Completed No litigation declared Residential / Group Housing project

MEERA BHAKTI RESIDENCY

By SHP Properties Private Limited

RG-MH-00381 · RERA P53000000915 · Last updated on MahaRERA portal: 10 Jul 2020

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Oct 2018Possession promisedregistration recorded completed
22 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

MEERA BHAKTI RESIDENCY is a Residential / Group Housing project by SHP Properties Private Limited in Kolhapur, Maharashtra, registered with MahaRERA as P53000000915 on 25 Jul 2017. The registration is recorded completed; possession was promised by 20 Oct 2018.

At a glance

Project

  • NameMEERA BHAKTI RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • RANKALA ROAD
    • A WARD
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416012
  • Pincode416012
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000000915
  • ReraGenie IDRG-MH-00381

Builder

  • NameSHP Properties Private Limited
  • Entity typeCompany
  • Managing DirectorSHANKAR HINDURAO PATIL
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2017PromisedOct 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Jul 2017
  • Promised completion20 Oct 2018
  • Revised completionNone
  • Buildings3 building records
  • Documents filed56 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA150000
C WINGNA130000
B WINGNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 10 Jul 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.

A WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Jul 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed168

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots168
Closed/Covered168
BuildingClosed/CoveredTotal
A WING128128
C WING2525
B WING1515

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,050 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI15839.49
Proposed, not sanctioned12,514 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS-3 TO 7, ROYAL HERITAGE BUILDING, OPP TO BASANT BAHAR THEATER, ASSEMBLY ROAD, KOLHAPUR-416001, MAHA

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAVESANA ARCHITECTS AND INTERIOR DESIGNERS
EngineerDR A B KULKARNI AND ASSOCIATES
PartnerRole in project
SHP Properties Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Apr 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Apr 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Jul 2020

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate-Wing-A.pdf10 Jul 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate-Wing-C.pdf10 Jul 2020
Certificates of CA (Form 5)File: Certificate Of CA (Form 5).pdf19 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate Of Engineer- Wing C- September 2018.pdf17 Oct 2018
Certificates of CA (Form 3)File: Certificate of C A- Wing -C - September 2018.pdf17 Oct 2018
Certificates of Architect (Form 4)File: Architect,s Certificate From No-4 (C Wing).pdf13 Oct 2018
OtherFile: Completion Certificate-Wing-A.pdf13 Oct 2018
OtherFile: Completion Certificate-Wing-C.pdf13 Oct 2018
Proforma of Allotment letterFile: Rera AgreementDraft Final (B Wing).pdf18 Apr 2018
Building plan approvalFile: Basement Floor.pdf13 Apr 2018
Building plan approvalFile: Stilt Floor.pdf13 Apr 2018
Building plan approvalFile: First Floor.pdf13 Apr 2018
Building plan approvalFile: Second and Third Floor.pdf13 Apr 2018
Building plan approvalFile: Fourth and Fifth Floor.pdf13 Apr 2018
Building plan approvalFile: Section Plan.pdf13 Apr 2018
Building plan approvalFile: Site Plan.pdf13 Apr 2018
Copy of the legal title reportFile: Serach Reports 1316-1.pdf13 Apr 2018
Copy of the legal title reportFile: Serach Reports-1319-1.pdf13 Apr 2018
Building Plan Approval (IOD)File: Basement Floor.pdf13 Apr 2018
Building Plan Approval (IOD)File: Stilt Floor.pdf13 Apr 2018
Building Plan Approval (IOD)File: First Floor.pdf13 Apr 2018
Building Plan Approval (IOD)File: Second and Third Floor.pdf13 Apr 2018
Building Plan Approval (IOD)File: Fourth and Fifth Floor.pdf13 Apr 2018
Building Plan Approval (IOD)File: Section Plan.pdf13 Apr 2018
Building Plan Approval (IOD)File: Site Plan.pdf13 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: New Prarabha Pramanpatra-1.pdf13 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate -B.pdf13 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate -C.pdf13 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf13 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginers Certificates -C.pdf13 Apr 2018
Building plan approvalFile: Saction Plan Copy 9- Wing C.pdf27 Oct 2017
Building plan approvalFile: Saction Plan Copy 8- Wing C.pdf27 Oct 2017
Building plan approvalFile: Saction Plan Copy 9- Wing C.pdf27 Oct 2017
Building plan approvalFile: Saction Plan Copy 10- Wing C.pdf27 Oct 2017
Building Plan Approval (IOD)File: Saction Plan Copy 9- Wing C.pdf27 Oct 2017
Building Plan Approval (IOD)File: Saction Plan Copy 8- Wing C.pdf27 Oct 2017
Building Plan Approval (IOD)File: Saction Plan Copy 9- Wing C.pdf27 Oct 2017
Building Plan Approval (IOD)File: Saction Plan Copy 10- Wing C.pdf27 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate of Architects form -1 -Sept-2017.pdf27 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate of Engineers-Form-2-Sept-17.pdf27 Oct 2017
Certificates of CA (Form 3)File: Certificate of C A Form -3-Spet-2017.pdf27 Oct 2017
Proforma of Allotment letterFile: Rera Meera Bhakti C Draft Agreement 21 7 2017 Fifth.pdf27 Oct 2017
Declaration in FORM BFile: Decalaration From B.pdf14 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate Of Architect Form-1.pdf14 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate of Engineers Form -2.pdf14 Jul 2017
Certificates of CA (Form 3)File: SHP RERA CERTIFICATE Form-3.pdf14 Jul 2017
Certificates of Architect (Form 4)File: Architects Certificate Form-4.pdf14 Jul 2017
Building plan approvalFile: Saction Plan Copy 11- Wing C.pdf8 Jul 2017
Layout approvalFile: Layout Approved.pdf8 Jul 2017
PAN CardFile: SHP Properties Pvt Ltd.pdf8 Jul 2017
Copy of the legal title reportFile: 1 Legal _title_Report_Serarch_Report.pdf8 Jul 2017
Details of encumbrancesFile: Details of Encumbrances 3.pdf8 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Approved.pdf8 Jul 2017
Building Plan Approval (IOD)File: Saction Plan Copy 11- Wing C.pdf8 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Comencment Certificate -2017.pdf8 Jul 2017
Proforma of Allotment letterFile: Allotment letter.pdf8 Jul 2017

How this compares with Kolhapur

17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is completed

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep MEERA BHAKTI RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near A WARD880+ in Kolhapur

2 kmMEERA BHAKTI RESIDENCYCompleted 25Lapsed / revoked 11Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 60 registered projects within 2 km.

Builder: SHP Properties Private Limited

SHP Properties Private Limited has 2 registrations on MahaRERA, including MEERA BHAKTI RESIDENCY and MEERABHAKTI RESIDENCY WING B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if MEERA BHAKTI RESIDENCY is delayed beyond 20 Oct 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MEERA BHAKTI RESIDENCY?

The registered promoter entity is SHP Properties Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MEERA BHAKTI RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MEERA BHAKTI RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MEERA BHAKTI RESIDENCY?

The professionals named in the filing: Architect: AVESANA ARCHITECTS AND INTERIOR DESIGNERS; Engineer: DR A B KULKARNI AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MEERA BHAKTI RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MEERA BHAKTI RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MEERA BHAKTI RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.