ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / MASS IONICS

Registration lapsed No litigation declared Residential / Group Housing project

MASS IONICS

By MASS BUILDSQUARE STRUCTURE PRIVATE LIMITED

RG-MH-28461 · RERA P51800027417 · Last updated on MahaRERA portal: 3 Sep 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 81%
74 of 86Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 124 documents Report an error

MASS IONICS is a Residential / Group Housing project by MASS BUILDSQUARE STRUCTURE PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800027417 on 10 Dec 2020. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 12 of the 86 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameMASS IONICS
  • TypeResidential / Group Housing
  • Location
    • DHOBI GALLI (S. N. PATIL MARG)
    • ANDHERI (WEST)
    • Andheri
    • Mumbai Suburban
    • 400058
  • Pincode400058
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800027417
  • ReraGenie IDRG-MH-28461

Builder

  • NameMASS BUILDSQUARE STRUCTURE PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsDANISH ATAULLAH ANSARI, NISHAT ATAULLAH ANSARI
  • Managing DirectorMOHD ATAULLAH KHALIL ANSARI

Key dates

4 months past promisethis monthRegisteredDec 2020PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on10 Dec 2020
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed124 files

Current status

14%12 of 86 units booked
71.0%Work done, per cost certificate

Figures as on 3 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MASS IONICSNA191983386

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 81%.

MASS IONICS: 66% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure81%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 3 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes65%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes65%
Storm Water DrainsYes65%
Landscaping & Tree PlantingYes65%
Street LightingYes65%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes65%
Solid Waste Management And DisposalYes65%
Water conservation /Rain water harvestingYes65%
Energy managemcntYes65%
Fire protection and fire safety requirementsYes65%
Electrical meter room, sub-station, receiving stationYes65%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Closed/Covered1
Open Space3

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area903 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 Jul 2025

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI2557.95
Proposed, not sanctioned2,558 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOM NIKETAN CHS LTD, 314 PATIL RAM ROAD, ANDHERI WEST, MUMBAI-400058
Estimated costRs 13.22 cr
Cost incurredRs 9.38 cr
Work done71.0%
BuildingWingEstimatedIncurred
MASS IONICSNARs 9.25 crRs 7.40 cr
-NARs 3.96 crRs 1.98 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectZEESHAN A ANSARI
EngineerMOHSIN SHAIKH
Chartered AccountantMNJ AND ASSOCIATES
Chartered AccountantAnita Choudhari
Chartered AccountantMohandas Shetty
Chartered AccountantAnand Yadav
PartnerRole in project
MASS BUILDSQUARE STRUCTURE PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Aug 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Aug 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Aug 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed124

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 124 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Architect Certificate 31122020 Dimple.pdf3 Sep 2025
Form 2File: Engineer Certificate 31122020 Dimple-compresed.pdf3 Sep 2025
Form 3File: Mass Ionics Form 3-311220-compresed.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: Mass Ionics- Sold Inventory Disclosure-old period Q3 20-21.pdf3 Sep 2025
Form 1File: Architect Certificate 30062021 Dimple.pdf3 Sep 2025
Form 2File: Engineer Certificate 30062021 Dimple-compresed.pdf3 Sep 2025
Form 3File: Mass ionics form 3-300621-compresed.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: Mass Ionics- Sold Inventory Disclosure-old period Q1 21-22.pdf3 Sep 2025
Form 1File: Architect Certificate 30092021 Dimple.pdf3 Sep 2025
Form 2File: Engineer Certificate 30092021 Dimple-compresed.pdf3 Sep 2025
Form 3File: mass ionics form3-300921-compresed.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: Mass Ionics- Sold Inventory Disclosure-old period Q2 21-22.pdf3 Sep 2025
Form 1File: Form 1 MASS IONICS ARCHITECT CERT300922.pdf3 Sep 2025
Form 2File: Engineer Certificate 30092022 Dimple.pdf3 Sep 2025
Form 3File: Form 3 Mass Ionics-300922-compresed.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: Mass Ionics- Sold Inventory Disclosure 9-22.pdf3 Sep 2025
Withdrawal Update Form 1File: MASS IONICS ARCHITECT CERTIFICATE FOR RERA 31032022.pdf3 Sep 2025
Withdrawal Update Form 2File: 3TH RERA ENG CERTIFICATE MBS 310322.pdf3 Sep 2025
Withdrawal Update Form 3File: Mass Ionics Form 3 Sign 1.pdf3 Sep 2025
Form 2A (FY 2020-2021)File: Mass Ionics_Form 2A_31-03-21.pdf2 Sep 2025
Form 2A (FY 2021-2022)File: Mass Ionics_Form 2A_FY 21-22.pdf2 Sep 2025
Form 2A (FY 2022-2023)File: Mass Ionics_Form 2A_FY 22-23.pdf2 Sep 2025
Form 2A (FY 2023-2024)File: Mass Ionics_Form 2A_FY 23-24.pdf2 Sep 2025
Form 2A (FY 2024-2025)File: Mass Ionics_Form 2A_FY 24-25.pdf2 Sep 2025
Form 1File: Form 1 MASS IONICS ARCHITECT CERTIFICATE FOR RERA 31032021.pdf29 Aug 2025
Form 2File: Form 2 RERA ENG CERTIFICATE MBS 310321.pdf29 Aug 2025
Form 3File: Form 3 Mass Ionics-310321 Signed.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Mass Ionics- Sold Inventory Disclosure 3-21.pdf29 Aug 2025
Form 1File: Form 1 MASS IONICS ARCHITECT CERT 31122021.pdf29 Aug 2025
Form 2File: Form-2 RERA ENG CERTIFICATE MBS 311221.pdf29 Aug 2025
Form 3File: Form 3 mass ionics-311221 Signed.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Mass Ionics- Sold Inventory Disclosure 12-21.pdf29 Aug 2025
Form 1File: Form 1 MASS IONICS ARCHITECT CERT-31032022.pdf29 Aug 2025
Form 2File: Form 2 RERA ENG CERTIFICATE MBS 310322.pdf29 Aug 2025
Form 3File: Form 3 Mass ionics-310322 Signed.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Mass Ionics- Sold Inventory Disclosure 3-22.pdf29 Aug 2025
Form 1File: Form 1 MASS IONICS ARCHITECT CERT 300622.pdf29 Aug 2025
Form 2File: Form 2 RERA ENG CERTIFICATE MBS 300622.pdf29 Aug 2025
Form 3File: Form 3 Mass Ionics-300622-condensed.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Mass Ionics- Sold Inventory Disclosure 6-22.pdf29 Aug 2025
Form 1File: Form 1 MASS IONICS ARCHITECT CERTI 311222.pdf29 Aug 2025
Form 2File: Form 2 RERA ENG CERTIFICATE MBS 311222.pdf29 Aug 2025
Form 3File: Form 3 Mass Ionics-311222-condensed.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Mass Ionics- Sold Inventory Disclosure 12-22.pdf29 Aug 2025
Form 1File: Form 1 Architect Certificate 310323.pdf29 Aug 2025
Form 2File: Form 2 RERA ENG CERTIFICATE MBS 310323.pdf29 Aug 2025
Form 3File: Form 3 Mass Ionics-310323-condensed.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Mass Ionics- Sold Inventory Disclosure 3-23.pdf29 Aug 2025
Form 1File: Form 1 Architect Certificate 30062023.pdf29 Aug 2025
Form 2File: Form 2 Engineer Certificate 30062023-condensed.pdf29 Aug 2025
Form 3File: Form 3 Mass Ionics 300623-condensed.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Mass Ionics- Sold Inventory Disclosure 6-23.pdf29 Aug 2025
Form 1File: Form 1 Architect Certificate 300923.pdf29 Aug 2025
Form 2File: Form 2 Engineer Certificate 300923-condensed.pdf29 Aug 2025
Form 3File: Form 3 Mass Ionics-300923-condensed.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Mass Ionics- Sold Inventory Disclosure 9-23.pdf29 Aug 2025
Form 1File: Form 1 Architect Certificate 311223.pdf29 Aug 2025
Form 2File: Form 2 Engineer Certificate 311223.pdf29 Aug 2025
Form 3File: Form 3 Mass Ionics-311223-condensed.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Mass Ionics- Sold Inventory Disclosure 12-23.pdf29 Aug 2025
Form 1File: Form 1 Architect Certificate 310324.pdf29 Aug 2025
Form 2File: Form 2 Engineer Certificate 310324-condensed.pdf29 Aug 2025
Form 3File: Form 3 Mass Ionics Form 3-310324-condensed.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Mass Ionics- Sold Inventory Disclosure 3-24.pdf29 Aug 2025
Form 1File: Form 1 Architect Certificate 300624.pdf29 Aug 2025
Form 2File: Form 2 Engineer Certificate 300624.pdf29 Aug 2025
Form 3File: Form 3 Mass Ionics-300624-condensed.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Mass Ionics- Sold Inventory Disclosure 6-24.pdf29 Aug 2025
Form 1File: Form 1 Architect Certificate 300924.pdf29 Aug 2025
Form 2File: Form 2 Engineer Certificate 300924.pdf29 Aug 2025
Form 3File: Form 3 Mass Ionics 300924-condensed.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Mass Ionics- Sold Inventory Disclosure 9-24.pdf29 Aug 2025
Form 1File: Form 1 Architect Certificate 311224.pdf29 Aug 2025
Form 2File: Form 2 Engineer Certificate 311224-condensed.pdf29 Aug 2025
Form 3File: Form 3 Mass Ionics-311224-condensed.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Mass Ionics- Sold Inventory Disclosure 12-24.pdf29 Aug 2025
Form 1File: Form 1 Architect Certificate 310325.pdf29 Aug 2025
Form 2File: Form 2 Engineer Certificate 310325-condensed.pdf29 Aug 2025
Form 3File: Form 3 Mass Ionics-310325-condensed.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Mass Ionics- Sold Inventory Disclosure 3-25.pdf29 Aug 2025

How this compares with Mumbai Suburban

14%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MASS IONICS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ANDHERI (WEST)6,700+ in Mumbai Suburban

2 kmMASS IONICSCompleted 120Lapsed / revoked 84Abeyance 1Other 149Dot size: filed unitsN

Filed coordinates, straight-line distance. 354 registered projects within 2 km.

Builder: MASS BUILDSQUARE STRUCTURE PRIVATE LIMITED

MASS BUILDSQUARE STRUCTURE PRIVATE LIMITED has 1 registration on MahaRERA, including MASS IONICS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that MASS IONICS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if MASS IONICS is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MASS IONICS?

The registered promoter entity is MASS BUILDSQUARE STRUCTURE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MASS IONICS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MASS IONICS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MASS IONICS?

The professionals named in the filing: Architect: ZEESHAN A ANSARI; Engineer: MOHSIN SHAIKH; Chartered Accountant: MNJ AND ASSOCIATES; Chartered Accountant: Anita Choudhari; Chartered Accountant: Mohandas Shetty; Chartered Accountant: Anand Yadav. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MASS IONICS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MASS IONICS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MASS IONICS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.