Home / Browse projects / Udupi, Karnataka / MEHAAN RESIDENCY
MEHAAN RESIDENCY
RG-KA-78421 · RERA PRM/KA/RERA/1273/318/PR/020922/005211 · Last updated on RERA Karnataka portal: 27 Aug 2022
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
MEHAAN RESIDENCY is a Residential/Group Housing project by P ANANDA SHETTY in Udupi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1273/318/PR/020922/005211 on 2 Sep 2022. Possession is promised by 7 Jun 2021. 0 of the 16 units on this registration are recorded sold or booked, and 0 of 14 construction stages are filed complete.
At a glance
Project
- NameMEHAAN RESIDENCY
- TypeResidential/Group Housing
- Location
- Udupi
- 576102
- Pincode576102
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1273/318/PR/020922/005211
- ReraGenie IDRG-KA-78421
Builder
- NameP ANANDA SHETTY
- Entity typeProprietorship Firm
- Authorized SignatoryP ANANDA SHETTY
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on2 Sep 2022
- Promised completion7 Jun 2021
- Revised completionNone
- Buildings1 building record
- Documents filed77 files
Current status
Figures as on 27 Aug 2022, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MEHAAN RESIDENCY | - | - | - | 16 | 0 | 16 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 27 Aug 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 14 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 0%.
Building: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 27 Aug 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| P ANANDA SHETTY | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 1.25 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | JAIKISHAN |
| Engineer | PRAKASH KUMAR SHETTY |
| Chartered Accountant | SRINIDHI RAO |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed77
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1273/318/PR/020922/005211 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CDP PLANFile: CDP plan.pdf | 27 Aug 2022 |
| VILLAGE MAPFile: village-map-mehaan-residency.jpg | 27 Aug 2022 |
| ESTIMATED COST CERTIFIED BY ENGINEERFile: estimation cost certified by engineer.pdf | 27 Aug 2022 |
| ENGINEER CERTIFICATE FORM 3File: ENGINEER CERTFICATE FORM 3.pdf | 27 Aug 2022 |
| ENGINEER LICENCE CERTIFICATEFile: ENGINEER REGSITARTION CERTFICATE.pdf | 27 Aug 2022 |
| PROFORMA AOS AS PER GOKFile: proforma AOS.pdf | 27 Aug 2022 |
| AFFIDAVIT FOR SOLD UNSOLD UNITSFile: affidavit for sold unsold units.pdf | 27 Aug 2022 |
| STP DRAWINGFile: STP-drawing.pdf | 27 Aug 2022 |
| CLARIFICATIONFile: clarification.pdf | 27 Aug 2022 |
| RTC, survey 138/9C2 | - |
| Mutation, survey 138/9C2 | - |
| Encumbrance Certificate, survey 138/9C2 | - |
| Conversion/Alienation Order, survey 138/9C2 | - |
| Sale/Title/Gift Deed, survey 138/9C2 | - |
| Khatha, survey 138/9C2 | - |
| Certificate issued by CA Form 1File: ca certficate_compressed.pdf | - |
| Certificate issued by Architect Form 2File: ARCHITECT CERTFICATE_compressed.pdf | - |
| Certificate issued by Engineer Form 3File: ENGINEER CERTFICATE FORM 3.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: litigation affidvait.pdf | - |
| Certificate from Chartered AccountFile: approval certficate.pdf | - |
| Balance Sheet 2020 - 2021File: BS 2022.pdf | - |
| Balance Sheet 2019 - 2020File: BS 2021.pdf | - |
| Balance Sheet 2018 - 2019File: BS 2020.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: P&L 2022.pdf | - |
| Audited Profit and Loss Statement 2019 - 2020File: P&L 2021.pdf | - |
| Audited Profit and Loss Statement 2018 - 2019File: P&L 2020.pdf | - |
| Cash Flow Statement 2020 - 2021File: IS 2022_compressed.pdf | - |
| Cash Flow Statement 2019 - 2020File: IS 2021.pdf | - |
| Auditor's Report 2020 - 2021File: AR.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: ITR 2022-23.pdf | - |
| Income Tax Return Acknowledgement 2019 - 2020File: ITR 2021-22.pdf | - |
| building licence | - |
| sanction plan | - |
| single layout | - |
| sanction plan | - |
| sanction plan | - |
| sanction plan | - |
| specification | - |
| single layout | - |
| single layout | - |
| stability certficate | - |
| TITLE DEED | - |
| conversion order | - |
| conversion order | - |
| proforma AOS | - |
| proforma allotment letter | - |
| broucher final | - |
| form b_compressed | - |
| affidavit 3(1) | - |
| mescom noc_compressed | - |
| water noc | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| dana patra_compressed | - |
| Occupancy certificate | - |
| bank affidavit | - |
| affidavith for bank account | - |
| mescom fee receipt | - |
| guidance value | - |
| Occupancy CertificateFile: Occupancy certificate.pdf | - |
| Completion certificate issued by the competent authorityFile: Occupancy certificate.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Udupi
Computed across the 260+ Udupi projects on ReraGenie, from their own filings.
Keep MEHAAN RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Udupi260+ in Udupi
Filed coordinates, straight-line distance. 45 registered projects within 2 km.
MANDAVI DOWNTOWN
MANDAVI CONSTRUCTIONS
MANDAVI ROYAL GARDEN
MANDAVI INFRASTRUCTURES
SAI RADHA TOWNSHIP
MS SAI RADHA DEVELOPERS
ARCHANA SIGNATURE
ARCHANA PROJECTS
PLATINUM BY INTECH DEVELOPERS
INTECH DEVELOPERS
OPULENCE
ONYX ASSETS LLP
See every Udupi project, with the district possession charts
Builder: P ANANDA SHETTY
P ANANDA SHETTY has 1 registration on RERA Karnataka, including MEHAAN RESIDENCY. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Udupi district page.
Frequently asked questions
What are my rights if MEHAAN RESIDENCY is delayed beyond 7 Jun 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of MEHAAN RESIDENCY?
The registered promoter entity is P ANANDA SHETTY, a proprietorship firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in MEHAAN RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at MEHAAN RESIDENCY?
The professionals named in the filing: Architect: JAIKISHAN; Engineer: PRAKASH KUMAR SHETTY; Chartered Accountant: SRINIDHI RAO. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MEHAAN RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback