ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / MARATHON NEXZONE ACRUX -1

Registration lapsed No litigation declared Residential / Group Housing project

MARATHON NEXZONE ACRUX -1

By SANVO RESORTS PVT. LTD.

RG-MH-09635 · RERA P52000000670 · Last updated on MahaRERA portal: 23 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 58 months past the filed date
  • 3 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2021Possession promised58 months past this date
11 of 11Construction stages doneevery applicable stage filed complete
3Complaints at MahaRERAon this registration
Jump to the 129 documents Report an error

MARATHON NEXZONE ACRUX -1 is a Residential / Group Housing project by SANVO RESORTS PVT. LTD. in Raigarh, Maharashtra, registered with MahaRERA as P52000000670 on 19 Jul 2017. Possession was promised by 30 Dec 2021 and is now 58 months past that date. 3 complaints are on record with the regulator.

At a glance

Project

  • NameMARATHON NEXZONE ACRUX -1
  • TypeResidential / Group Housing
  • Location
    • MAHARASHTRA
    • PANVEL
    • Kolkhe
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000000670
  • ReraGenie IDRG-MH-09635

Builder

  • NameSANVO RESORTS PVT. LTD.
  • Entity typeCompany
  • CINU55103MH2001PTC132675
  • DirectorsSAMYAG MAYUR SHAH, URVESH VIRENDRA MEHTA
  • Other registrations36 more →
  • Completed18 of 37
  • No longer live8 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

58 months past promisethis monthRegisteredJul 2017PromisedDec 2021

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Jul 2017
  • Promised completion30 Dec 2021
  • Revised completionNone
  • Buildings1 building record
  • Documents filed129 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MARATHON NEXZONE ACRUX -1NA280000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

MARATHON NEXZONE ACRUX -1: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 23 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed162

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots162
Closed/Covered162

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area653 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI14019.23
Proposed, not sanctioned12,960 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch5 6 7 JALARAM ASHISH CO OP HSG SOCIETY MULUND WEST DEVIDAYAL ROAD MUMBAI 400080

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANTOSH KUMAR PREMCHANDRA DUBEY
EngineerURVESH VIRENDRA MEHTA
EngineerGURRUNATH DHAVAN
Chartered AccountantPREETI SINGH
Chartered AccountantDinesh Ganpat Pai
PartnerRole in project
SANVO RESORTS PVT. LTD.-

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000054694RAHUL HARISH GHOLE & SHRUTI RAHUL GHOLESANVO RESORTS PRIVATE LIMITED30/05/2018
CC006000000057174Shreedhar SinghSanvo Resorts Pvt. Ltd.05/12/2018
CC006000000480182Sanvo Resorts Pvt. LtdMs. Preeti Mishra23/04/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jan 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Mar 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Dec 2024

Documents filed129

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4_AC_Form-1_Acrux-1_2025.pdf23 Apr 2025
Certificates of CA (Form 3)File: Rera Certificate Accrux 1 March 25.pdf23 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: signedFORM 2_Engg Certificate Acrux 1-Mar 2025.pdf23 Apr 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate ACRUX 1 Mar 2020 (2).pdf27 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate ACRUX 1 Sep 2020.pdf27 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate ACRUX 1 Dec 2020.pdf27 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate Acrux 1 March 21.pdf27 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate Acrux 1 June 21.pdf27 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate Acrux 1 Sep 21.pdf27 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate Acrux 1 Dec 21.pdf27 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate Acrux 1 March 22.pdf27 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate Acrux 1 June 22.pdf27 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate Acrux 1 Sep 22.pdf27 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate Acrux 1 Dec 22.pdf27 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate Acrux 1 March 23.pdf27 Mar 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate ACRUX 1 Jun 2023.pdf27 Mar 2025
Certificates of CA (Form 3)File: Form 3 Ca Cert ACRUX 1 Dec 2019.pdf11 Feb 2025
Certificates of CA (Form 3)File: Form 3 Ca Cert ACRUX 1 Jun 2020.pdf11 Feb 2025
Certificates of CA (Form 3)File: Acrux 1 Form 03 Rera Certificate Dec 2024.pdf24 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_Engg Certificate Acrux 1-Dec 2024.pdf24 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3_AC_Form-1_Acrux-1_2024.pdf13 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Acrux-1 Mar 2020.pdf8 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Acrux-1 Dec 2019.pdf8 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Acrux 1 Sep 2019.pdf8 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Acrux-1 Mar 2019.pdf8 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Acrux-1 Dec 2018.pdf8 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Acrux-1 Sep 2018.pdf8 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Acrux-1 Jun 2018.pdf8 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Acrux-1 Mar 2018.pdf8 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Acrux-1 Dec 2017.pdf8 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Acrux-1 Sep 2017.pdf8 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Acrux-1 Jun 2017.pdf8 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Acrux-1 Jun 2020.pdf8 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Acrux-1 Sep 2020.pdf8 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Acrux-1 Dec 2020.pdf8 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Acrux-1 Mar 2021.pdf8 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Acrux-1 Jun 2021.pdf8 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Acrux-1 Sep 2021.pdf8 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Acrux-1 Dec 2021.pdf8 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Acrux-1 Mar 2022.pdf8 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Acrux 1 Jun 2021.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Acrux 1 Dec 2023.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 03 Acrux-1 Rera Certificate Dec 2023.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Acrux 1 Sep 2023.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Acrux 1 Jun 2023.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Acrux 1 Mar 2023.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Acrux 1 Dec 2022.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Acrux 1 Sep 2022.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Acrux 1 Jun 2022.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Acrux1 Dec 2021.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Acrux 1 Sep 2021.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 ArcCert Acrux 1 Mar 2021.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Acrux 1 Mar 2018.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Acrux 1 Sep 2017.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Acrux 1 Dec 2018.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Acrux 1 Dec 2020.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Acrux 1 Sep 2018.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Acrux 1 Jun 2019.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Acrux 1 Sep 2019.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Acrux 1 Dec 2020.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Acrux 1 Mar 2020.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Acrux 1 Jun 2020.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Acrux 1 Sep 2020.pdf24 Dec 2024
Certificates of CA (Form 3)File: ACRUX- 1 RERA CERTI SEP 2018.pdf24 Dec 2024
Certificates of CA (Form 3)File: Form 3 CA Cert Acrux 1 Sep 23.pdf24 Dec 2024
Certificates of CA (Form 3)File: Acrux-1 Rera Certificate Sep 19.pdf24 Dec 2024
Certificates of CA (Form 3)File: ACRUX-1 RERA CERT Dec 18.pdf24 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg Cert Acrux 1 Jun 2018.pdf24 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate Acrux 1 Sep-18.pdf24 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate Acrux 1 Dec-18.pdf24 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ACRUX-1.pdf24 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ACRUX-1.pdf24 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Acrux 1 Form 5 March 24.pdf21 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 acrux-1.pdf6 Dec 2024
Certificates of CA (Form 3)File: Form 3 CA Cert Acrux 1 Sep 24.pdf22 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: signedFORM 2_Engg Certificate Acrux 1-Sep 2024.pdf22 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: signedQ1_AC_Form-1_Acrux-1_2024.pdf10 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q2_AC_Form-1_Acrux-1_2024.pdf10 Oct 2024
Certificates of CA (Form 3)File: Form 03 Acrux-1 Rera Certificate June 2024.pdf10 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: signedFORM 2_Engg Certificate Acrux 1-June 2024.pdf10 Oct 2024

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MARATHON NEXZONE ACRUX -1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PANVEL5,900+ in Raigarh

2 kmMARATHON NEXZONE ACRUX -Completed 37Lapsed / revoked 9Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 65 registered projects within 2 km.

Builder: SANVO RESORTS PVT. LTD.

SANVO RESORTS PVT. LTD. has 37 registrations on MahaRERA, including MARATHON NEXZONE ZODIAC -1 and MARATHON NEXZONE ZODIAC -2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that MARATHON NEXZONE ACRUX -1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if MARATHON NEXZONE ACRUX -1 is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MARATHON NEXZONE ACRUX -1?

The registered promoter entity is SANVO RESORTS PVT. LTD., a company as per the filing. Its CIN U55103MH2001PTC132675 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MARATHON NEXZONE ACRUX -1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MARATHON NEXZONE ACRUX -1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MARATHON NEXZONE ACRUX -1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MARATHON NEXZONE ACRUX -1?

The professionals named in the filing: Architect: SANTOSH KUMAR PREMCHANDRA DUBEY; Engineer: URVESH VIRENDRA MEHTA; Engineer: GURRUNATH DHAVAN; Chartered Accountant: PREETI SINGH; Chartered Accountant: Dinesh Ganpat Pai. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MARATHON NEXZONE ACRUX -1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MARATHON NEXZONE ACRUX -1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MARATHON NEXZONE ACRUX -1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.