MEGHNA CITY
RG-MH-26624 · RERA P52000009526 · Last updated on MahaRERA portal: 5 Mar 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 36 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MEGHNA CITY is a Others project by MEGHNA BUILDERS in Raigarh, Maharashtra, registered with MahaRERA as P52000009526 on 22 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 126 of the 178 units on this registration are recorded sold or booked, and 20 of 22 construction stages are filed complete.
At a glance
Project
- NameMEGHNA CITY
- TypeOthers
- Location
- KOLAD
- Roha
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000009526
- ReraGenie IDRG-MH-26624
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Aug 2017
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
- Buildings2 building records
- Documents filed87 files
Current status
Figures as on 5 Mar 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 9 | 8 | 63 | 19 | 82 |
| C WING | NA | 9 | 8 | 90 | 6 | 96 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 5 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
A WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 5 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 50% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed2
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A WING | 1 | 1 |
| C WING | 1 | 1 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A WING | NA | Rs 8.69 cr | Rs 8.60 cr |
| C WING | NA | Rs 8.69 cr | Rs 8.60 cr |
| - | NA | Rs 3.56 cr | Rs 2.34 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DHARMESH V BHALANI |
| Engineer | Mehul Dudhat |
| Engineer | SOMESH KUMAR |
| Chartered Accountant | Mehul R Jain & Associates |
| Chartered Accountant | PRANAV SHAH & CO. |
| Chartered Accountant | SURANA ASHISH & ASSOCIATES |
| Partner | Role in project |
|---|---|
| MEGHNA BUILDERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterTHE CONSTRUCTION OF BUILDINGS IS ALREADY COMPLETED AND IT HAS BEEN SUBMITTED FOR OC TO ALIBAG
Reason as filed by the promoterImpact of Pandemic and Rising Construction Material Costs: The COVID-19 pandemic has had a profound and far-reaching impact on the construction industry, both locally and globally. As a direct consequence of the pandemic, there has been a significant and sustained increase in the prices of essential construction materials, including but not limited to cement, steel, copper, electrical components, plumbing materials, and paints. This escalation in material costs has resulted in severe financial strain, disrupting the supply chain and leading to delays in procurement and delivery of these materi
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Aug 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Aug 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed87
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1_ DEC 25_MEGHANA CITY.pdf | 5 Mar 2026 |
| Withdrawal Update Form 2File: FORM 2 _ DEC 25_MEGHANA CITY.pdf | 5 Mar 2026 |
| Withdrawal Update Form 3File: FORM 3 _ DEC 25_MEGHANA CITY.pdf | 5 Mar 2026 |
| Withdrawal Update Form 1File: 3 FORM 1_JUNE 2025.pdf | 7 Jan 2026 |
| Withdrawal Update Form 1File: 4 FORM 1_SEPTEMBER 2025.pdf | 7 Jan 2026 |
| Withdrawal Update Form 2File: 7_FORM 2_JUNE 2025.pdf | 7 Jan 2026 |
| Withdrawal Update Form 2File: 8_FORM 2_SEPTEMBER 2025.pdf | 7 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3_ JUNE 25_ MEGHNA CITY_compressed.pdf | 7 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3_ SEP 25_ MEGNA CITY_compressed.pdf | 7 Jan 2026 |
| Form 2A (FY 2024-2025)File: Form 2A _24-25_meghana.pdf | 7 Jan 2026 |
| Form 2A (FY 2023-2024)File: Form 2A_23-24 meghana.pdf | 7 Jan 2026 |
| Form 5 (FY 2024-2025)File: FORM 5 _FY 2024-25.pdf | 7 Jan 2026 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 20 Apr 2025 |
| Certificates of CA (Form 3)File: form-3_compressed.pdf | 20 Apr 2025 |
| Certificates of CA (Form 5)File: form-5.pdf | 20 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf | 20 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM -2A-2020.pdf | 13 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A-2021.pdf | 13 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 meghna city 18-19.pdf | 1 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 meghna city 19-20.pdf | 1 Feb 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: DOCUMENT.pdf | 20 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5.pdf | 30 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Meghna City.pdf | 24 Feb 2022 |
| Certificates of CA (Form 5)File: FORM 5 RERA AUDIT.pdf | 23 Nov 2019 |
| Certificates of CA (Form 5)File: meghna city.pdf | 29 Sep 2018 |
| OtherFile: 1.pdf | 15 Feb 2018 |
| OtherFile: 2.pdf | 15 Feb 2018 |
| OtherFile: 3.pdf | 15 Feb 2018 |
| OtherFile: 4.pdf | 15 Feb 2018 |
| OtherFile: 5.pdf | 15 Feb 2018 |
| Building plan approvalFile: AREA STETEMENT.pdf | 1 Aug 2017 |
| Building plan approvalFile: TYPE -1 (WING A).pdf | 1 Aug 2017 |
| Building plan approvalFile: TYPE-1 (WING -A-3).pdf | 1 Aug 2017 |
| Building plan approvalFile: TYPE-2 (WING B) 5.pdf | 1 Aug 2017 |
| Building plan approvalFile: TYPE-2 (WING B).pdf | 1 Aug 2017 |
| Layout approvalFile: AREA STETEMENT.pdf | 1 Aug 2017 |
| PAN CardFile: FIRM PAN.pdf | 1 Aug 2017 |
| Copy of the legal title reportFile: 1.pdf | 1 Aug 2017 |
| Copy of the legal title reportFile: 2.pdf | 1 Aug 2017 |
| Copy of the legal title reportFile: 3.pdf | 1 Aug 2017 |
| Copy of the legal title reportFile: 4.pdf | 1 Aug 2017 |
| Copy of the legal title reportFile: 1.pdf | 1 Aug 2017 |
| Copy of the legal title reportFile: 2.pdf | 1 Aug 2017 |
| Copy of the legal title reportFile: 3.pdf | 1 Aug 2017 |
| Copy of the legal title reportFile: 4.pdf | 1 Aug 2017 |
| Copy of the legal title reportFile: 5.pdf | 1 Aug 2017 |
| Copy of the legal title reportFile: 1.pdf | 1 Aug 2017 |
| Copy of the legal title reportFile: 2.pdf | 1 Aug 2017 |
| Copy of the legal title reportFile: 3.pdf | 1 Aug 2017 |
| Copy of the legal title reportFile: 4.pdf | 1 Aug 2017 |
| Copy of the legal title reportFile: 5.pdf | 1 Aug 2017 |
| Details of encumbrancesFile: DATE OF ENCUR.pdf | 1 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: AREA STETEMENT.pdf | 1 Aug 2017 |
| Building Plan Approval (IOD)File: AREA STETEMENT.pdf | 1 Aug 2017 |
| Building Plan Approval (IOD)File: TYPE -1 (WING A).pdf | 1 Aug 2017 |
| Building Plan Approval (IOD)File: TYPE-1 (WING -A-3).pdf | 1 Aug 2017 |
| Building Plan Approval (IOD)File: TYPE-2 (WING B) 5.pdf | 1 Aug 2017 |
| Building Plan Approval (IOD)File: TYPE-2 (WING B).pdf | 1 Aug 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: 1.pdf | 1 Aug 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: 2.pdf | 1 Aug 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: 3.pdf | 1 Aug 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: 5.pdf | 1 Aug 2017 |
| Declaration in FORM BFile: 1.pdf | 1 Aug 2017 |
| Declaration in FORM BFile: 2.pdf | 1 Aug 2017 |
| Declaration in FORM BFile: 3.pdf | 1 Aug 2017 |
| Declaration in FORM BFile: 4.pdf | 1 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARTICTECT CERTIIFICATE.pdf | 1 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TABLE -B.pdf | 1 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TYPE1 A WING.pdf | 1 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TYPE-2 B WING.pdf | 1 Aug 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1.pdf | 1 Aug 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2.pdf | 1 Aug 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3.pdf | 1 Aug 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4.pdf | 1 Aug 2017 |
| Certificates of CA (Form 3)File: 1.pdf | 1 Aug 2017 |
| Certificates of CA (Form 3)File: 2.pdf | 1 Aug 2017 |
| Certificates of CA (Form 3)File: 3.pdf | 1 Aug 2017 |
| Certificates of CA (Form 3)File: 4.pdf | 1 Aug 2017 |
| Certificates of CA (Form 3)File: 5.pdf | 1 Aug 2017 |
| Certificates of CA (Form 3)File: 6.pdf | 1 Aug 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 87 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MEGHNA CITY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KOLAD5,900+ in Raigarh
Filed coordinates, straight-line distance. 5 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: MEGHNA BUILDERS
MEGHNA BUILDERS has 3 registrations on MahaRERA, including MEGHNA CITY and MEGHNA SEVEN. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if MEGHNA CITY is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MEGHNA CITY?
The registered promoter entity is MEGHNA BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MEGHNA CITY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MEGHNA CITY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MEGHNA CITY?
The professionals named in the filing: Architect: DHARMESH V BHALANI; Engineer: Mehul Dudhat; Engineer: SOMESH KUMAR; Chartered Accountant: Mehul R Jain & Associates; Chartered Accountant: PRANAV SHAH & CO.; Chartered Accountant: SURANA ASHISH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MEGHNA CITY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback