Home / Browse projects / Thane, Maharashtra / MARATHE TOWER
MARATHE TOWER
RG-MH-04512 · RERA P51700022652 · Last updated on MahaRERA portal: 17 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 9 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MARATHE TOWER is a Residential / Group Housing project by SAIJI DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700022652 on 9 Oct 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 9 months from the original filing. 75 of the 218 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.
At a glance
Project
- NameMARATHE TOWER
- TypeResidential / Group Housing
- Location
- SURVEY NO.111
- H.NO.2/A6
- PLOT NO. 1 AND NO.2
- MANDA VILLAGE
- Titwala
- Kalyan
- Thane
- 421605
- Pincode421605
- RERA no.P51700022652
- ReraGenie IDRG-MH-04512
Builder
- NameSAIJI DEVELOPERS
- Entity typePartnership
- PartnersLATA RAMESH MARATHE, PRASANNA RAMESH MARATHE, MANISHA PRASANNA MARATHE
- Other registrations3 more →
- Completed1 of 4
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Oct 2019
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Mar 2026)
- Buildings2 building records
- Documents filed39 files
Current status
Figures as on 17 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MARATHE TOWER WING A | NA | 66 | 31 | 177 | 21 | 198 |
| MARATHE TOWER WING B | NA | 8 | 7 | 14 | 6 | 20 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 90%.
MARATHE TOWER WING A85%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 70% |
MARATHE TOWER WING B82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed50
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| MARATHE TOWER WING A | 40 | 5 | 45 |
| MARATHE TOWER WING B | 0 | 5 | 5 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SAIJI DEVELOPERS | Kalyan | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| MARATHE TOWER WING A | NA | Rs 19.24 cr | Rs 16.35 cr |
| MARATHE TOWER WING B | NA | Rs 1.30 cr | Rs 1.30 cr |
| - | NA | Rs 1.30 cr | Rs 1.30 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VIJAY PANDEY AND ASSOCIATES |
| Engineer | FAKHRI ABBASBHAI HASAMWALA AND ASSOCIATES |
| Chartered Accountant | JK SONEE AND ASSOCIATES |
| Chartered Accountant | Meet Pratish Shah |
| Chartered Accountant | RONAK VORA AND CO |
| Partner | Role in project |
|---|---|
| SAIJI DEVELOPERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterShortage of labour and delay from KDMC in receiving necessary approvals
Reason as filed by the promotershortage of manpower and labour
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Aug 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Jul 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed39
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Tower Q4 form 1 (1).pdf | 17 Jul 2026 |
| Withdrawal Update Form 2File: Tower Q4 form 2.pdf | 17 Jul 2026 |
| Withdrawal Update Form 3File: Marathe Tower form 3 Q4_compressed.pdf | 17 Jul 2026 |
| Form 2A (FY 2025-2026)File: Rera certificate 2026 -1 (2).pdf | 17 Jul 2026 |
| Withdrawal Update Form 1File: Tower Q4 form 1 (1).pdf | 21 Apr 2026 |
| Withdrawal Update Form 2File: Tower Q4 form 2.pdf | 21 Apr 2026 |
| Withdrawal Update Form 3File: Marathe Tower form 3 Q4_compressed.pdf | 21 Apr 2026 |
| Form 5 (FY 2025-2026)File: Form 5 TOWER.pdf | 21 Apr 2026 |
| Form 5 (FY 2024-2025)File: file1_1774259595515 (2) (1).pdf | 23 Mar 2026 |
| Withdrawal Update Form 1File: FORM 1 Q1 TOWER.pdf | 2 Mar 2026 |
| Withdrawal Update Form 2File: Rera certificate 2025 -4.pdf | 2 Mar 2026 |
| Withdrawal Update Form 3File: Form-3 Q2 - Marathe Tower (1)_compressed.pdf | 2 Mar 2026 |
| Withdrawal Update Form 1File: FORM 1 Q1 TOWER.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 Q2 TOWER.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: Form-3 Q2 - Marathe Tower (1)_compressed.pdf | 17 Oct 2025 |
| Withdrawal Update Form 1File: form 1 tower.pdf | 28 Aug 2025 |
| Withdrawal Update Form 2File: Rera certificate 2025 -2.pdf | 28 Aug 2025 |
| Withdrawal Update Form 3File: SAI JI DEVELOPER CA CERTIFICATE (1)_compressed.pdf | 28 Aug 2025 |
| Building plan approvalFile: plan8393.pdf | 13 Aug 2025 |
| Declaration and undertaking (Annexure A)File: vcvcv.pdf | 13 Aug 2025 |
| Form 3File: 0e124abb-6a51-4593-ae2e-4751c0a4ae35.pdf | 14 Jun 2025 |
| Form 1File: tower form 1.pdf | 14 Jun 2025 |
| Form 2File: Rera certificate 2025 -1.pdf | 14 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory.pdf | 14 Jun 2025 |
| Details of encumbrancesFile: DETAILS OF ENCUMBERANCES.pdf | 2 Oct 2019 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf | 2 Oct 2019 |
| Declaration in FORM BFile: form b dec.pdf | 23 Sep 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects certificate.pdf | 23 Sep 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects certificate.pdf | 23 Sep 2019 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG certificate,,.pdf | 23 Sep 2019 |
| Engineers Certificate on Quality Assurance (Form 2A)File: STABILITY report.pdf | 23 Sep 2019 |
| Proforma of Allotment letterFile: sale deed.pdf | 23 Sep 2019 |
| OtherFile: sale agreement and proforma.pdf | 23 Sep 2019 |
| Layout approvalFile: MYSCAN_20190716_0004.pdf | 31 Jul 2019 |
| Building plan approvalFile: MYSCAN_20190716_0003.pdf | 31 Jul 2019 |
| Copy of the legal title reportFile: Title certificates.pdf | 31 Jul 2019 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20190716_0004.pdf | 31 Jul 2019 |
| Building Plan Approval (IOD)File: MYSCAN_20190716_0003.pdf | 31 Jul 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf | 31 Jul 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations, which the RERA portal never shows together
- All 39 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MARATHE TOWER on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MANDA VILLAGE7,600+ in Thane
KALAS DARSHAN
JAY GANESH DEVELOPERS
Charms Padamavati Royal Phase 2
Charms Developers
SILVER LINE PHASE - 1
HOME CONSULTANCY
Padamavati Royal Phase 2
Sujeet Kumar Singh
Charms Padamavati Royal Phase 1
Charms Developers
RUSTTAGI AARAMBHA PHASE-III
RUSTAGI ESTATES PRIVATE LIMITED
See every Thane project, with the district possession charts
Builder: SAIJI DEVELOPERS
SAIJI DEVELOPERS has 4 registrations on MahaRERA, including MARATHE FORTUNE and MARATHE ELENZA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if MARATHE TOWER is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MARATHE TOWER?
The registered promoter entity is SAIJI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MARATHE TOWER?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MARATHE TOWER?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MARATHE TOWER?
The professionals named in the filing: Architect: VIJAY PANDEY AND ASSOCIATES; Engineer: FAKHRI ABBASBHAI HASAMWALA AND ASSOCIATES; Chartered Accountant: JK SONEE AND ASSOCIATES; Chartered Accountant: Meet Pratish Shah; Chartered Accountant: RONAK VORA AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MARATHE TOWER?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback