ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Mesacon Sohag

Completed No litigation declared Residential / Group Housing project

Mesacon Sohag

By Mesacon Projects

RG-MH-78427 · RERA P51800035143 · Last updated on MahaRERA portal: 18 Jan 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 80%
1Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

Mesacon Sohag is a Residential / Group Housing project by Mesacon Projects in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800035143 on 10 May 2022. The registration is recorded completed; possession was promised by 31 Mar 2025. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMesacon Sohag
  • TypeResidential / Group Housing
  • Location
    • Lallubhai Samaldas Road
    • Andheri West
    • Andheri
    • Mumbai Suburban
    • 400058
  • Pincode400058
  • RERA no.P51800035143
  • ReraGenie IDRG-MH-78427

Builder

  • NameMesacon Projects
  • Entity typePartnership
  • GSTIN27ABIFM1147R1ZP
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersVikram Rashmikant Mehta, Vaishali Vikram Mehta
  • Other registrations4 more →
  • Completed4 of 5

Key dates

this monthRegisteredMay 2022PromisedMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 May 2022
  • Promised completion31 Mar 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed59 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Mesacon SohagNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.

Mesacon Sohag: 86% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 18 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes25%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes30%
Water conservation /Rain water harvestingYes60%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes55%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed45

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots45
Closed/Covered45

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area987 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Sohag Andheri Co-Operative Housing Society LtdAndheriMumbai Suburban

Approvals and building plan

Permissible FSI2800.5
Proposed, not sanctioned2,800 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 3 and 4 Ground Floor Jamuna Apartment SV Road Andheri West 400058

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAshim Khatri
EngineerM/S. HDB Design Service
Chartered AccountantD J Shah And Associates
PartnerRole in project
Mesacon Projects-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12500583Jagdeep DESAIMesacon Projects20/02/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Jan 2025

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sohag_Engineers Certificate_31-12-24.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sohag_CA Certificate_31-12-24 Signed.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sohag Architect Certificate 31 Dec 2024.pdf13 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: RERA_Form 4 - Certificate of Completion of Construction - Sohag1.pdf13 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: MESACON SOHAG OC.pdf4 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SOHAG_RERA_Form 5_Annual Report FY 23-24.pdf8 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sohag_Engineers Certificate_30-09-24.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sohag_CA Certificate_30-09-24.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sohag_Architect Certificate_30-09-24.pdf15 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Sohag_RERA_Form 2A_Engineers Certificate for Quality Assurance_31-03-24.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MP_Sohag_Form 1 Architect Certificate_30-06-24.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MP_Sohag_Engineers Certificate_30-06-24.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MP_Sohag_CA Certificate Sohag_30-06-24.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mesacon Sohag_Architect Certificate_31-03-24.pdf19 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sohag_Engineers Certificate_31-03-24_signed.pdf19 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sohag Mar 24_Upload.pdf19 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CA Certificate_MSohag_Dec2023.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MP_Sohag_Form 1Architect Certificate_Dec2023.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MP_Sohag_Engineers Certificate_Dec 2023.pdf16 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: MS_RERA Sohag Quality Assurance Certificate_31-03-23.pdf11 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MP_Sohag_Architect Certificate_30-06-23.pdf3 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MP_Sohag_Architect Certificate_30-09-23.pdf3 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MP_Sohag_Engineers Certificate_31-03-23.pdf3 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MP_Sohag_Engineers Certificate_30-06-23.pdf3 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MP_Sohag_Engineers Certificate_30-09-23.pdf3 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Sohag_Form 5.pdf16 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sohag_Form 3_CA Certificate_30 SEP 2023.pdf26 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: Sohag CC 23 August 2023.pdf25 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sohag_CA Certificate_30 June 2023.pdf21 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE - Sohag_Signed.pdf5 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sohag_CA Certificate_31-03-23.pdf8 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert_Rera_Sohag 31 Dec 2022.pdf23 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sohag Engg Certificate 31 Dec 2022.pdf21 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sohag Oct 2022 Architect Certificate.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sohag Dec 22 Architect Certificate.pdf20 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: Sohag C C up to 7th Floor.pdf13 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Sohag Society Registration Certificate.pdf20 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sohag Engg Certificate 30 Sep 2022.pdf5 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MSohag _Engineers Certificate_30 June 202 dated 05 Aug 2022.pdf21 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mesacon Sohag_RERA_CA Certificate_30 Sep 2022.pdf19 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MP_Sohag_CA Certificate as on 30-06-22_compressed.pdf3 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sohag Architect Certificate March 2022.pdf2 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MP SOHAG ENGG Certificate March 2022.pdf2 Jul 2022
Details of encumbrancesFile: Sohag_RERA Non-Emcumbrance Certificate.pdf8 Jun 2022
Proforma of Allotment letterFile: SOHAG DRAFT SALE AGREEMENT RERA REV FINAL dt 08-06-22.pdf8 Jun 2022
Copy of the legal title reportFile: Sohag_RERA_Title Report.pdf3 May 2022
Commencement Certificates / NA Order for plotted developmentFile: 2314017_FirstCC_signed_220502_192028.pdf3 May 2022
Declaration about Commencement CertificateFile: Sohag_ RERA Circular 32.pdf3 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sohag_Form 3 (1).pdf3 May 2022
CERSAI detailsFile: CERSAI_Search_Report_200236472732_For_Asset_Based_Search_02_05_2022_12_46_50_220.pdf2 May 2022
Proforma of Allotment letterFile: Allotment Letter Meascon Sohag.pdf2 May 2022
Layout approvalFile: plan Mesacon-1.pdf30 Apr 2022
Building plan approvalFile: plan Mesacon-2.pdf30 Apr 2022
Details of encumbrancesFile: Sohag_RERA Encumbrance Letter.pdf30 Apr 2022
Copy of Layout Approval (in case of layout)File: plan Mesacon-1.pdf30 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: plan Mesacon-2.pdf30 Apr 2022
Declaration in FORM BFile: Sohag_FORM -B -PROMOTER.pdf30 Apr 2022
Proforma of Allotment letterFile: SOHAG DRAFT SALE AGREEMENT.pdf30 Apr 2022
PAN CardFile: mesacon Pancard.pdf7 Mar 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mesacon Sohag on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri West6,700+ in Mumbai Suburban

Builder: Mesacon Projects

MESACON PROJECTS has 5 registrations on MahaRERA, including MESACON JEWEL WING A AND B and MESACON JEWEL WING C. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Mesacon Sohag is delayed beyond 31 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mesacon Sohag?

The registered promoter entity is Mesacon Projects, a partnership as per the filing. Its GSTIN 27ABIFM1147R1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mesacon Sohag?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Mesacon Sohag?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Mesacon Sohag?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mesacon Sohag?

The professionals named in the filing: Architect: Ashim Khatri; Engineer: M/S. HDB Design Service; Chartered Accountant: D J Shah And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mesacon Sohag?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mesacon Sohag. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mesacon Sohag to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.