Red flags
- 10 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MARATHON NEXZONE ZENITH -1 is a Residential / Group Housing project by SANVO RESORTS PVT. LTD. in Raigarh, Maharashtra, registered with MahaRERA as P52000000658 on 19 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2018. 10 complaints are on record with the regulator.
At a glance
Project
- NameMARATHON NEXZONE ZENITH -1
- TypeResidential / Group Housing
- Location
- JN PT ROAD
- PALASPE PHATA
- Kolkhe
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000000658
- ReraGenie IDRG-MH-09623
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on19 Jul 2017
- Promised completion31 Dec 2018
- Revised completionNone
- Buildings1 building record
- Documents filed104 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MARATHON NEXZONE ZENITH -1 | NA | 28 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
MARATHON NEXZONE ZENITH -1: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 24 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed177
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| SANVO RESORTS PVT. LTD. | - |
Complaints filed with MahaRERA10
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000100497 | Mrs. Roopa N. Hegde and Mr. Narahari V. Hegde | Sanvo Resort Pvt.Ltd. | 22/08/2019 |
| CC006000000044427 | GANGADHAR AGARWAL | SANVO RESORTS PVT LTD | 07/05/2018 |
| CC006000000054953 | VIKAS ARORA | SANVO RESORTS PVT. LTD. | 15/06/2018 |
| CC006000000055195 | Sanjiv Randhirsingh Rawal | Sanvo Resorts Private Limited | 13/07/2018 |
| CC006000000089780 | ANIL DUREJA | M/s Sanvo Resorts Pvt Ltd | 20/06/2019 |
| CC006000000141066 | SANVO RESORTS PVT LTD | Indo vacuum Technologies Pvt. LTd | 28/09/2019 |
| CC006000000141082 | SANVO RESORTS PVT LTD | DCFC LOGISTICS PVT. LTD. | 28/09/2019 |
| CC006000000192340 | Sanvo Resorts Private Limited | Mrs. Vrushali Vijay Panchal and Anr. | 29/01/2020 |
| CC006000000480319 | Sanvo Resorts Pvt. Ltd | Vrushali Vijay Panchal | 02/05/2024 |
| CC12501141 | Vinod Parasharam Atpadkar | SANVO RESORTS PVT. LTD. | 05/04/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Jan 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Mar 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 24 Dec 2024
Documents filed104
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4_AC_Form-1_Zenith-1_2025.pdf | 24 Apr 2025 |
| Certificates of CA (Form 3)File: Rera Certificate Zenith 1 March 25.pdf | 24 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: signedFORM 2_Engg Certificate Zenith 1-Mar 2025.pdf | 24 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Zenith 1 Rera Certificate June 21.pdf | 24 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Zenith 1 Rera Certificate Sep 21.pdf | 24 Mar 2025 |
| Certificates of CA (Form 3)File: From 3 Rera Certificate Zenith 1 December 21.pdf | 24 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Rera Certificate Zenith 1 March 22.pdf | 24 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Rera Certificate Zenith 1 June 22.pdf | 24 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Rera Certificate Zenith 1 Sep 22.pdf | 24 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Rera Certificate Zenith 1 December 22.pdf | 24 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Rera Certificate Zenith 1 March 23.pdf | 24 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Zenith 1 Rera Certificate March 21.pdf | 24 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Zenith 1 Dec 2018.pdf | 24 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Zenith 1 Mar 2020.pdf | 24 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Zenith 1 Dec 2019.pdf | 24 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Zenith 1 Sep 2019.pdf | 24 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Zenith 1 Jun 2019.pdf | 24 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Zenith 1 Mar 2019.pdf | 24 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Zenith 1 Sep 2018.pdf | 24 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Zenith 1 Jun 2018.pdf | 24 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Zenith 1 Mar 2018.pdf | 24 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Zenith 1 Dec 2017.pdf | 24 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Zenith 1 Sep 2017.pdf | 24 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Zenith 1 Jun 2017.pdf | 24 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Zenith 1 Jun 2020.pdf | 24 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Zenith 1 Sep 2020.pdf | 24 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Zenith 1 Dec 2020.pdf | 24 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Zenith 1 Mar 2021.pdf | 24 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Zenith 1 Jun 2021.pdf | 24 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Zenith 1 Sep 2021.pdf | 24 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Zenith 1 Dec 2021.pdf | 24 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Zenith 1 Mar 2022.pdf | 24 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Zenith 1 Mar 2023.pdf | 24 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 CA Cert Zenith 1 Mar 2024.pdf | 25 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 CA Cert ZENITH 1 Mar 2020.pdf | 18 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 CA Cert ZENITH 1 Jun 2023.pdf | 18 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 CA Cert ZENITH 1 Dec 2020.pdf | 18 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 CA Cert ZENITH 1 Sep 2020.pdf | 18 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 CA Cert ZENITH 1 Jun 2020.pdf | 18 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 CA Cert ZENITH 1 Dec 2019.pdf | 18 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 CA Cert ZENITH 1 Sep 2019.pdf | 18 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 CA Cert ZENITH 1 Jun 2019.pdf | 18 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 ZENITH - 1 RERA CERTIFICATE Mar 2019.pdf | 18 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 ZENITH-1 RERA CERTIFICATE Dec 2018.pdf | 18 Feb 2025 |
| Certificates of CA (Form 3)File: From 3 ZENITH-2 RERA CERTIFICATE Dec 2018.pdf | 18 Feb 2025 |
| Certificates of CA (Form 3)File: MARATHON NEXZONE ZENITH - I RERA CERTIFICATE SEP 2018.pdf | 18 Feb 2025 |
| Certificates of CA (Form 3)File: Zenith 1 Form 03 Rera Certificate Dec 2024.pdf | 24 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_Engg Certificate Zenith 1-Dec 2024.pdf | 24 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3_AC_Form-1_Zenith-1_2024.pdf | 13 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Zenith 1 Form 5 March 24.pdf | 30 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ZENITH-1.pdf | 24 Dec 2024 |
| Certificates of CA (Form 3)File: Rera Certificate form 03 Zenith-1 Sep 2024.pdf | 22 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: signedFORM 2_Engg Certificate Zenith 1-Sep 2024.pdf | 22 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q2_AC_Form-1_Zenith-1_2024.pdf | 11 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: signedQ1_AC_Form-1_Zenith-1_2024.pdf | 19 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: signedFORM 2_Engg Certificate Zenith 1-June 2024.pdf | 19 Jul 2024 |
| Certificates of CA (Form 3)File: signedFORM 2_Engg Certificate Zenith 1-June 2024.pdf | 19 Jul 2024 |
| Certificates of CA (Form 3)File: Form 03 Zenith-1 Rera Certificate June 2024.pdf | 19 Jul 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: 20240710002833.pdf | 10 Jul 2024 |
| OtherFile: 20240710002833.pdf | 10 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 2A Zenith-1.pdf | 28 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SIGNEDForm 2A - QAC-NEXZN ZENITH 1-FY23-24.pdf | 27 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4_AC_Form-1_Zenith-1_2024.pdf | 18 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: signedFORM 2_Engg Certificate Zenith 1-Mar 2024.pdf | 18 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_Engg Certificate Zenith 1-Dec-2023.pdf | 30 Jan 2024 |
| Certificates of CA (Form 3)File: Form 03 Zenith-1 Rera Certificate Dec 2023.pdf | 20 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 Marathon Nexzone Zenith 1 Sep 23.pdf | 27 Oct 2023 |
| Status of ConveyanceFile: Reply RERA Conveyance notice-Zenith-Zodiac 1AND 2.pdf | 13 Feb 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: ZANTH.pdf | 13 Jul 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: ZANTH.pdf | 13 Jul 2022 |
| Proforma of Allotment letterFile: AFS_Phase 1_30621.pdf | 7 Mar 2022 |
| Details of encumbrancesFile: NO ENCUMBRANCE CERTIFICA 22 ND MAY 2021 of Sanvo 1.pdf | 2 Jun 2021 |
| Architect’s Certificate on Completion of Project (Form 4)File: NEXZON ZENITH-1 FROM 4.pdf | 16 Mar 2021 |
| Annual Audit Report of Statutory CA (Form 5)File: SRPL Form 05 Zennith 1 _ M19.pdf | 28 Sep 2019 |
| OtherFile: zen-30-04-17.pdf | 18 Apr 2019 |
| OtherFile: zen-24-09-16.pdf | 18 Apr 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: zenith1.pdf | 9 Jan 2019 |
| Certificates of CA (Form 3)File: Nexzone_Zenith 1 (2).pdf | 30 Jul 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: zenith1.pdf | 27 Jul 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: zenith1.pdf | 30 Apr 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 36 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 104 filed documents as one ZIP, foldered, with a manifest
Keep MARATHON NEXZONE ZENITH -1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PALASPE PHATA5,900+ in Raigarh
Filed coordinates, straight-line distance. 62 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: SANVO RESORTS PVT. LTD.
SANVO RESORTS PVT. LTD. has 37 registrations on MahaRERA, including MARATHON NEXZONE ZODIAC -1 and MARATHON NEXZONE ZODIAC -2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if MARATHON NEXZONE ZENITH -1 is delayed beyond 31 Dec 2018?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MARATHON NEXZONE ZENITH -1?
The registered promoter entity is SANVO RESORTS PVT. LTD., a company as per the filing. Its CIN U55103MH2001PTC132675 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MARATHON NEXZONE ZENITH -1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MARATHON NEXZONE ZENITH -1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MARATHON NEXZONE ZENITH -1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in MARATHON NEXZONE ZENITH -1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback