Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
20 of 161Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 99 documents Report an error

MAULI-29 UNICORN PROPERTIES is a Plotted project by UNICORN PROPERTIES in Nagpur, Maharashtra, registered with MahaRERA as P50500078815 on 13 Jan 2025. Possession is promised by 31 Dec 2028. 141 of the 161 units on this registration are recorded sold or booked.

At a glance

Project

  • NameMAULI-29 UNICORN PROPERTIES
  • TypePlotted
  • Location
    • MOUZA-PIPLA
    • Pipla
    • Nagpur (Rural)
    • Nagpur
    • 440034
  • Pincode440034
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500078815
  • ReraGenie IDRG-MH-23503

Builder

  • NameUNICORN PROPERTIES
  • Entity typePartnership

Key dates

this monthRegisteredJan 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Jan 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed99 files

Current status

88%141 of 161 units booked

Figures as on 20 May 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes98%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area25,595 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Sep 2025
LandownerVillageDistrict
LUXORA INFRASTRUCTURE PRIVATE LIMITEDMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityAdministrator Nagar Panchayat Besa Pipla Planning Authority

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch127 RAMDASPETH NAGPUR MAHARASHTRA NAGPUR MAHARASHTRA440010

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPAWAN RAVIPRASAD GUPTA
EngineerM V DESHMUKH
EngineerNAMDEO B LANDE
Chartered AccountantGAD & ASSOCIATES
Chartered AccountantSUMIT SANTOSH AGRAWAL & ASSOCIATES
PartnerRole in project
UNICORN PROPERTIES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed99

