MEERA BHAKTI RESIDENCY
By SHP Properties Private Limited
RG-MH-00381 · RERA P53000000915 · Last updated on MahaRERA portal: 10 Jul 2020
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MEERA BHAKTI RESIDENCY is a Residential / Group Housing project by SHP Properties Private Limited in Kolhapur, Maharashtra, registered with MahaRERA as P53000000915 on 25 Jul 2017. The registration is recorded completed; possession was promised by 20 Oct 2018.
At a glance
Project
- NameMEERA BHAKTI RESIDENCY
- TypeResidential / Group Housing
- Location
- RANKALA ROAD
- A WARD
- Kolhapur (M Corp.)
- Karvir
- Kolhapur
- 416012
- Pincode416012
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53000000915
- ReraGenie IDRG-MH-00381
Builder
- NameSHP Properties Private Limited
- Entity typeCompany
- Managing DirectorSHANKAR HINDURAO PATIL
- Other registrations1 more →
- Completed1 of 2
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on25 Jul 2017
- Promised completion20 Oct 2018
- Revised completionNone
- Buildings3 building records
- Documents filed56 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 15 | 0 | 0 | 0 | 0 |
| C WING | NA | 13 | 0 | 0 | 0 | 0 |
| B WING | NA | 13 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 10 Jul 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.
A WING100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C WING100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B WING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 10 Jul 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed168
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A WING | 128 | 128 |
| C WING | 25 | 25 |
| B WING | 15 | 15 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AVESANA ARCHITECTS AND INTERIOR DESIGNERS |
| Engineer | DR A B KULKARNI AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| SHP Properties Private Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Apr 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Apr 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 10 Jul 2020
Documents filed56
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate-Wing-A.pdf | 10 Jul 2020 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate-Wing-C.pdf | 10 Jul 2020 |
| Certificates of CA (Form 5)File: Certificate Of CA (Form 5).pdf | 19 Dec 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate Of Engineer- Wing C- September 2018.pdf | 17 Oct 2018 |
| Certificates of CA (Form 3)File: Certificate of C A- Wing -C - September 2018.pdf | 17 Oct 2018 |
| Certificates of Architect (Form 4)File: Architect,s Certificate From No-4 (C Wing).pdf | 13 Oct 2018 |
| OtherFile: Completion Certificate-Wing-A.pdf | 13 Oct 2018 |
| OtherFile: Completion Certificate-Wing-C.pdf | 13 Oct 2018 |
| Proforma of Allotment letterFile: Rera AgreementDraft Final (B Wing).pdf | 18 Apr 2018 |
| Building plan approvalFile: Basement Floor.pdf | 13 Apr 2018 |
| Building plan approvalFile: Stilt Floor.pdf | 13 Apr 2018 |
| Building plan approvalFile: First Floor.pdf | 13 Apr 2018 |
| Building plan approvalFile: Second and Third Floor.pdf | 13 Apr 2018 |
| Building plan approvalFile: Fourth and Fifth Floor.pdf | 13 Apr 2018 |
| Building plan approvalFile: Section Plan.pdf | 13 Apr 2018 |
| Building plan approvalFile: Site Plan.pdf | 13 Apr 2018 |
| Copy of the legal title reportFile: Serach Reports 1316-1.pdf | 13 Apr 2018 |
| Copy of the legal title reportFile: Serach Reports-1319-1.pdf | 13 Apr 2018 |
| Building Plan Approval (IOD)File: Basement Floor.pdf | 13 Apr 2018 |
| Building Plan Approval (IOD)File: Stilt Floor.pdf | 13 Apr 2018 |
| Building Plan Approval (IOD)File: First Floor.pdf | 13 Apr 2018 |
| Building Plan Approval (IOD)File: Second and Third Floor.pdf | 13 Apr 2018 |
| Building Plan Approval (IOD)File: Fourth and Fifth Floor.pdf | 13 Apr 2018 |
| Building Plan Approval (IOD)File: Section Plan.pdf | 13 Apr 2018 |
| Building Plan Approval (IOD)File: Site Plan.pdf | 13 Apr 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: New Prarabha Pramanpatra-1.pdf | 13 Apr 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate -B.pdf | 13 Apr 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate -C.pdf | 13 Apr 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf | 13 Apr 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginers Certificates -C.pdf | 13 Apr 2018 |
| Building plan approvalFile: Saction Plan Copy 9- Wing C.pdf | 27 Oct 2017 |
| Building plan approvalFile: Saction Plan Copy 8- Wing C.pdf | 27 Oct 2017 |
| Building plan approvalFile: Saction Plan Copy 9- Wing C.pdf | 27 Oct 2017 |
| Building plan approvalFile: Saction Plan Copy 10- Wing C.pdf | 27 Oct 2017 |
| Building Plan Approval (IOD)File: Saction Plan Copy 9- Wing C.pdf | 27 Oct 2017 |
| Building Plan Approval (IOD)File: Saction Plan Copy 8- Wing C.pdf | 27 Oct 2017 |
| Building Plan Approval (IOD)File: Saction Plan Copy 9- Wing C.pdf | 27 Oct 2017 |
| Building Plan Approval (IOD)File: Saction Plan Copy 10- Wing C.pdf | 27 Oct 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate of Architects form -1 -Sept-2017.pdf | 27 Oct 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate of Engineers-Form-2-Sept-17.pdf | 27 Oct 2017 |
| Certificates of CA (Form 3)File: Certificate of C A Form -3-Spet-2017.pdf | 27 Oct 2017 |
| Proforma of Allotment letterFile: Rera Meera Bhakti C Draft Agreement 21 7 2017 Fifth.pdf | 27 Oct 2017 |
| Declaration in FORM BFile: Decalaration From B.pdf | 14 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate Of Architect Form-1.pdf | 14 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate of Engineers Form -2.pdf | 14 Jul 2017 |
| Certificates of CA (Form 3)File: SHP RERA CERTIFICATE Form-3.pdf | 14 Jul 2017 |
| Certificates of Architect (Form 4)File: Architects Certificate Form-4.pdf | 14 Jul 2017 |
| Building plan approvalFile: Saction Plan Copy 11- Wing C.pdf | 8 Jul 2017 |
| Layout approvalFile: Layout Approved.pdf | 8 Jul 2017 |
| PAN CardFile: SHP Properties Pvt Ltd.pdf | 8 Jul 2017 |
| Copy of the legal title reportFile: 1 Legal _title_Report_Serarch_Report.pdf | 8 Jul 2017 |
| Details of encumbrancesFile: Details of Encumbrances 3.pdf | 8 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout Approved.pdf | 8 Jul 2017 |
| Building Plan Approval (IOD)File: Saction Plan Copy 11- Wing C.pdf | 8 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Comencment Certificate -2017.pdf | 8 Jul 2017 |
| Proforma of Allotment letterFile: Allotment letter.pdf | 8 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Kolhapur
Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 56 filed documents as one ZIP, foldered, with a manifest
Keep MEERA BHAKTI RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near A WARD880+ in Kolhapur
Filed coordinates, straight-line distance. 60 registered projects within 2 km.
GRUHALAXMI RACHANA
BATU BUILDERS
SRI SRI RESIDENCY
SRI SRI BUILDERS AND DEVELOPERS PROPRIETOR
ONE EARTH
DESHPANDE INFRA
DRONAGIRI
ASHTIN INDIA PVT LTD
JEWEL SQUARE
RATNARAJ BUILDERS AND DEVELOPERS
SAPPHIRE SKY
S.S.Builders and Developers
See every Kolhapur project, with the district possession charts
Builder: SHP Properties Private Limited
SHP Properties Private Limited has 2 registrations on MahaRERA, including MEERA BHAKTI RESIDENCY and MEERABHAKTI RESIDENCY WING B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.
Frequently asked questions
What are my rights if MEERA BHAKTI RESIDENCY is delayed beyond 20 Oct 2018?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MEERA BHAKTI RESIDENCY?
The registered promoter entity is SHP Properties Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MEERA BHAKTI RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MEERA BHAKTI RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MEERA BHAKTI RESIDENCY?
The professionals named in the filing: Architect: AVESANA ARCHITECTS AND INTERIOR DESIGNERS; Engineer: DR A B KULKARNI AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MEERA BHAKTI RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback