ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / METRO PARK 12

Registered No litigation declared Plotted project

METRO PARK 12

By RITESH KAILASHPRASAD SAXENA

RG-MH-30514 · RERA P50500049304 · Last updated on MahaRERA portal: 18 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
14 of 37Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

METRO PARK 12 is a Plotted project by RITESH KAILASHPRASAD SAXENA in Nagpur, Maharashtra, registered with MahaRERA as P50500049304 on 7 Feb 2023. Possession is promised by 31 Mar 2027. 23 of the 37 units on this registration are recorded sold or booked.

At a glance

Project

  • NameMETRO PARK 12
  • TypePlotted
  • Location
    • PH NO 28
    • MOUZA BELA
    • TAH. UMRED
    • NAGPUR
    • Bela
    • Umred
    • Nagpur
    • 441108
  • Pincode441108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500049304
  • ReraGenie IDRG-MH-30514

Builder

  • NameRITESH KAILASHPRASAD SAXENA
  • Entity typeIndividual
  • Other registrations4 more →
  • Declared earlier projects6 →

Key dates

this monthRegisteredFeb 2023PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Feb 2023
  • Promised completion31 Mar 2027
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed88 files

Current status

62%23 of 37 units booked
19.2%Work done, per cost certificate

Figures as on 18 Jul 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 18 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes75%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,683 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityTown Planning Authority Nagpur
Permissible FSI5163.61
Proposed, not sanctioned5,164 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSITABULDI, NAGPUR-440010
Estimated costRs 1.25 cr
Cost incurredRs 24.00 lakh
Work done19.24%
BuildingWingEstimatedIncurred
-NARs 1.25 crRs 24.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUmesh Lamge
EngineerBuildcon Designers LLP
Chartered AccountantAgrawal Saraf & Associates
Chartered AccountantAgrawal Ankita & Co
PartnerRole in project
RITESH KAILASHPRASAD SAXENA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architech Certificate.pdf18 Jul 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf18 Jul 2025
Withdrawal Update Form 3File: Form 3 CA Certificate.pdf18 Jul 2025
Form 1File: Form 1 Architech Certificate.pdf21 Jun 2025
Form 2File: Form 2 Engineer Certificate.pdf21 Jun 2025
Form 3File: Form 3 CA certificate.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Dec 24.pdf21 Jun 2025
Form 1File: Form 1 Architech Certificate.pdf21 Jun 2025
Form 2File: Form 2 Engineer Certificate.pdf21 Jun 2025
Form 3File: Form 3 CA Certificate.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory March 25.pdf21 Jun 2025
Form 1File: 8 Architect Metro Park 12_June 2023.pdf18 Jun 2025
Form 2File: 17 Engineer Metro Park 12_June 2023.pdf18 Jun 2025
Form 3File: New Form 3.pdf18 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold or booked inventory June 23 MP12.pdf18 Jun 2025
Form 1File: 9 Architect Metro Park 12_Septmber 2023.pdf18 Jun 2025
Form 2File: 18 Engineer Metro Park 12_Septmber 2023.pdf18 Jun 2025
Form 3File: New Form 3.pdf18 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold or booked inventory Sep 23 MP12.pdf18 Jun 2025
Form 1File: 7 Architect Metro Park 12_March 2023.pdf3 Jun 2025
Form 2File: 16 Engineer Metro Park 12_March 2023.pdf3 Jun 2025
Form 3File: FORM 3.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold or booked inventory March 23 MP12.pdf3 Jun 2025
Form 1File: architect certificate.pdf3 Jun 2025
Form 2File: engineer certificate.pdf3 Jun 2025
Form 3File: Form 3.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold or booked inventory Dec 23 MP12.pdf3 Jun 2025
Form 1File: architect certificate.pdf3 Jun 2025
Form 2File: engineer certificate.pdf3 Jun 2025
Form 3File: Form 3.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold or booked inventory Mar 24 MP12.pdf3 Jun 2025
Form 1File: architect certificate.pdf3 Jun 2025
Form 2File: engineer certificate.pdf3 Jun 2025
Form 3File: Form 3.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold or booked inventory June 24 MP12.pdf3 Jun 2025
Form 1File: Form 01.pdf3 Jun 2025
Form 2File: Form 02.pdf3 Jun 2025
Form 3File: Form 3.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold or booked inventory Sep 24 MP12.pdf3 Jun 2025
Form 5 (FY 2022-2023)File: Form 05.pdf3 Jun 2025
Form 5 (FY 2023-2024)File: Form 5 2023-24.pdf3 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 01.pdf3 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf3 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf3 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02.pdf3 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 05.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Architect Metro Park 12_March 2023.pdf9 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Architect Metro Park 12_June 2023.pdf9 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Architect Metro Park 12_Septmber 2023.pdf9 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 16 Engineer Metro Park 12_March 2023.pdf9 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 17 Engineer Metro Park 12_June 2023.pdf9 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 18 Engineer Metro Park 12_Septmber 2023.pdf9 Feb 2024
Details of encumbrances concerned to FinanceFile: Legal Encumbrance Undertaking-MP12.pdf15 Jan 2023
Details of encumbrances concerned to FinanceFile: Financial Encumbrance Undertaking-MP12.pdf15 Jan 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrance Undertaking-MP12.pdf15 Jan 2023
Details of encumbrances concerned to LegalFile: Financial Encumbrance Undertaking-MP12.pdf15 Jan 2023
CERSAI detailsFile: Cersai undertaking with annexure.pdf15 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest declaration.pdf15 Jan 2023
Layout approvalFile: SCAN MAP.pdf23 Dec 2022
Building plan approval or NA orderFile: NA ORDER.pdf23 Dec 2022
PAN CardFile: RS- PAN.pdf23 Dec 2022
Copy of the legal title reportFile: MP - 12 LEGAL TITLE REPORT.pdf23 Dec 2022
Details of encumbrances concerned to FinanceFile: PROMOTER ENCUMBRANCE CERTIFICATE MP 12.pdf23 Dec 2022
Details of encumbrances concerned to LegalFile: PROMOTER ENCUMBRANCE CERTIFICATE MP 12.pdf23 Dec 2022
Copy of Layout Approval (in case of layout)File: SCAN MAP.pdf23 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: NA ORDER.pdf23 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: Sanction letter.pdf23 Dec 2022
Declaration about Commencement CertificateFile: Declaration COMMENCMENT CERTIFICATE-MP 12 .pdf23 Dec 2022
Declaration in FORM BFile: Declaration in FORM B-MP12.pdf23 Dec 2022

How this compares with Nagpur

62%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep METRO PARK 12 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TAH. UMRED, NAGPUR2,800+ in Nagpur

Builder: RITESH KAILASHPRASAD SAXENA

RITESH KAILASHPRASAD SAXENA has 5 registrations on MahaRERA, including METRO PARK 12 and METRO PARK 13. Its filings disclose 6 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if METRO PARK 12 is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of METRO PARK 12?

The registered promoter entity is RITESH KAILASHPRASAD SAXENA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in METRO PARK 12?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for METRO PARK 12?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at METRO PARK 12?

The professionals named in the filing: Architect: Umesh Lamge; Engineer: Buildcon Designers LLP; Chartered Accountant: Agrawal Saraf & Associates; Chartered Accountant: Agrawal Ankita & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in METRO PARK 12?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About METRO PARK 12. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save METRO PARK 12 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.