MARATHON NEXZONE ALTIS -1

By SANVO RESORTS PVT. LTD.

RG-MH-09627 · RERA P52000000573 · Last updated on MahaRERA portal: 23 Apr 2025

Source: official MahaRERA filing

Red flags

  • 16 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2019Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
16Complaints at MahaRERAon this registration
Jump to the 127 documents Report an error

MARATHON NEXZONE ALTIS -1 is a Residential / Group Housing project by SANVO RESORTS PVT. LTD. in Raigarh, Maharashtra, registered with MahaRERA as P52000000573 on 18 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2019. 16 complaints are on record with the regulator.

At a glance

Project

  • NameMARATHON NEXZONE ALTIS -1
  • TypeResidential / Group Housing
  • Location
    • JN PT ROAD
    • PALASPE PHATA
    • Kolkhe
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000000573
  • ReraGenie IDRG-MH-09627

Builder

  • NameSANVO RESORTS PVT. LTD.
  • Entity typeCompany
  • CINU55103MH2001PTC132675
  • DirectorsSAMYAG MAYUR SHAH, URVESH VIRENDRA MEHTA
  • Other registrations36 more →
  • Completed18 of 37
  • No longer live8 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2017PromisedDec 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Jul 2017
  • Promised completion31 Dec 2019
  • Revised completionNone
  • Buildings1 building record
  • Documents filed127 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MARATHON NEXZONE ALTIS -1NA280000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

MARATHON NEXZONE ALTIS -1: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 23 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed163

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots163
Closed/Covered163

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area633 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI11621.09
Proposed, not sanctioned11,498 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch5 6 7 JALARAM ASHISH CO OP HSG SOCIETY MULUND WEST DEVIDAYAL ROAD MUMBAI 400080

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
SANVO RESORTS PVT. LTD.-

Complaints filed with MahaRERA16

Case no.ComplainantRespondentFiled
CC006000000055003SHYAMSUNDER J. HEMRAJANISANVO RESORTS PRIVATE LIMITED20/06/2018
CC006000000056607Arya Pratim ChattarajSanvo Resorts Pvt Ltd22/10/2018
CC006000000078195Rajeshwar Bhaskar SmartaSanvo Resorts Private Limited14/03/2019
CC006000000078459Sonali Vasudeo TipreSanvo Resorts Private Limited14/03/2019
CC006000000171511Sanvo Resorts Pvt LtdVivek Kumar Jha & Anr.12/11/2019
CC006000000171513Sanvo Resorts Pvt LtdKanwaljit Singh Bombra12/11/2019
CC006000000192260Sanvo Resorts Pvt LtdAnanda Rajaram Jadhav21/01/2020
CC006000000192341Sanvo Resorts Private LimitedMrs. Indu Binod Singh & Anr.29/01/2020
CC006000000192348Sanvo Resorts Pvt LtdPallavi Sunil Ajmera29/01/2020
CC006000000194426Sanvo Resorts Pvt LtdRajesh B Patil22/02/2021
CC006000000192284OMBIR YADAVMAYUR SHAH28/01/2020
CC006000000194992Pallavi AjmeraSanvo Resorts Pvt. Ltd.22/11/2020
CC006000000195194Jai PrakashSanvo Resorts Pvt. Ltd09/12/2020
CC006000000303560Varsha Girish KoreSANVO RESORTS PVT. LTD.03/12/2022
CC006000000479814Mahesh Narayan ShejwalSANVO RESORTS PVT. LTD.28/03/2024
CC006000000479949Mrs. Deepika Cardozo & Mr. Brijesh ButalaSanvo Resorts Private Limited05/04/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jan 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Aug 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Mar 2023

Documents filed127

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 127 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4_AC_Form-1_Altis-1_2025.pdf23 Apr 2025
Certificates of CA (Form 3)File: Rera Certificate altis 1 March 25.pdf23 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: signedFORM 2_Engg Certificate Altis-1 Mar 2025.pdf23 Apr 2025
Certificates of CA (Form 3)File: Form Rera Certificate Altis 1 Sep 21.pdf26 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate Altis 1 Sep 2017.pdf26 Mar 2025
Certificates of CA (Form 3)File: Form 3 CA Cert Altis 1 Jun 23.pdf26 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate Altis 1 March 23.pdf26 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate Altis 1 Sep 22.pdf26 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate Altis 1 Dec 22.pdf26 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate Altis 1 June 22.pdf26 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate Altis 1 March 22.pdf26 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate Altis 1 Dec 21.pdf26 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate Altis 1 June 21.pdf26 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate Altis 1 March 21.pdf26 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate ALTIS 1 Dec 2020.pdf26 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate ALTIS 1 Sep 2020.pdf26 Mar 2025
Certificates of CA (Form 3)File: Form 3 Ca Cert ALTIS 1 Sep 2019.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate ALTIS 1 Jun 2020.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate altis 1 Mar 2020.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 Ca Cert ALTIS 1 Dec 2019.pdf25 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Altis 1 Sep 2017.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Altis 1 Dec 2019.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Altis 1 Sep 2019.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Altis 1 Jun 2019.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Altis 1 Mar 2019.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Altis 1 Dec 2018.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Altis 1 Sep 2018.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Altis 1 Jun 2018.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Altis 1 Mar 2018.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Altis 1 Dec 2017.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Altis 1 Jun 2017.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Altis 1 Jun 2020.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Altis 1 Sep 2020.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Altis 1 Dec 2020.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Altis 1 Mar 2021.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Altis 1 Jun 2021.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Altis 1 Sep 2021.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Altis 1 Dec 2021.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Altis 1 2022.pdf6 Mar 2025
Certificates of CA (Form 3)File: Altis 1 Form 03 Rera Certificate Dec 2024.pdf24 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_Engg Certificate Altis-1 Dec 2024.pdf24 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3_AC_Form-1_Altis-1_2024.pdf13 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Altis-1 Dec 17.pdf23 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Altis 1 Form 5 March 24.pdf21 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Altis-1 Dec 23.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Altis-1 Sep 23.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Altis-1 Jun 23.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Altis-1 Mar 23.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Altis-1 Dec 22.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Altis-1 Jun 22.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Altis-1 Sep 22.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Altis-1 Mar 22.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Altis-1 Mar 20 (2).pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Altis-1 Jun 21.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Altis-1 Dec 20 1.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Altis-1 Jun 20.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Altis-1 Dec 17.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Altis- 1 Arc ceert Form 1 Q4 18-19.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Altis-1 Sep 18.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Altis- 1 Arc ceert Form 1 Q4 18-19.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Altis-1 Sep 19.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Altis-1 Sep 19.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Altis -1 Arc Cert Form 1 17-18.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Altis-1 Dec 19.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Altis-1 Mar 20.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Altis-1 Sep 20.pdf10 Dec 2024
Certificates of CA (Form 3)File: ALTIS - 1 RERA CERTIFICATE SEP 2018.pdf10 Dec 2024
Certificates of CA (Form 3)File: ALTIS-1 RERA CERTIFICATE Dec 18.pdf10 Dec 2024
Certificates of CA (Form 3)File: ALTIS - 1 RERA CERTIFICATE Mar 19.pdf10 Dec 2024
Certificates of CA (Form 3)File: ALTIS 1 RERA CERTIFICATE JUNE 2019.pdf10 Dec 2024
Certificates of CA (Form 3)File: Rera Certificate form 03 Altis-1 Sep 2024.pdf25 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: signedFORM 2_Engg Certificate Altis-1 Sep 2024.pdf25 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q2_AC_Form-1_Altis-1_2024.pdf10 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: signedQ1_AC_Form-1_Altis-1_2024.pdf19 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: signedFORM 2_Engg Certificate Altis-1 June 2024.pdf19 Jul 2024
Certificates of CA (Form 3)File: Form 03 Altis-1 Rera Certificate June 2024.pdf19 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: 20240710002833.pdf10 Jul 2024
OtherFile: 20240710002833.pdf10 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Altis-1 22-23.pdf28 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SIGNEDForm 2A - QAC-NEXZN ALTIS 1-FY23-24.pdf27 May 2024

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MARATHON NEXZONE ALTIS -1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PALASPE PHATA5,900+ in Raigarh

2 kmMARATHON NEXZONE ALTIS -Completed 85Lapsed / revoked 16Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 125 registered projects within 2 km.

Builder: SANVO RESORTS PVT. LTD.

SANVO RESORTS PVT. LTD. has 37 registrations on MahaRERA, including MARATHON NEXZONE ZODIAC -1 and MARATHON NEXZONE ZODIAC -2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if MARATHON NEXZONE ALTIS -1 is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MARATHON NEXZONE ALTIS -1?

The registered promoter entity is SANVO RESORTS PVT. LTD., a company as per the filing. Its CIN U55103MH2001PTC132675 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MARATHON NEXZONE ALTIS -1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MARATHON NEXZONE ALTIS -1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MARATHON NEXZONE ALTIS -1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in MARATHON NEXZONE ALTIS -1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MARATHON NEXZONE ALTIS -1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MARATHON NEXZONE ALTIS -1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.