Home / Browse projects / Raigarh, Maharashtra / MAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD
MAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD
By MAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD
RG-MH-02892 · RERA P52000020545 · Last updated on MahaRERA portal: 6 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 66 months
- 4 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD is a Residential / Group Housing project by MAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD in Raigarh, Maharashtra, registered with MahaRERA as P52000020545 on 22 Apr 2019. Possession is promised by 30 Jun 2028. The completion date has moved by 66 months from the original filing. 87 of the 117 units on this registration are recorded sold or booked, and 9 of 22 construction stages are filed complete.
At a glance
Project
- NameMAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD
- TypeResidential / Group Housing
- Location
- TRANS RAILWAY AREA
- NEW PANVEL (W)
- New Panvel
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000020545
- ReraGenie IDRG-MH-02892
Builder
- NameMAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD
- Entity typeSociety
- GSTIN27AADAM1205D1Z8
- ChairpersonPRAKASH P PARKAR
- SecretoryNANDKUMAR V SONSURKAR
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Apr 2019
- Promised completion30 Jun 2028
- Revised completionRevised to 30 Jun 2028 (originally 30 Dec 2022)
- Buildings2 building records
- Documents filed264 files
Current status
Figures as on 6 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD | NA | 14 | 13 | 117 | 0 | 117 |
| NA | NA | 0 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 6 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 90%.
MAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
NA0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 6 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed133
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| MAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD | New Panvel | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| MAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD | NA | Rs 26.00 cr | Rs 20.82 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | LILADHAR PARAB ARCHITECTS & DISIGNERS |
| Engineer | STRUCTWEL DESIGNERS & CONSULTANTS PVT LTD |
| Engineer | Yogesh HIralal Reshwal |
| Chartered Accountant | B N DUDANI & CO |
| Chartered Accountant | Amitha V Shetty |
| Partner | Role in project |
|---|---|
| MAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to introduction of UDCPR there were many changes in the development control regulations. Hence we had to take approval of amended plans for which NOC from CIDCO was necessary. There were some issues in CIDCO regarding issuance of NOC and hence it took quite some time for the same. Hence approval of amended plans is delayed. Hence we request for extension of a year for our project completion.
Reason as filed by the promoterDue to introduction of UDCPR there were many changes in the development control regulations. Hence we had to take approval of amended plans for which NOC from CIDCO was necessary. There were some issues in CIDCO regarding issuance of NOC and hence it took quite some time for the same. Hence approval of amended plans is delayed. Hence we request for extension of a year for our project completion.
Reason as filed by the promoterI, Mr. Prakash Parkar, hereby declare the following with respect to the project “Mazagon Dock Shree Samarth Co-Op. Hsg. Soc. Ltd.” bearing registration number P52000020545 registered under MahaRERA. We wish to explain the reasons for the delay in our project and respectfully request an extension for its completion. With the introduction of the Unified Development Control and Promotion Regulations (UDCPR), significant changes were made to development control regulations. As a result, we were required to obtain approval for amended plans, which necessitated a No Objection Certificate (NOC) from
Reason as filed by the promoterDear Sir/Ma’am, We, MAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD, hereby declare the following with respect to the project “MAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD” bearing registration number P52000020545 registered under MahaRERA 1. Status of Work Completed: We are pleased to inform you that we have completed the 100% of RCC (Reinforced Cement Concrete) work for the building. Currently, we are undertaking the finishing work, which includes plastering, flooring, electrical fittings, and other essential internal and external works. 2. Expected Timeline for Completion: We are committed to
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Apr 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Mar 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Oct 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2028
Documents filed264
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 264 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A 25-26.pdf | 6 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A 25-26.pdf | 6 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 Latest.pdf | 3 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 Latest.pdf | 3 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 Latest.pdf | 3 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Latest.pdf | 3 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Latest.pdf | 3 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Latest.pdf | 3 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 Latest.pdf | 3 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 Latest.pdf | 3 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 Latest.pdf | 3 Jul 2026 |
| Form 2A (FY 2019-2020)File: Form 2A 19-20.pdf | 3 Jul 2026 |
| Form 2A (FY 2020-2021)File: Form 2A 20-21.pdf | 3 Jul 2026 |
| Form 2A (FY 2021-2022)File: Form 2A 21-22.pdf | 3 Jul 2026 |
| Form 2A (FY 2022-2023)File: Form 2A 22-23.pdf | 3 Jul 2026 |
| Form 2A (FY 2023-2024)File: Form 2A 23-24.pdf | 3 Jul 2026 |
| Form 2A (FY 2023-2024)File: Form 2A 23-24.pdf | 3 Jul 2026 |
| Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf | 3 Jul 2026 |
| Form 5 (FY 2019-2020)File: Form 5 19-20.pdf | 3 Jul 2026 |
| Form 5 (FY 2020-2021)File: Form 5 20-21.pdf | 3 Jul 2026 |
| Form 5 (FY 2021-2022)File: Form 5 21-22.pdf | 3 Jul 2026 |
| Form 5 (FY 2022-2023)File: Form 5 22-23.pdf | 3 Jul 2026 |
| Form 5 (FY 2023-2024)File: Form 5 23-24.pdf | 3 Jul 2026 |
| Form 5 (FY 2024-2025)File: Form 5 24-25.pdf | 3 Jul 2026 |
| Form 1File: Form 1 (Q1) 19-20.pdf | 27 Jun 2026 |
| Form 2File: Form 2 -Q1 (19-20).pdf | 27 Jun 2026 |
| Form 3File: Q1.pdf | 27 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Dis Q1 (19-20).pdf | 27 Jun 2026 |
| Form 1File: Form 1 (Q2) 19-20.pdf | 27 Jun 2026 |
| Form 2File: Form 2 -Q2 (19-20).pdf | 27 Jun 2026 |
| Form 3File: Q2.pdf | 27 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Dis Q2 (19-20).pdf | 27 Jun 2026 |
| Form 1File: Form 1 (Q3) 19-20.pdf | 27 Jun 2026 |
| Form 2File: Form 2 -Q3 (19-20).pdf | 27 Jun 2026 |
| Form 3File: Q3.pdf | 27 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Dis Q3 (19-20).pdf | 27 Jun 2026 |
| Form 1File: Form 1 (Q4) 19-20.pdf | 27 Jun 2026 |
| Form 2File: Form 2 -Q4 (19-20).pdf | 27 Jun 2026 |
| Form 3File: Q4.pdf | 27 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Dis Q4 (19-20).pdf | 27 Jun 2026 |
| Form 1File: Form 1 (Q1) 20-21.pdf | 27 Jun 2026 |
| Form 2File: Form 2 -Q1 (20-21).pdf | 27 Jun 2026 |
| Form 3File: Q1.pdf | 27 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Dis Q1 (20-21).pdf | 27 Jun 2026 |
| Form 1File: Form 1 (Q2) 20-21.pdf | 27 Jun 2026 |
| Form 2File: Form 2 -Q2 (20-21).pdf | 27 Jun 2026 |
| Form 3File: Q2.pdf | 27 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Dis Q2 (20-21).pdf | 27 Jun 2026 |
| Form 1File: Form 1 (Q3) 20-21.pdf | 27 Jun 2026 |
| Form 2File: Form 2 -Q3 (20-21).pdf | 27 Jun 2026 |
| Form 3File: Q3.pdf | 27 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Dis Q3 (20-21).pdf | 27 Jun 2026 |
| Form 1File: Form 1 (Q4) 20-21.pdf | 27 Jun 2026 |
| Form 2File: Form 2 -Q4 (20-21).pdf | 27 Jun 2026 |
| Form 3File: Q4.pdf | 27 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Dis Q4 (20-21).pdf | 27 Jun 2026 |
| Form 1File: form 1.pdf | 26 Jun 2026 |
| Form 2File: Form 2.pdf | 26 Jun 2026 |
| Form 3File: Form 3.pdf | 26 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Dis Q1 21-22.pdf | 26 Jun 2026 |
| Form 1File: Form 1.pdf | 26 Jun 2026 |
| Form 2File: Form 2.pdf | 26 Jun 2026 |
| Form 3File: Form 3.pdf | 26 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Dis Q2 (21-22).pdf | 26 Jun 2026 |
| Form 1File: Form 1.pdf | 26 Jun 2026 |
| Form 2File: Form 2.pdf | 26 Jun 2026 |
| Form 3File: Form 3.pdf | 26 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Dis Q3 (21-22).pdf | 26 Jun 2026 |
| Form 1File: Form 1.pdf | 26 Jun 2026 |
| Form 2File: Form 2.pdf | 26 Jun 2026 |
| Form 3File: Form 3.pdf | 26 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Dis Q4 (21-22).pdf | 26 Jun 2026 |
| Form 1File: Form 1.pdf | 26 Jun 2026 |
| Form 2File: Form 2.pdf | 26 Jun 2026 |
| Form 3File: Form 3.pdf | 26 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Dis Q1 (22-23) Shree Samarth.pdf | 26 Jun 2026 |
| Form 1File: Form 1.pdf | 26 Jun 2026 |
| Form 2File: Form 2.pdf | 26 Jun 2026 |
| Form 3File: Form 3.pdf | 26 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Dis Q2 (22-23).pdf | 26 Jun 2026 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 264 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEW PANVEL (W)5,900+ in Raigarh
Filed coordinates, straight-line distance. 366 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: MAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD
MAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD has 1 registration on MahaRERA, including MAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if MAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD is delayed beyond 30 Jun 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD?
The registered promoter entity is MAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD, a society as per the filing. Its GSTIN 27AADAM1205D1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD?
The professionals named in the filing: Architect: LILADHAR PARAB ARCHITECTS & DISIGNERS; Engineer: STRUCTWEL DESIGNERS & CONSULTANTS PVT LTD; Engineer: Yogesh HIralal Reshwal; Chartered Accountant: B N DUDANI & CO; Chartered Accountant: Amitha V Shetty. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MAZAGON DOCK SHREE SAMARTH CO-OP HSG SOC LTD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback