Home / Browse projects / Dakshina Kannada, Karnataka / Mayur Residency

Registration approved Residential/Group Housing project

Mayur Residency

By Kunjathkala Sathyaraj Shetty

RG-KA-09048 · RERA PRM/KA/RERA/1257/336/PR/191220/003079 · Last updated on RERA Karnataka portal: 1 Jul 2022

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
May 2022Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 69 documents Report an error

Mayur Residency is a Residential/Group Housing project by Kunjathkala Sathyaraj Shetty in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/336/PR/191220/003079 on 20 Dec 2019. Possession is promised by 18 May 2022. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameMayur Residency
  • TypeResidential/Group Housing
  • Location
    • Bantwala
    • Dakshina Kannada
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1257/336/PR/191220/003079
  • ReraGenie IDRG-KA-09048

Builder

  • NameKunjathkala Sathyaraj Shetty
  • Entity typeOther
  • Authorized SignatoryKunjathkala Sathyaraj Shetty
  • OthersKunjathkala Sathyaraj Shetty

Key dates

this monthRegisteredDec 2019First promiseAug 2021Revised toMay 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on20 Dec 2019
  • Promised completion18 May 2022
  • Revised completionRevised to 18 May 2022 (originally 18 Aug 2021)
  • Buildings1 building record
  • Documents filed69 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Mayur Residency---21021

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 1 Jul 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

As on 1 Jul 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionYes-
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,174 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 1.91 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrakash
EngineerPrakash

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionAug 2021 → May 2022

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed69

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/336/PR/191220/003079 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
1.Reason for Bank Account MismatchFile: Bank Account Mismatch.pdf1 Jul 2022
2.Revised Form BFile: Form B.pdf1 Jul 2022
3.1.Delay ReasonFile: Affidavit of Delay Reason.pdf1 Jul 2022
3.2.1.Architect Certificate-StatusFile: Forms-1 Architect -Status.pdf1 Jul 2022
3.2.2.Architect Certificate-PendingFile: Forms-2 Architect - Pending.pdf1 Jul 2022
4.1.List of AllotteesFile: List of Allottes.pdf1 Jul 2022
4.2.Delay CompansationFile: Affidavit for Componsation.pdf1 Jul 2022
4.3.BHK Wise BreakupFile: BHK WISE.pdf1 Jul 2022
4.4.Structural Safety CertificateFile: Structural Saftey Certificate-1.pdf1 Jul 2022
4.5.Perfoma Sale DeedFile: performa sale deed.pdf1 Jul 2022
4.6.NOCFile: Other NOC.pdf1 Jul 2022
4.7.Advocate Search ReportFile: Advocate Search Report.pdf1 Jul 2022
4.8.STPFile: STP.pdf1 Jul 2022
4.9.Project specificationFile: Project Specification.pdf1 Jul 2022
NOC for Water and Power Supply by Local AuthorityFile: Other NOC.pdf11 Dec 2019
CertificateFile: trade linece-.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Forms-1 Architect -Status.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Form-5 Engineer -Status.pdf-
CA Certificate for Funds UtilizationFile: Form 3 Fund Utilized.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Forms-2 Architect - Pending.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Form-6 Engineer Pending.pdf-
CA Certificate for Funds required for Project CompletionFile: Form 4X Funds Required-.pdf-
AffidavitFile: Affidavit.pdf-
Latest Encumbrance CertificateFile: Encumberance Certificate.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
licence-
Plan-1-
PLAN-
Proforma Sales Deed-
proforma draft of agreement for sale of appatment-
Release Deed and RTC-
Plan-1-
Plan-1-
proforma of allotment letter-
flat brochure new 1 copy-
NOC-
Project Specification-
ec-
notrarized Declaration with Affidavit-compressed-
JD AFFIDAVIT-
Khatha-
Collaboration Agreement-
ESTIMATION-
conversion-compressed-
Estimated proposed construction-
Estimated proposed construction-
Balance Sheet 2017 - 2018File: balance sheet 2019.pdf-
Balance Sheet 2016 - 2017File: balance sheet 2018.pdf-
Balance Sheet 2015 - 2016File: balance sheet 2017.pdf-
Audited Profit and Loss Statement 2017 - 2018File: p&l 2019.pdf-
Audited Profit and Loss Statement 2016 - 2017File: p&l 2018.pdf-
Audited Profit and Loss Statement 2015 - 2016File: p&l 2017.pdf-
Director's Report 2017 - 2018File: Director's Report.pdf-
Director's Report 2016 - 2017File: Director's Report.pdf-
Director's Report 2015 - 2016File: Director's Report.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: ITR V 2019.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITV-2018-19.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: Income Tax Return Acknowledgemen 2017-18.pdf-
notrarized Declaration with Affidavit-compressed-
Prospectus/BrochureFile: flat brochure new.pdf-
Advertisement Copy 1File: Advertisement Copy.jpg-
Tower Excel SheetFile: PRM_KA_RERA_1257_336_PR_191220_003079(3).xlsx-
Loan raised documentFile: Loan Statement.pdf-
Delay ReasonFile: Reason for Delay.pdf-
Occupancy CertificateFile: Completion Certificate.pdf-
Architect certificate for having completed the work(in format no 5)File: Form 5 Architech.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Form -4 CA_compressed.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: rera affidavit.pdf-
Engineer Certificate in Form 6File: Engineer.pdf-

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one moved by 9 months
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep Mayur Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

Builder: Kunjathkala Sathyaraj Shetty

Kunjathkala Sathyaraj Shetty has 1 registration on RERA Karnataka, including Mayur Residency. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if Mayur Residency is delayed beyond 18 May 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Mayur Residency?

The registered promoter entity is Kunjathkala Sathyaraj Shetty. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Mayur Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Mayur Residency?

The professionals named in the filing: Architect: Prakash; Engineer: Prakash. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mayur Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mayur Residency. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mayur Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.