Home / Browse projects / Raigarh, Maharashtra / MAPLE ONE
MAPLE ONE
RG-MH-27780 · RERA P52000024162 · Last updated on MahaRERA portal: 23 May 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 16 months past the filed date
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MAPLE ONE is a Others project by BHOOMI & DHARTI ASSOCIATES in Raigarh, Maharashtra, registered with MahaRERA as P52000024162 on 23 Jan 2020. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 24 months from the original filing.
At a glance
Project
- NameMAPLE ONE
- TypeOthers
- Location
- PLOT NO 59 A
- SECTOR 5A
- Karanjade
- Panvel
- Raigarh
- 410206
- Pincode410206
- RERA no.P52000024162
- ReraGenie IDRG-MH-27780
Builder
- NameBHOOMI & DHARTI ASSOCIATES
- Entity typePartnership
- PartnersMUKESH DAHYABHAI PATEL, DAHYABHAI MADHABHAI PATEL, MINA MUKESH PATEL, BHAVESHKUMAR SHANTILAL PATEL, BHARAT NARSINH PATEL, AMIT NARROTTAM PATEL, NAROTTAM MEGHAJIBHAI PATEL, RASIK NARSINH CHAUHAN
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on23 Jan 2020
- Promised completion30 Jun 2025
- Revised completionRevised to 30 Jun 2025 (originally 30 Jun 2023)
- Buildings1 building record
- Documents filed54 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MAPLE ONE | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 1%.
MAPLE ONE: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 1% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 23 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed9
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DESTINATION ARCHITECTS |
| Engineer | SVPATEL & ASSOCIATES |
| Chartered Accountant | HV PATEL AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| BHOOMI & DHARTI ASSOCIATES | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoteras per our old CC which was received on 27/12/19 we were required to receive plinth OC on or before 27/12/20, but due to COVID we were not able to commence the work and eventually not complete our plinth as per CIDCO deadline therefore we were required to revise our CC as per CIDCO. meanwhile new UDCPR was enforced, so there where many changes in the rules and we were forced to go for new CC. we received our new CC on 31/3/22, but still we have received only part CC which is of only G+3 and still ancillary and premium FSI are yet to be received from CIDCO for which we have already applied for.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Jul 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Jan 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Sep 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 23 May 2025
Documents filed54
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf | 23 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_merged.pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 19 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QAC.pdf | 19 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2023-24.pdf | 19 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 14 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 14 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: virtual completion certificate_2024-12-07.pdf | 13 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ANNUAL REPORT 2022-23.pdf | 6 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf | 31 Dec 2023 |
| Building plan approvalFile: 2ND AMENDED CC DWG_compressed (1).pdf | 3 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2ND AMENDED CC DWG_compressed (1).pdf | 3 Sep 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 2ND AMENDED CC COPY.pdf | 3 Sep 2023 |
| Declaration in FORM BFile: AFFIDAVIT COM DECLARATION.pdf | 15 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A (2).pdf | 28 Jun 2023 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf | 28 Jun 2023 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf | 28 Jun 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: No encumbrances.pdf | 28 Jun 2023 |
| Deviation Report with respect to Allotment letterFile: DEVIATION REPORT - ALLOTMENT LETTER.pdf | 28 Jun 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT - AGREEMENT FOR SALE.pdf | 28 Jun 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200272361904_For_Asset_Based_Search_23_06_2023_15_18_57_222.pdf | 23 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CERSAI_Search_Report_200272376945_For_Asset_Based_Search_23_06_2023_16_39_42_576.pdf | 23 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: page 1.pdf | 26 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: page 4.pdf | 26 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: page 1.pdf | 26 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: page 2.pdf | 26 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: page 3.pdf | 26 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: page 4.pdf | 26 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ca cert.pdf | 26 Apr 2023 |
| Proforma of Agreement for saleFile: NEW SALE AGGRIMENT.pdf | 26 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 1.pdf | 24 Sep 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2.pdf | 24 Sep 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 3.pdf | 24 Sep 2022 |
| Declaration about Commencement CertificateFile: Declaration about CC form D 001.pdf | 14 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory 001.pdf | 14 Sep 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Default Folder (6)_compressed.pdf | 13 Sep 2022 |
| Copy of the legal title reportFile: pg 1.pdf | 26 Jul 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: OFFLINE CC COPY (2)_compressed_compressed_compressed.pdf | 26 Jul 2022 |
| Proforma of Allotment letterFile: NEW ALLOTMENT.pdf | 26 Jul 2022 |
| Proforma of Allotment letterFile: NEW SALE AGGRIMENT.pdf | 26 Jul 2022 |
| Building plan approvalFile: APP PLAN MAPLE 1_compressed.pdf | 16 Jan 2020 |
| Layout approvalFile: APP PLAN MAPLE 1_compressed.pdf | 16 Jan 2020 |
| PAN CardFile: PHOTO-2020-01-03-16-07-19.pdf | 16 Jan 2020 |
| Copy of the legal title reportFile: SEARCH TITLE MAPLE1_compressed_compressed.pdf | 16 Jan 2020 |
| Details of encumbrancesFile: ENCUMBRANCES MAPLE 1.pdf | 16 Jan 2020 |
| Copy of Layout Approval (in case of layout)File: APP PLAN MAPLE 1_compressed.pdf | 16 Jan 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: APP PLAN MAPLE 1_compressed.pdf | 16 Jan 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: MAPLE ONE CC.pdf | 16 Jan 2020 |
| Declaration in FORM BFile: FORM B_compressed.pdf | 16 Jan 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_compressed.pdf | 16 Jan 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RCC.pdf | 16 Jan 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MAPLE 1.pdf | 16 Jan 2020 |
| Proforma of Allotment letterFile: BHOOMI AND DHARATI ASSOCIATES ALLOTMENT.pdf | 16 Jan 2020 |
| Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf | 16 Jan 2020 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| NAKSHTRA | PLOT NO 2 & 3 SECTOR 20 KAMOTHE NAVI MUMBAI | 84 | Completed | Oct 2013 | Sep 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 54 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep MAPLE ONE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SECTOR 5A5,900+ in Raigarh
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: BHOOMI & DHARTI ASSOCIATES
BHOOMI & DHARTI ASSOCIATES has 2 registrations on MahaRERA, including MAPLE ONE and MAPLE 07. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What does it mean that MAPLE ONE shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if MAPLE ONE is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MAPLE ONE?
The registered promoter entity is BHOOMI & DHARTI ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MAPLE ONE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MAPLE ONE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MAPLE ONE?
The professionals named in the filing: Architect: DESTINATION ARCHITECTS; Engineer: SVPATEL & ASSOCIATES; Chartered Accountant: HV PATEL AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MAPLE ONE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback