MARATHE TOWER

By SAIJI DEVELOPERS

RG-MH-04512 · RERA P51700022652 · Last updated on MahaRERA portal: 17 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 9 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 9 months from the original
14 of 22Construction stages doneacross 2 buildings; furthest along: Stilt Floor, 90%
143 of 218Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 39 documents Report an error

MARATHE TOWER is a Residential / Group Housing project by SAIJI DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700022652 on 9 Oct 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 9 months from the original filing. 75 of the 218 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.

At a glance

Project

  • NameMARATHE TOWER
  • TypeResidential / Group Housing
  • Location
    • SURVEY NO.111
    • H.NO.2/A6
    • PLOT NO. 1 AND NO.2
    • MANDA VILLAGE
    • Titwala
    • Kalyan
    • Thane
    • 421605
  • Pincode421605
  • RERA no.P51700022652
  • ReraGenie IDRG-MH-04512

Builder

  • NameSAIJI DEVELOPERS
  • Entity typePartnership
  • PartnersLATA RAMESH MARATHE, PRASANNA RAMESH MARATHE, MANISHA PRASANNA MARATHE
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredOct 2019First promiseMar 2026Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Oct 2019
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Mar 2026)
  • Buildings2 building records
  • Documents filed39 files

Current status

34%75 of 218 units booked
86.8%Work done, per cost certificate

Figures as on 17 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MARATHE TOWER WING ANA663117721198
MARATHE TOWER WING BNA8714620

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 90%.

MARATHE TOWER WING A85%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
MARATHE TOWER WING B82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Closed/Covered40
Open Space10
BuildingClosed/CoveredOpen SpaceTotal
MARATHE TOWER WING A40545
MARATHE TOWER WING B055

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,500 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jun 2025
LandownerVillageDistrict
SAIJI DEVELOPERSKalyanThane

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVLI MUNICIPAL CORPORATION
Permissible FSI5935.2
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKHADAKPADA KALYAN
Estimated costRs 21.83 cr
Cost incurredRs 18.95 cr
Work done86.78%
BuildingWingEstimatedIncurred
MARATHE TOWER WING ANARs 19.24 crRs 16.35 cr
MARATHE TOWER WING BNARs 1.30 crRs 1.30 cr
-NARs 1.30 crRs 1.30 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIJAY PANDEY AND ASSOCIATES
EngineerFAKHRI ABBASBHAI HASAMWALA AND ASSOCIATES
Chartered AccountantJK SONEE AND ASSOCIATES
Chartered AccountantMeet Pratish Shah
Chartered AccountantRONAK VORA AND CO
PartnerRole in project
SAIJI DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA02032620056Mar 2026 → Jul 2026

Reason as filed by the promoterShortage of labour and delay from KDMC in receiving necessary approvals

EA17072621778Mar 2026 → Dec 2026

Reason as filed by the promotershortage of manpower and labour

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Aug 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed39

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Tower Q4 form 1 (1).pdf17 Jul 2026
Withdrawal Update Form 2File: Tower Q4 form 2.pdf17 Jul 2026
Withdrawal Update Form 3File: Marathe Tower form 3 Q4_compressed.pdf17 Jul 2026
Form 2A (FY 2025-2026)File: Rera certificate 2026 -1 (2).pdf17 Jul 2026
Withdrawal Update Form 1File: Tower Q4 form 1 (1).pdf21 Apr 2026
Withdrawal Update Form 2File: Tower Q4 form 2.pdf21 Apr 2026
Withdrawal Update Form 3File: Marathe Tower form 3 Q4_compressed.pdf21 Apr 2026
Form 5 (FY 2025-2026)File: Form 5 TOWER.pdf21 Apr 2026
Form 5 (FY 2024-2025)File: file1_1774259595515 (2) (1).pdf23 Mar 2026
Withdrawal Update Form 1File: FORM 1 Q1 TOWER.pdf2 Mar 2026
Withdrawal Update Form 2File: Rera certificate 2025 -4.pdf2 Mar 2026
Withdrawal Update Form 3File: Form-3 Q2 - Marathe Tower (1)_compressed.pdf2 Mar 2026
Withdrawal Update Form 1File: FORM 1 Q1 TOWER.pdf17 Oct 2025
Withdrawal Update Form 2File: FORM 2 Q2 TOWER.pdf17 Oct 2025
Withdrawal Update Form 3File: Form-3 Q2 - Marathe Tower (1)_compressed.pdf17 Oct 2025
Withdrawal Update Form 1File: form 1 tower.pdf28 Aug 2025
Withdrawal Update Form 2File: Rera certificate 2025 -2.pdf28 Aug 2025
Withdrawal Update Form 3File: SAI JI DEVELOPER CA CERTIFICATE (1)_compressed.pdf28 Aug 2025
Building plan approvalFile: plan8393.pdf13 Aug 2025
Declaration and undertaking (Annexure A)File: vcvcv.pdf13 Aug 2025
Form 3File: 0e124abb-6a51-4593-ae2e-4751c0a4ae35.pdf14 Jun 2025
Form 1File: tower form 1.pdf14 Jun 2025
Form 2File: Rera certificate 2025 -1.pdf14 Jun 2025
Disclosure of Sold and Booked InventoryFile: inventory.pdf14 Jun 2025
Details of encumbrancesFile: DETAILS OF ENCUMBERANCES.pdf2 Oct 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf2 Oct 2019
Declaration in FORM BFile: form b dec.pdf23 Sep 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects certificate.pdf23 Sep 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects certificate.pdf23 Sep 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG certificate,,.pdf23 Sep 2019
Engineers Certificate on Quality Assurance (Form 2A)File: STABILITY report.pdf23 Sep 2019
Proforma of Allotment letterFile: sale deed.pdf23 Sep 2019
OtherFile: sale agreement and proforma.pdf23 Sep 2019
Layout approvalFile: MYSCAN_20190716_0004.pdf31 Jul 2019
Building plan approvalFile: MYSCAN_20190716_0003.pdf31 Jul 2019
Copy of the legal title reportFile: Title certificates.pdf31 Jul 2019
Copy of Layout Approval (in case of layout)File: MYSCAN_20190716_0004.pdf31 Jul 2019
Building Plan Approval (IOD)File: MYSCAN_20190716_0003.pdf31 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf31 Jul 2019

How this compares with Thane

34%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 9 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MARATHE TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MANDA VILLAGE7,600+ in Thane

Builder: SAIJI DEVELOPERS

SAIJI DEVELOPERS has 4 registrations on MahaRERA, including MARATHE FORTUNE and MARATHE ELENZA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if MARATHE TOWER is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MARATHE TOWER?

The registered promoter entity is SAIJI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MARATHE TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MARATHE TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MARATHE TOWER?

The professionals named in the filing: Architect: VIJAY PANDEY AND ASSOCIATES; Engineer: FAKHRI ABBASBHAI HASAMWALA AND ASSOCIATES; Chartered Accountant: JK SONEE AND ASSOCIATES; Chartered Accountant: Meet Pratish Shah; Chartered Accountant: RONAK VORA AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MARATHE TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MARATHE TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MARATHE TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.