Home / Browse projects / Raigarh, Maharashtra / MARATHON NEXZONE BODHI - 2
MARATHON NEXZONE BODHI - 2
RG-MH-15784 · RERA P52000029857 · Last updated on MahaRERA portal: 28 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 245.00 crore secured on the land, in favour of Piramal Capital and Housing Finance Ltd
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MARATHON NEXZONE BODHI - 2 is a Residential / Group Housing project by SANVO RESORTS PVT. LTD. in Raigarh, Maharashtra, registered with MahaRERA as P52000029857 on 8 Jul 2021. Possession is promised by 31 Dec 2026. 67 of the 73 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.
At a glance
Project
- NameMARATHON NEXZONE BODHI - 2
- TypeResidential / Group Housing
- Location
- J N PT ROAD
- PALASPE PHATA
- Kolkhe
- Panvel
- Raigarh
- 410206
- Pincode410206
- RERA no.P52000029857
- ReraGenie IDRG-MH-15784
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on8 Jul 2021
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed166 files
Current status
Figures as on 28 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MARATHON NEXZONE BODHI -2 | NA | 13 | 7 | 73 | 0 | 73 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 89%.
MARATHON NEXZONE BODHI -2: 41% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 89% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 87% |
Progress on shared amenities15
As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 20% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 98% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 95% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed48
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| MARATHON NEXZONE BODHI -2 | NA | Rs 18.32 cr | Rs 12.65 cr |
| - | NA | Rs 4.83 cr | Rs 4.25 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANTOSH KUMAR PREMCHANDRA DUBEY |
| Engineer | URVESH VIRENDRA MEHTA |
| Engineer | GURRUNATH DHAVAN |
| Chartered Accountant | Dinesh Ganpat Pai |
| Chartered Accountant | Akshay Shah |
| Chartered Accountant | Apurva Shah |
| Partner | Role in project |
|---|---|
| SANVO RESORTS PVT. LTD. | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Jun 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Nov 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 May 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 May 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed166
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 166 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Q4_AC_Form-1_Bodhi-2_2026.pdf | 28 Apr 2026 |
| Withdrawal Update Form 2File: signedForm 2 Engg Cert Bodhi 2 Mar 2026.pdf | 28 Apr 2026 |
| Withdrawal Update Form 3File: RERA Certificate for March-2026- Marathon Nexzone Bodhi-2.pdf | 28 Apr 2026 |
| Withdrawal Update Form 1File: Q3_AC_Form-1_Bodhi-2_2025.pdf | 27 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2_Engg Certificate Ph II Bodhi-2 Dec 2025.pdf | 27 Jan 2026 |
| Withdrawal Update Form 3File: Bodhi 2 Form 03 Rera Certificate Dec 2025.pdf | 27 Jan 2026 |
| Form 2A (FY 2025-2026)File: Form 2A Bodhi 2 Mar 2026.pdf | 15 Dec 2025 |
| Withdrawal Update Form 1File: Q2_AC_Form-1_Bodhi-2_2025.pdf | 28 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2_Engg Certificate Ph II Bodhi-2 Sep 2025.pdf | 28 Oct 2025 |
| Withdrawal Update Form 3File: From 3 CA Cert Bodhi 2 Sep 2025.pdf | 28 Oct 2025 |
| Withdrawal Update Form 1File: Q1_AC_Form-1_Bodhi-2_2025.pdf | 8 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2_Engg Certificate Ph II Bodhi-2 Jun 2025.pdf | 8 Oct 2025 |
| Withdrawal Update Form 3File: Rera Certificate Bodhi 2 June 25.pdf | 8 Oct 2025 |
| Form 1File: Form 1 Arc Cert Bodhi 2 Dec 2021.pdf | 22 Sep 2025 |
| Form 2File: FORM 2_Engg Certificate Ph II Bodhi-2-Dec 21.pdf | 22 Sep 2025 |
| Form 3File: Nexzone Bodhi 2 _ Rera Certi_As On Dec 21.pdf | 22 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: DSUI Bodhi 2 Dec 21.pdf | 22 Sep 2025 |
| Form 1File: Form 1 Arc Cert Bodhi 2 Mar 2022.pdf | 22 Sep 2025 |
| Form 2File: Bodhi 2 Mar-22.pdf | 22 Sep 2025 |
| Form 3File: Nexzone Bodhi-2 Rera Certi As On Mar 22.pdf | 22 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: DSUI Bodhi-2 Mar 22.pdf | 22 Sep 2025 |
| Form 1File: Q2_AC_Form-1_Bodhi-2_2021.pdf | 2 Sep 2025 |
| Form 2File: Form 2 Engg Cert Bodhi 2 Sep 21.pdf | 2 Sep 2025 |
| Form 3File: Nexzone Bodhi 2 _ Rera Certi_As On Sep 21.pdf | 2 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: DSUI Bodhi 2 Sep 21.pdf | 2 Sep 2025 |
| Form 2A (FY 2021-2022)File: Form 2A Bodhi 2 Mar 2022.pdf | 12 Aug 2025 |
| Form 2A (FY 2022-2023)File: Form 2A Bodhi-2.pdf | 12 Aug 2025 |
| Form 2A (FY 2023-2024)File: FORM-2A BODHI 2_ MAR-2024.pdf | 12 Aug 2025 |
| Form 5 (FY 2021-2022)File: Bodhi 2 Form 5 2021-22.pdf | 12 Aug 2025 |
| Form 1File: Q1_AC_Form-1_Bodhi-2_2022.pdf | 11 Aug 2025 |
| Form 2File: Bodhi-2_jn-22.pdf | 11 Aug 2025 |
| Form 3File: Form 3 BODHI 2 Jun 2022.pdf | 11 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DSUI Bodhi 2 Jun 2022.pdf | 11 Aug 2025 |
| Form 1File: Q2_AC_Form-1_Bodhi-2_2022.pdf | 11 Aug 2025 |
| Form 2File: Form 2 Engg Cert Bodhi 2 Cert Sep 22.pdf | 11 Aug 2025 |
| Form 3File: Bodhi-2Form 03 Rera Certificate Sep22.pdf | 11 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DSUI Bodhi-2 Sep22.pdf | 11 Aug 2025 |
| Form 1File: Q3_AC_Form-1_Bodhi-2_2022.pdf | 11 Aug 2025 |
| Form 2File: Bodhi 2 RERA Eng Cert Dec 2022.pdf | 11 Aug 2025 |
| Form 3File: Marathon Nexzone Bodhi 2 Dec 2022.pdf | 11 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DSUI Bodhi 2 Dec 2022.pdf | 11 Aug 2025 |
| Form 1File: Q4_AC_Form-1_Bodhi-2_2023.pdf | 11 Aug 2025 |
| Form 2File: Bodhi-2 Eng Certificate.pdf | 11 Aug 2025 |
| Form 3File: Bodhi 2 Rera Certificate March 23.pdf | 11 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DSUI Bodhi 2 March 23.pdf | 11 Aug 2025 |
| Form 1File: Q1_AC_Form-1_Bodhi-2_2024.pdf | 11 Aug 2025 |
| Form 2File: signedFORM 2_Engg Certificate Ph II Bodhi-2 June 2024.pdf | 11 Aug 2025 |
| Form 3File: Form 03 Bodhi 2 Rera Certificate June 2024.pdf | 11 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DSUI Bodhi 2 June 2024 (2).pdf | 11 Aug 2025 |
| Form 1File: Q2_AC_Form-1_Bodhi-2_2023.pdf | 11 Aug 2025 |
| Form 2File: FORM 2_Engg Certificate Ph II Bodhi-2-Sep 2023.pdf | 11 Aug 2025 |
| Form 3File: Form 3 Marathon Nexzone Bodhi 2 Sep 23.pdf | 11 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DSUI Bodhi 2 Sep 23.pdf | 11 Aug 2025 |
| Form 1File: Q3_AC_Form-1_Bodhi-2_2023.pdf | 11 Aug 2025 |
| Form 2File: FORM 2_Engg Certificate Ph II Bodhi-2-Dec 2023.pdf | 11 Aug 2025 |
| Form 3File: Form 03 Bodhi-2 Rera Certificate Dec 2023.pdf | 11 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DSUI Bodhi-2 Dec 2023.pdf | 11 Aug 2025 |
| Form 1File: Q4_AC_Form-1_Bodhi-2_2024.pdf | 11 Aug 2025 |
| Form 2File: signedFORM 2_Engg Certificate Ph II Bodhi-2 Mar-2024.pdf | 11 Aug 2025 |
| Form 3File: Form 03 Bodhi-2 Rera Certificate March 2024.pdf | 11 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DSUI Bodhi-2 March 2024.pdf | 11 Aug 2025 |
| Withdrawal Update Form 1File: Q1_AC_Form-1_Bodhi-2_2025.pdf | 7 Aug 2025 |
| Withdrawal Update Form 2File: FORM 2_Engg Certificate Ph II Bodhi-2 Jun 2025.pdf | 7 Aug 2025 |
| Withdrawal Update Form 3File: Rera Certificate Bodhi 2 June 25.pdf | 7 Aug 2025 |
| Form 1File: Q3_AC_Form-1_Bodhi-2_2024.pdf | 16 Jul 2025 |
| Form 2File: FORM 2_Engg Certificate Ph II Bodhi-2 Dec 2024.pdf | 16 Jul 2025 |
| Form 3File: Bodhi 2 Form 03 Rera Certificate Dec 2024.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DSUI Bodhi 2 Dec 2024.pdf | 16 Jul 2025 |
| Form 1File: Q2_AC_Form-1_Bodhi-2_2024.pdf | 16 Jul 2025 |
| Form 2File: signedFORM 2_Engg Certificate Ph II Bodhi-2 Sep 2024.pdf | 16 Jul 2025 |
| Form 3File: Rera Certificate form 03 Bodhi-2 Sep 2024.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DSUI Bodhi-2 Sep 2024.pdf | 16 Jul 2025 |
| Form 1File: Q1_AC_Form-1_Bodhi-2_2024.pdf | 16 Jul 2025 |
| Form 2File: signedFORM 2_Engg Certificate Ph II Bodhi-2 June 2024.pdf | 16 Jul 2025 |
| Form 3File: Form 03 Bodhi 2 Rera Certificate June 2024.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DSUI Bodhi 2 June 2024.pdf | 16 Jul 2025 |
| Withdrawal Update Form 1File: Q4_AC_Form-1_Bodhi-2_2025.pdf | 27 Jun 2025 |
| Withdrawal Update Form 2File: signedFORM 2_Engg Certificate Ph II Bodhi-2 Mar 2025.pdf | 27 Jun 2025 |
| Withdrawal Update Form 3File: Rera Certificate Bodhi 2 March 25.pdf | 27 Jun 2025 |
| Withdrawal Update Form 1File: Q4_AC_Form-1_Bodhi-2_2025.pdf | 26 Jun 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 36 other registrations, which the RERA portal never shows together
- All 166 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MARATHON NEXZONE BODHI - 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PALASPE PHATA5,900+ in Raigarh
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: SANVO RESORTS PVT. LTD.
SANVO RESORTS PVT. LTD. has 37 registrations on MahaRERA, including MARATHON NEXZONE ZODIAC -1 and MARATHON NEXZONE ZODIAC -2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if MARATHON NEXZONE BODHI - 2 is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MARATHON NEXZONE BODHI - 2?
The registered promoter entity is SANVO RESORTS PVT. LTD., a company as per the filing. Its CIN U55103MH2001PTC132675 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MARATHON NEXZONE BODHI - 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MARATHON NEXZONE BODHI - 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MARATHON NEXZONE BODHI - 2?
The professionals named in the filing: Architect: SANTOSH KUMAR PREMCHANDRA DUBEY; Engineer: URVESH VIRENDRA MEHTA; Engineer: GURRUNATH DHAVAN; Chartered Accountant: Dinesh Ganpat Pai; Chartered Accountant: Akshay Shah; Chartered Accountant: Apurva Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MARATHON NEXZONE BODHI - 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback