Apr 2017

How this compares with Pune

48%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep METRO VRUNDAVAN B BUILDING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pimpri13,700+ in Pune

Builder: METRO REALTORS

METRO REALTORS has 2 registrations on MahaRERA, including METRO VRUNDAVAN A BUILDING and METRO VRUNDAVAN B BUILDING. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that METRO VRUNDAVAN B BUILDING shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if METRO VRUNDAVAN B BUILDING is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of METRO VRUNDAVAN B BUILDING?

The registered promoter entity is METRO REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in METRO VRUNDAVAN B BUILDING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for METRO VRUNDAVAN B BUILDING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at METRO VRUNDAVAN B BUILDING?

The professionals named in the filing: Architect: Arcon Associates Architect Shekhar Nahar; Engineer: Vikramsingh Dhobale; Engineer: Spectrum Consultants; Engineer: Sunil Dinkar KADAKANE; Chartered Accountant: CA Vaibhav R Mayur; Chartered Accountant: NITISH VAIDYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in METRO VRUNDAVAN B BUILDING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About METRO VRUNDAVAN B BUILDING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save METRO VRUNDAVAN B BUILDING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.