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2A MAULI 29 MARCH 2026.pdf20 May 2026
Withdrawal Update Form 1File: FORM 1 MAULI 29 MARCH 2026.pdf19 Apr 2026
Withdrawal Update Form 2File: Form 2 MT 29 DECEMBER 2025.pdf19 Apr 2026
Withdrawal Update Form 3File: FORM 3 MT 29 DECEMBER 2025 (2).pdf19 Apr 2026
Withdrawal Update Form 1File: Form1 M-29 december 2025.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 MT 29 DECEMBER 2025.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3 MT 29 DECEMBER 2025 (2).pdf20 Jan 2026
Withdrawal Update Form 1File: FORM 1 SEP.pdf15 Nov 2025
Withdrawal Update Form 2File: FORM 2 SEP.pdf15 Nov 2025
Withdrawal Update Form 3File: FORM-3 SEPT-25 MAULI-29.pdf15 Nov 2025
Withdrawal Update Form 1File: FORM-1, MT-29_page-0001.pdf13 Nov 2025
Withdrawal Update Form 2File: FORM 2 MAULI 29 SEP 2025 ...pdf13 Nov 2025
Withdrawal Update Form 3File: FORM-3 (MT-29, SEP-25) (1)_compressed.pdf13 Nov 2025
Withdrawal Update Form 1File: FORM-1, MT-29_page-0001.pdf17 Oct 2025
Withdrawal Update Form 2File: FORM 2 MAULI 29 SEP 2025 ...pdf17 Oct 2025
Withdrawal Update Form 3File: FORM-3 (MT-29, SEP-25) (1)_compressed.pdf17 Oct 2025
Withdrawal Update Form 1File: Withdrawal Application Form1_MAULI 29 UNICORN PROPERTIES.pdf29 Sep 2025
Withdrawal Update Form 2File: Withdrawal Application Form2_MAULI 29 UNICORN PROPERTIES.pdf29 Sep 2025
Withdrawal Update Form 3File: Withdrawal Application Form3_MAULI 29 UNICORN PROPERTIES.pdf29 Sep 2025
Form 1File: FORM-1 MAR-25.pdf22 Sep 2025
Form 2File: FORM-2 MAR-25.pdf22 Sep 2025
Form 3File: FORM-3 MAR-25.pdf22 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD MAR-25.pdf22 Sep 2025
Form 5 (FY 2024-2025)File: Form 5 MAR-25 MAULI-29 UNICORN PROPERTIES.pdf22 Sep 2025
Form 2A (FY 2024-2025)File: MAULI 29 UNICORN PROPERTIES.pdf25 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory MT-29.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1, MT-29.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3, MT-29_March-2025.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2, MT-29.pdf21 Apr 2025
Other - FinanceFile: unicorn properties.pdf6 Jan 2025
Other - TechnicalFile: CC Mail to RERA Mauli 29 Unicorn Properties.pdf4 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 mauli 29.pdf2 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf1 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format 'B' mauli 29_c.pdf1 Jan 2025
Building plan approval or NA orderFile: M-29.pdf16 Dec 2024
Layout approvalFile: M-29.pdf16 Dec 2024
Copy of the legal title reportFile: LGR M29.pdf16 Dec 2024
Copy of Layout Approval (in case of layout)File: M-29.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: M-29.pdf16 Dec 2024
Other - LegalFile: LAXORA INFRASTRUCTURE AND UNICORN PROPERTIES (2)_compressed (1)-41-60.pdf16 Dec 2024
Other - LegalFile: LAXORA INFRASTRUCTURE AND UNICORN PROPERTIES (2)_compressed (1)-61-78.pdf16 Dec 2024
Other - LegalFile: LAXORA INFRASTRUCTURE AND UNICORN PROPERTIES (2)_compressed (1)-21-40.pdf16 Dec 2024
Other - LegalFile: LAXORA INFRASTRUCTURE AND UNICORN PROPERTIES (2)_compressed (1)-1-20.pdf16 Dec 2024
Other - LegalFile: 8460-2015-KhNo65-2, 73-2, 85-2, 99-1, 99-2_compressed-114-122.pdf16 Dec 2024
Other - LegalFile: 8460-2015-KhNo65-2, 73-2, 85-2, 99-1, 99-2_compressed-103-113.pdf16 Dec 2024
Other - LegalFile: 8460-2015-KhNo65-2, 73-2, 85-2, 99-1, 99-2_compressed-93-102.pdf16 Dec 2024
Other - LegalFile: 8460-2015-KhNo65-2, 73-2, 85-2, 99-1, 99-2_compressed-81-92.pdf16 Dec 2024
Other - LegalFile: 8460-2015-KhNo65-2, 73-2, 85-2, 99-1, 99-2_compressed-68-80.pdf16 Dec 2024
Other - LegalFile: 8460-2015-KhNo65-2, 73-2, 85-2, 99-1, 99-2_compressed-55-67.pdf16 Dec 2024
Other - LegalFile: 8460-2015-KhNo65-2, 73-2, 85-2, 99-1, 99-2_compressed-43-54.pdf16 Dec 2024
Other - LegalFile: 8460-2015-KhNo65-2, 73-2, 85-2, 99-1, 99-2_compressed-29-42.pdf16 Dec 2024
Other - LegalFile: 8460-2015-KhNo65-2, 73-2, 85-2, 99-1, 99-2_compressed-15-28.pdf16 Dec 2024
Other - LegalFile: 8460-2015-KhN 65-2, 73-2, 85-2, 99-1, 99-2_compressed-1-14.pdf16 Dec 2024
Other - LegalFile: Sale Deed Khasra No 71,75-1,80-3,95-B_compressed-36-47.pdf16 Dec 2024
Other - LegalFile: Sale Deed Khasra No 71,75-1,80-3,95-B_compressed-25-35.pdf16 Dec 2024
Other - LegalFile: Sale Deed Khasra No 71,75-1,80-3,95-B_compressed-13-25.pdf16 Dec 2024
Other - LegalFile: Sale Deed Khasra No 71,75-1,80-3,95-B_compressed-1-12.pdf16 Dec 2024
Other - LegalFile: Sale Deed khasra No 63-3,68,76_compressed-27-39.pdf16 Dec 2024
Other - LegalFile: Sale Deed khasra No 63-3,68,76_compressed-14-26.pdf16 Dec 2024
Other - LegalFile: Sale Deed khasra No 63-3,68,76_compressed.pdf16 Dec 2024
Other - LegalFile: LAXORA INFRASTRUCTURE AND UNICORN PROPERTIES (2)_compressed (1)-79-93.pdf16 Dec 2024
Other - FinanceFile: LAXORA INFRASTRUCTURE AND UNICORN PROPERTIES (2)_compressed (1)-21-40.pdf16 Dec 2024
Other - FinanceFile: POA FROM LUXORA INFRASTRUCTURE TO SANJAY PURANMAL AGRAWAL (2)_compressed-12-22.pdf16 Dec 2024
Other - FinanceFile: POA FROM LUXORA INFRASTRUCTURE TO SANJAY PURANMAL AGRAWAL (2)_compressed-1-11.pdf16 Dec 2024
Other - FinanceFile: LAXORA INFRASTRUCTURE AND UNICORN PROPERTIES (2)_compressed (1)-79-93.pdf16 Dec 2024
Other - FinanceFile: LAXORA INFRASTRUCTURE AND UNICORN PROPERTIES (2)_compressed (1)-61-78.pdf16 Dec 2024
Other - FinanceFile: LAXORA INFRASTRUCTURE AND UNICORN PROPERTIES (2)_compressed (1)-41-60.pdf16 Dec 2024
Other - FinanceFile: LAXORA INFRASTRUCTURE AND UNICORN PROPERTIES (2)_compressed (1)-1-20.pdf16 Dec 2024
Other - TechnicalFile: LAXORA INFRASTRUCTURE AND UNICORN PROPERTIES (2)_compressed (1)-1-20.pdf16 Dec 2024
Other - TechnicalFile: quality annexure.pdf16 Dec 2024
Other - TechnicalFile: coc luxora.pdf16 Dec 2024
Other - TechnicalFile: POA FROM LUXORA INFRASTRUCTURE TO SANJAY PURANMAL AGRAWAL (2)_compressed-12-22.pdf16 Dec 2024
Other - TechnicalFile: POA FROM LUXORA INFRASTRUCTURE TO SANJAY PURANMAL AGRAWAL (2)_compressed-1-11.pdf16 Dec 2024
Other - TechnicalFile: LAXORA INFRASTRUCTURE AND UNICORN PROPERTIES (2)_compressed (1)-79-93.pdf16 Dec 2024
Other - TechnicalFile: LAXORA INFRASTRUCTURE AND UNICORN PROPERTIES (2)_compressed (1)-61-78.pdf16 Dec 2024
Other - TechnicalFile: LAXORA INFRASTRUCTURE AND UNICORN PROPERTIES (2)_compressed (1)-41-60.pdf16 Dec 2024
Other - TechnicalFile: LAXORA INFRASTRUCTURE AND UNICORN PROPERTIES (2)_compressed (1)-21-40.pdf16 Dec 2024
PAN CardFile: PAN Unicorn Properties.pdf14 Dec 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE FINANCE MT-29.pdf14 Dec 2024

How this compares with Nagpur

88%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAULI-29 UNICORN PROPERTIES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOUZA-PIPLA2,800+ in Nagpur

2 kmMAULI-29 UNICORN PROPERTCompleted 24Lapsed / revoked 9Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 57 registered projects within 2 km.

Builder: UNICORN PROPERTIES

UNICORN PROPERTIES has 1 registration on MahaRERA, including MAULI-29 UNICORN PROPERTIES. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if MAULI-29 UNICORN PROPERTIES is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAULI-29 UNICORN PROPERTIES?

The registered promoter entity is UNICORN PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAULI-29 UNICORN PROPERTIES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAULI-29 UNICORN PROPERTIES?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAULI-29 UNICORN PROPERTIES?

The professionals named in the filing: Architect: PAWAN RAVIPRASAD GUPTA; Engineer: M V DESHMUKH; Engineer: NAMDEO B LANDE; Chartered Accountant: GAD & ASSOCIATES; Chartered Accountant: SUMIT SANTOSH AGRAWAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAULI-29 UNICORN PROPERTIES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAULI-29 UNICORN PROPERTIES. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAULI-29 UNICORN PROPERTIES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.