Home / Browse projects / Mumbai Suburban, Maharashtra / MEHER VILLA

Registered No litigation declared Residential / Group Housing project

MEHER VILLA

By HANSGANGA HARI SHEWA DEVELOPERS PRIVATE LIMITED

RG-MH-19254 · RERA P51800078336 · Last updated on MahaRERA portal: 12 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 4.67 crore secured on the land, in favour of India Bulls Credit Commercial Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 70%
18 of 18Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 124 documents Report an error

MEHER VILLA is a Residential / Group Housing project by HANSGANGA HARI SHEWA DEVELOPERS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800078336 on 4 Dec 2024. Possession is promised by 31 Mar 2028. 0 of the 18 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameMEHER VILLA
  • TypeResidential / Group Housing
  • Location
    • S V ROAD & 2ND ROAD
    • KHAR WEST
    • Bandra
    • Andheri
    • Mumbai Suburban
    • 400052
  • Pincode400052
  • RERA no.P51800078336
  • ReraGenie IDRG-MH-19254

Builder

  • NameHANSGANGA HARI SHEWA DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsRoshni Rajani, Rahul Haresh Ballaney

Key dates

this monthRegisteredDec 2024PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Dec 2024
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed124 files

Current status

0%0 of 18 units booked
26.0%Work done, per cost certificate

Figures as on 12 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MEHER KHUSHRU VILLANA261814418

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 70%.

MEHER KHUSHRU VILLA: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed34

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots34
Closed/Covered34

Land and ownership3

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area358 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared present
Charge in favour ofIndia Bulls Credit Commercial Limited
Secured amountRs 4.67 crore
CERSAI search filedYes
Declared on11 Sep 2025
LandownerVillageDistrict
Ballaney Constructions Pvt LtdAndheriMumbai Suburban
Callegari Constructions Pvt LtdAndheriMumbai Suburban
Roshul Developers Pvt LtdAndheriMumbai Suburban

Approvals and building plan

Sanctioning authoritySRA
Permissible FSI1930.0
Proposed, not sanctioned1,487 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLANDMARK BUILDINGPALI NAKA,PALI HILL,BANDRA -WEST MUMBAI MAHARASHTRA 400 050
Estimated costRs 15.86 cr
Cost incurredRs 4.12 cr
Work done25.96%
BuildingWingEstimatedIncurred
MEHER KHUSHRU VILLANARs 8.98 crRs 4.12 cr
-NARs 6.88 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMEHERDAD DASTUR
EngineerSACHIN SHENOLIKAR
Chartered AccountantNehali & Co
Chartered AccountantNehali Doshi
PartnerRole in project
HANSGANGA HARI SHEWA DEVELOPERS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jan 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed124

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 124 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: RERA FORM 1.pdf12 May 2026
Withdrawal Update Form 1File: RERA FORM 1.pdf12 May 2026
Withdrawal Update Form 2File: RERA FORM 2.pdf12 May 2026
Withdrawal Update Form 2File: RERA FORM 2.pdf12 May 2026
Withdrawal Update Form 3File: Resigned 08-05-2026 CA Certificate_Meher Villa_Dec 25.pdf12 May 2026
Withdrawal Update Form 3File: Resigned 08-05-2026 CA Certificate_Meher Villa_Mar 26.pdf12 May 2026
Withdrawal Update Form 1File: RERA FORM 1 OCT TO DECE 2025.pdf6 May 2026
Withdrawal Update Form 2File: RERA FORM 2 OCT TO DECE 2025.pdf6 May 2026
Withdrawal Update Form 3File: Signed CA Certificate_Meher Villa Dec 25.pdf6 May 2026
Commencement certificateFile: Meher Villa Further CC.pdf30 Jan 2026
Withdrawal Update Form 1File: RERA FORM 1 JUNLY TO SEPTEMBER 2025.pdf30 Jan 2026
Withdrawal Update Form 2File: RERA FORM 2 JUNLY TO SEPTEMBER 2025.pdf30 Jan 2026
Withdrawal Update Form 3File: FORM-3 CA Certificate_Meher Villa_Sept 25.pdf30 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf9 Sep 2025
Withdrawal Update Form 1File: Form 1.pdf9 Sep 2025
Withdrawal Update Form 2File: Form 2.pdf9 Sep 2025
Withdrawal Update Form 2File: Form 2.pdf9 Sep 2025
Withdrawal Update Form 3File: Form 3.pdf9 Sep 2025
Withdrawal Update Form 3File: Form 3.pdf9 Sep 2025
Form 1File: Form 1-Architect.pdf9 Jul 2025
Form 2File: Form 2- StructEngg.pdf9 Jul 2025
Form 3File: Form3-CA Certificate.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory.pdf9 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE_SIGNED.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE_SIGNED.pdf7 May 2025
Disclosure of sold/ booked inventoryFile: Discloser for Sold_Unsold Inventory_Signed_2.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3 CA Certificate_Signed.pdf10 Feb 2025
Disclosure of sold/ booked inventoryFile: Discloser for Sold_Unsold Inventory_Signed_2.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3 CA Certificate_Signed.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3 CA Certificate_Signed.pdf10 Feb 2025
Disclosure of sold/ booked inventoryFile: Discloser for Sold_Unsold Inventory_Signed_2.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3 CA Certificate_Signed.pdf10 Feb 2025
Disclosure of sold/ booked inventoryFile: Discloser for Sold_Unsold Inventory_Signed_2.pdf10 Feb 2025
Other - TechnicalFile: declaration.pdf28 Nov 2024
Other - FinanceFile: Declaration_Cost.pdf14 Nov 2024
Other - LegalFile: Deed of Conveyance-24.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-25.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-23.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-22.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-21.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-20_compressed.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-19.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-18.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-17.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-16.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-15.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-14.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-13.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-12.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-11.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-10.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-9.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-8.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-7.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-6.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-5.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-4.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-3.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-2.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-26_compressed.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-39.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-38.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-37.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-36.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-35.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-34.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-33.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-32.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-31.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-30.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-29.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-28.pdf21 Oct 2024
Other - LegalFile: Deed of Conveyance-27.pdf21 Oct 2024
Proforma of Allotment letterFile: Final Allotment Letter Draft oCTOBER 10 2024.pdf10 Oct 2024
Proforma of Agreement for saleFile: FINAL RERA Sale Agreement 21102024.pdf10 Oct 2024
Building plan approvalFile: IOA page 5.pdf6 Oct 2024
Building plan approvalFile: IOA page 4.pdf6 Oct 2024
Building plan approvalFile: IOA page 3.pdf6 Oct 2024
Building plan approvalFile: IOA page 3.pdf6 Oct 2024
Building plan approvalFile: IOA page 2.pdf6 Oct 2024

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MEHER VILLA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHAR WEST6,700+ in Mumbai Suburban

Builder: HANSGANGA HARI SHEWA DEVELOPERS PRIVATE LIMITED

HANSGANGA HARI SHEWA DEVELOPERS PRIVATE LIMITED has 1 registration on MahaRERA, including MEHER VILLA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if MEHER VILLA is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MEHER VILLA?

The registered promoter entity is HANSGANGA HARI SHEWA DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MEHER VILLA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MEHER VILLA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MEHER VILLA?

The professionals named in the filing: Architect: MEHERDAD DASTUR; Engineer: SACHIN SHENOLIKAR; Chartered Accountant: Nehali & Co; Chartered Accountant: Nehali Doshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MEHER VILLA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MEHER VILLA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MEHER VILLA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.