Home / Browse projects / Udupi, Karnataka / SAI RADHA TOWNSHIP
SAI RADHA TOWNSHIP
RG-KA-81535 · RERA PRM/KA/RERA/1273/318/PR/300124/006597 · Last updated on RERA Karnataka portal: 12 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SAI RADHA TOWNSHIP is a Residential/Group Housing project by MS SAI RADHA DEVELOPERS in Udupi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1273/318/PR/300124/006597 on 30 Jan 2024. Possession is promised by 31 Dec 2030. 30 of the 78 units on this registration are recorded sold or booked, and 0 of 16 construction stages are filed complete.
At a glance
Project
- NameSAI RADHA TOWNSHIP
- TypeResidential/Group Housing
- Location
- Udupi
- 576102
- Pincode576102
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1273/318/PR/300124/006597
- ReraGenie IDRG-KA-81535
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on30 Jan 2024
- Promised completion31 Dec 2030
- Revised completionNone
- Buildings5 building records
- Documents filed167 files
Current status
Figures as on 12 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SAI RADHA TOWNSHIP-TYPE 1 | - | - | - | 9 | 0 | 9 |
| SAI RADHA TOWNSHIP-TYPE 2 | - | - | - | 21 | 0 | 21 |
| SAI RADHA TOWNSHIP-TYPE 3 | - | - | - | 22 | 0 | 22 |
| SAI RADHA TOWNSHIP-TYPE 4 | - | - | - | 10 | 0 | 10 |
| SAI RADHA TOWNSHIP-TYPE 5 | - | - | - | 16 | 0 | 16 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 12 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 16 construction stages are filed complete. The stage furthest along is Plastering inside, at 39%.
Building: 24% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 37% |
| Foundation footing work | 37% |
| Upto Plinth Level | 30% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 37% |
| Retaining wall (All types) | 5% |
| RCC or MS Framed structure | 38% |
| Masonry Construction | 38% |
| Plastering inside , outside & Ceiling | 39% |
| Joinery: Doors, Windows, Ventilators etc | 16% |
| Basic work of Water supply, Sanitary and Electrification | 5% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 30% |
| Railing and Grill fixing | 18% |
| Electrification, Water supply and Sanitary Finishing | 28% |
| Painting | 17% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 5% |
Progress on shared amenities40
As on 12 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 5% |
| Sewage and Drainage System | Yes | 6% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | 3% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | Yes | 0% |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | No | Not applicable |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | No | Not applicable |
| Terrace | No | Not applicable |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership9
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SAI RADHA DEVELOPERS | - | - |
| SAI RADHA DEVELOPERS | - | - |
| SAI RADHA DEVELOPERS | - | - |
| SAI RADHA DEVELOPERS | - | - |
| SAI RADHA DEVELOPERS | - | - |
| SAI RADHA DEVELOPERS | - | - |
| SAI RADHA DEVELOPERS | - | - |
| SAI RADHA DEVELOPERS | - | - |
| SAI RADHA DEVELOPERS | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 89.33 cr | Rs 32.45 cr |
| - | NA | Rs 8.38 cr | Rs 3.38 cr |
| - | NA | Rs 2.00 cr | - |
| - | NA | Rs 1.65 cr | Rs 3.36 cr |
| - | NA | Rs 89.33 lakh | Rs 12.50 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SHALINI SURESH |
| Engineer | RAVEENDRA ACHARYA |
| Chartered Accountant | ROY ALAN MATHIAS |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed167
As listed on the registration, under the names the promoter filed them with; the newest 80 of 167 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1273/318/PR/300124/006597 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: ca certificate.pdf | 12 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: SYS CREATOR - Architect Certificate.pdf | 12 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: SYS CREATOR - Engineers certificate.pdf | 12 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: CA.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Arch.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Eng.pdf | 14 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CA certificate.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: architect certificate.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: eng certificate.pdf | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CA.pdf | 29 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Architect.pdf | 29 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: eng.pdf | 29 Jan 2026 |
| sale deed for sno 297 in favour of developerFile: sale deed 297_compressed.pdf | 27 Jan 2024 |
| conversion order for sno 352/1b1 measuring 0-30 guntasFile: converstion 30 cents.pdf | 27 Jan 2024 |
| Amenities and common area certified by engineerFile: amenities certified by engineer.pdf | 27 Jan 2024 |
| self attested engineer licenceFile: engineer licence self attested.pdf | 27 Jan 2024 |
| proforma of the Agreement for SaleFile: proforma AOS.pdf | 27 Jan 2024 |
| proforma of the Allotment letterFile: proforma allotment letter.pdf | 27 Jan 2024 |
| water noc-self attestedFile: water noc self attested.pdf | 27 Jan 2024 |
| power noc self attestedFile: mescom noc self atested.pdf | 27 Jan 2024 |
| clariifcationFile: CLARIFICATION.pdf | 27 Jan 2024 |
| RTC, survey 352/1B2 | - |
| Mutation, survey 352/1B2 | - |
| Encumbrance Certificate, survey 352/1B2 | - |
| Conversion/Alienation Order, survey 352/1B2 | - |
| Sale/Title/Gift Deed, survey 352/1B2 | - |
| Khatha, survey 352/1B2 | - |
| RTC, survey 352/1B2 | - |
| Mutation, survey 352/1B2 | - |
| Encumbrance Certificate, survey 352/1B2 | - |
| Conversion/Alienation Order, survey 352/1B2 | - |
| Sale/Title/Gift Deed, survey 352/1B2 | - |
| Khatha, survey 352/1B2 | - |
| RTC, survey 352/1B2 | - |
| Mutation, survey 352/1B2 | - |
| Encumbrance Certificate, survey 352/1B2 | - |
| Conversion/Alienation Order, survey 352/1B2 | - |
| Sale/Title/Gift Deed, survey 352/1B2 | - |
| Khatha, survey 352/1B2 | - |
| RTC, survey 297 | - |
| Mutation, survey 297 | - |
| Encumbrance Certificate, survey 297 | - |
| Conversion/Alienation Order, survey 297 | - |
| Sale/Title/Gift Deed, survey 297 | - |
| Khatha, survey 297 | - |
| RTC, survey 352/1B1-P1 | - |
| Mutation, survey 352/1B1-P1 | - |
| Encumbrance Certificate, survey 352/1B1-P1 | - |
| Conversion/Alienation Order, survey 352/1B1-P1 | - |
| Sale/Title/Gift Deed, survey 352/1B1-P1 | - |
| Khatha, survey 352/1B1-P1 | - |
| RTC, survey 352/1B 1 | - |
| Mutation, survey 352/1B 1 | - |
| Encumbrance Certificate, survey 352/1B 1 | - |
| Conversion/Alienation Order, survey 352/1B 1 | - |
| Sale/Title/Gift Deed, survey 352/1B 1 | - |
| Khatha, survey 352/1B 1 | - |
| RTC, survey 352/4 | - |
| Mutation, survey 352/4 | - |
| Encumbrance Certificate, survey 352/4 | - |
| Conversion/Alienation Order, survey 352/4 | - |
| Sale/Title/Gift Deed, survey 352/4 | - |
| Khatha, survey 352/4 | - |
| RTC, survey 365/2 | - |
| Mutation, survey 365/2 | - |
| Encumbrance Certificate, survey 365/2 | - |
| Conversion/Alienation Order, survey 365/2 | - |
| Sale/Title/Gift Deed, survey 365/2 | - |
| Khatha, survey 365/2 | - |
| RTC, survey 352/3 | - |
| Mutation, survey 352/3 | - |
| Encumbrance Certificate, survey 352/3 | - |
| Conversion/Alienation Order, survey 352/3 | - |
| Sale/Title/Gift Deed, survey 352/3 | - |
| Khatha, survey 352/3 | - |
| Registration CertificateFile: Form-C.pdf | - |
| Partnership DeedFile: partnership deed 2004.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| SAI RADHA NITHYADHAM | SURVEY NO-30-35 OF NO. 76 BADAGUBETTU VILLAGE IN UDUPI | Ongoing | Dec 2027 | Not due yet |
| SAI RADHA PRAKRITI | "SAI RADHA PRAKRUTHI" AT S.NO.51/40&51/41OF PADEBETTU VILLAGE , KAUP TALUK & UDUPI | Ongoing | Mar 2025 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Udupi
Computed across the 260+ Udupi projects on ReraGenie, from their own filings.
Keep SAI RADHA TOWNSHIP on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Udupi260+ in Udupi
Filed coordinates, straight-line distance. 13 registered projects within 2 km.
MANDAVI DOWNTOWN
MANDAVI CONSTRUCTIONS
MANDAVI ROYAL GARDEN
MANDAVI INFRASTRUCTURES
ARCHANA SIGNATURE
ARCHANA PROJECTS
PLATINUM BY INTECH DEVELOPERS
INTECH DEVELOPERS
OPULENCE
ONYX ASSETS LLP
WESTEND HERITAGE
INDIAN DEVELOPERS
See every Udupi project, with the district possession charts
Builder: MS SAI RADHA DEVELOPERS
MS SAI RADHA DEVELOPERS has 2 registrations on RERA Karnataka, including SAI RADHA NITHYADHAM and SAI RADHA TOWNSHIP. Its filings disclose 2 earlier RERA Karnataka projects, none completed yet. Read the full track record. See more projects on the Udupi district page.
Frequently asked questions
What are my rights if SAI RADHA TOWNSHIP is delayed beyond 31 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SAI RADHA TOWNSHIP?
The registered promoter entity is MS SAI RADHA DEVELOPERS, a partnership firm as per the filing. Its GSTIN 29AAYFS8343N1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SAI RADHA TOWNSHIP?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SAI RADHA TOWNSHIP?
The professionals named in the filing: Architect: SHALINI SURESH; Engineer: RAVEENDRA ACHARYA; Chartered Accountant: ROY ALAN MATHIAS. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAI RADHA TOWNSHIP?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback