ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / MANTRA 7 HILLS PHASE IV

Completed No litigation declared Residential / Group Housing project

MANTRA 7 HILLS PHASE IV

By MANTRA BUILDCRAFTS PRIVATE LIMITED

RG-MH-10420 · RERA P52100001757 · Last updated on MahaRERA portal: 27 Nov 2024

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
2Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

MANTRA 7 HILLS PHASE IV is a Residential / Group Housing project by MANTRA BUILDCRAFTS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100001757 on 29 Jul 2017. The registration is recorded completed; possession was promised by 29 Dec 2023. The completion date has moved by 12 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameMANTRA 7 HILLS PHASE IV
  • TypeResidential / Group Housing
  • Location
    • KIRKATWADI
    • Haveli
    • Pune
    • 411024
  • Pincode411024
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001757
  • ReraGenie IDRG-MH-10420

Builder

  • NameMANTRA BUILDCRAFTS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorASHISH SATISH GUPTA
  • Other registrations5 more →
  • Completed4 of 6
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2017First promiseDec 2022Revised toDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jul 2017
  • Promised completion29 Dec 2023
  • Revised completionRevised to 29 Dec 2023 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed84 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING C1 C2NA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

BUILDING C1 C2: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed104

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots104
Closed/Covered104

Land and ownership77

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,377 sq m
Land owned byThe promoter, with other names on the file
Named landowners77
LandownerVillageDistrict
Sundrabai Dnyanoba KaranjavaneKIRKATWADIPune
Shalan Manohar KaranjavaneKIRKATWADIPune
Khushal Manohar KaranjavaneKIRKATWADIPune
Pooja Manohar KaranjavaneKIRKATWADIPune
Seema Dashrath KaranjavaneKIRKATWADIPune
Rukminikant Dashrath KaranjavaneKIRKATWADIPune
Kadambari Dashrath KaranjavaneKIRKATWADIPune
Sharda Hiraman KaranjavaneKIRKATWADIPune
Utkarsh Hiraman KaranjavaneKIRKATWADIPune
Dnyanraj Hiraman KaranjavaneKIRKATWADIPune
Manohar Dnyanoba KaranjavaneKIRKATWADIPune
Dashrath Dnyanoba KaranjavaneKIRKATWADIPune
Hiraman Dnyanoba KaranjavaneKIRKATWADIPune
Laxmibai Sakharam BalkawadeKIRKATWADIPune
Anita Narayan ShitoleKIRKATWADIPune
Surekha Laxman NivanguneKIRKATWADIPune
Sanjay Keshav KaranjavaneKIRKATWADIPune
Keshav Hanumant KaranjavaneKIRKATWADIPune
Kalidas Keshav KaranjavaneKIRKATWADIPune
Sagar Kalidas KaranjavaneKIRKATWADIPune
Laxmi Arun JadhavKIRKATWADIPune
Amruta Pradeep PasalkarKIRKATWADIPune
Sunil Sakharam BalkawadeKIRKATWADIPune
Vijay Sakharam BalkawadeKIRKATWADIPune
Manda Namdev KaranjavaneKIRKATWADIPune
Deepak Namdev KaranjavaneKIRKATWADIPune
Jyostna Deepak KaranjavaneKIRKATWADIPune
Sameer Namdev KranjavaneKIRKATWADIPune
Manisha Namdev KaranjavaneKIRKATWADIPune
Manisha Satish JagtapKIRKATWADIPune
Renuka Santosh GadekarKIRKATWADIPune
Suvarna Rajendra KaranjavaneKIRKATWADIPune
Kajal Rajendra KaranjavaneKIRKATWADIPune
Gurav Rajendra KaranjavaneKIRKATWADIPune
Shakuntala Nivrutti KaranjavaneKIRKATWADIPune
Lalita Sudam KaranjavaneKIRKATWADIPune
Kavita Ganesh KaranjavaneKIRKATWADIPune
Rupali Gokul KaranjavaneKIRKATWADIPune
Sagunabai Gulabrao NivanguneKIRKATWADIPune
Kamal Sahebrao PasalkarKIRKATWADIPune
Namdev Tukaram KaranjavaneKIRKATWADIPune
Rajendra Tukaram KaranjavaneKIRKATWADIPune
Nivrutii Sakharam KaranjavaneKIRKATWADIPune
Sudam Nivrutii KaranjavaneKIRKATWADIPune
Ganesh Nivrutii KaranjavaneKIRKATWADIPune
Gokul Nivrutii KaranjavaneKIRKATWADIPune
Deepali Mahesh KaranjavaneKIRKATWADIPune
Shantaram Madhav KaranjavaneKIRKATWADIPune
Kalpana Shantaram KaranjavaneKIRKATWADIPune
Mahesh Shantaram KaranjavaneKIRKATWADIPune
Avinash Shantaram KaranjavaneKIRKATWADIPune
Priyanka Dhiraysheel JagtapKIRKATWADIPune
Suchitra Nana KaranjavaneKIRKATWADIPune
Riya Nana KaranjavaneKIRKATWADIPune
Manav Nana KaranjavaneKIRKATWADIPune
Nana Madhav KaranjavaneKIRKATWADIPune
Jayashree Akash KaranjavaneKIRKATWADIPune
Manasi Akash KaranjavaneKIRKATWADIPune
Sanyukta Akash KaranjavaneKIRKATWADIPune
Akash Madhav KaranjavaneKIRKATWADIPune
Sunanda Narayan PhalkeKIRKATWADIPune
Archana Chandrakant DhamaleKIRKATWADIPune
Sulochana Duryodhan SonavaneKIRKATWADIPune
Indubai Dnyaneshwar MateKIRKATWADIPune
Asha Namdev TambeKIRKATWADIPune
Pushpalata Rohidas DhamdhereKIRKATWADIPune
Tulsabai Dnyandev HarpaleKIRKATWADIPune
Bhausaheb Dnyandev HarpaleKIRKATWADIPune
Narmada Keshav KaranjavaneKIRKATWADIPune
Surekha Sanjay KaranjavaneKIRKATWADIPune
Aboli Sanjay KaranjavaneKIRKATWADIPune
Saurabh Sanjay KaranjavaneKIRKATWADIPune
Dnyaneshwari Sanjay KaranjavaneKIRKATWADIPune
Sunita Kalidas KaranjavaneKIRKATWADIPune
Archana Navnath KaduKIRKATWADIPune
Neelam Sachin JadhavKIRKATWADIPune
Sunita Sunil BalkawdeKIRKATWADIPune

Approvals and building plan

Permissible FSI9195.0
Proposed, not sanctioned5,377 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS B ROAD

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMITESH SIDHPURA
Chartered AccountantCA Avtarsingh H Saini
PartnerRole in project
MANTRA BUILDCRAFTS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100013000Dec 2022 → Dec 2023

Reason as filed by the promoterPHYSICAL WORK IS COMPLETED AT THE SITE.

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC005000000106470Rajan Gupta For Mantra 7 HillsArun Kisan Kadam18/01/2022
CC005000000106472Rajan Gupta For Mantra 7 HillsVishal Vishnu Nandwadekar18/01/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Nov 2022

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 7 hills ph 4.pdf27 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 7 Hills_FORM 5_Phase 4.pdf29 Aug 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Ph 4.pdf8 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank declaration Phase 4_.pdf23 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 7 Hills_Phase 4.pdf6 Dec 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion _ A C1C2 Bldg.pdf10 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ph 4_Arc Cert.pdf7 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG PHASE 4.pdf7 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1_ARC CERT_PH4.pdf9 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A_ENG CERT_PH4.pdf9 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_ENG CERT_PH4.pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_PH 4_C1-C2.pdf7 Apr 2022
Certificates of CA (Form 3)File: FORM 3_CA CERT_PH4.pdf7 Apr 2022
PAN CardFile: PAN_compressed.pdf7 Mar 2022
Copy of the legal title reportFile: title report dated-26-2-2022-reara_0001_compressed.pdf7 Mar 2022
Details of encumbrancesFile: encum.pdf7 Mar 2022
Declaration about Commencement CertificateFile: CC declaration.pdf7 Mar 2022
Declaration in FORM BFile: Form b Promotor.pdf7 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT_PH4.pdf8 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG_PHASE4.pdf8 Jan 2022
CERSAI detailsFile: Simply Cersai - MANTRA 7 HILLS PHASE IV.pdf8 Jan 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD PH4_compressed.pdf8 Jan 2022
Certificates of CA (Form 3)File: CA_CERT_PH4_compressed.pdf8 Jan 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: C1 C2_compressed.pdf2 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: phase 4_compressed.pdf6 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng phase 4_compressed.pdf6 Oct 2021
Disclosure of sold/ booked inventoryFile: PHASE 4_compressed (1).pdf6 Oct 2021
Certificates of CA (Form 3)File: PHASE 4_compressed.pdf6 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 7hills C1 C2 4th phase QA.pdf5 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: mantra Buildcraft phase 4 certificate 19-20.pdf5 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Mantra Buildcraft Phase 4 certificate 20-21.pdf5 Oct 2021
Declaration about Commencement CertificateFile: 7 HILLS.pdf4 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 7hills C1 C2 4th phase QA.pdf3 Oct 2021
Certificates of CA (Form 3)File: CA Certificate for RERA 7 Hills phase 4 C1 C2.pdf19 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Phase 4.pdf18 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: phase4.pdf18 Aug 2021
Disclosure of sold/ booked inventoryFile: 7 Hills Ph 4_compressed.pdf27 Jul 2021
Disclosure of sold/ booked inventoryFile: 7 Hills Ph 4_compressed.pdf2 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Phase 4.pdf25 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG phase 4_compressed.pdf20 Nov 2020
Certificates of CA (Form 3)File: CA Certificate for RERA 7 Hills phase 4 C1 C2.pdf20 Nov 2020
Details of encumbrancesFile: DECLARATION.pdf20 Aug 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: MANTRA BUILDCRAFT 4.pdf17 Dec 2019
Layout approvalFile: 222.pdf29 Jul 2019
Copy of Layout Approval (in case of layout)File: 222.pdf29 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: phase 4-ilovepdf-compressed.pdf6 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate 7 Hills C1 C2 of Phase 4.pdf6 Dec 2018
Certificates of CA (Form 5)File: MS Mantra Buildcraft LLP PHASE 4_FORM 5_2018.pdf23 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate 7 Hills C1 C2 Phase 4.pdf20 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PHASE 4 7 HILLS.pdf20 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Phase 4.pdf30 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7 Hills phase 4 engg certificate.pdf30 Mar 2018
Certificates of CA (Form 3)File: CA Certificate 7 Hills Ph 4.pdf30 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate 7 Hills Phase 4 C1 C2.pdf11 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Phase4-ilovepdf-compressed.pdf11 Jan 2018
Certificates of CA (Form 3)File: 7 hills phase4.pdf11 Jan 2018
Building plan approvalFile: PROPOSED C 1C2 WING PLAN EVEN .pdf25 Jul 2017
Building plan approvalFile: PROPOSED C 1C2 WING PLAN ODD FLOOR .pdf25 Jul 2017
Building plan approvalFile: PROPOSED C 1C2 WING PLAN REFUGE FLOOR .pdf25 Jul 2017
Copy of the legal title reportFile: Gat No 642 Search Report.pdf25 Jul 2017
Copy of the legal title reportFile: Gat No 651 655 Search Report.pdf25 Jul 2017
Copy of the legal title reportFile: Gat No 651 655 Search Report.pdf25 Jul 2017
Copy of the legal title reportFile: Gat No 652 Search Report.pdf25 Jul 2017
Copy of the legal title reportFile: Gat No 654 Search Report.pdf25 Jul 2017
Building Plan Approval (IOD)File: PROPOSED C 1C2 WING PLAN EVEN .pdf25 Jul 2017
Building Plan Approval (IOD)File: PROPOSED C 1C2 WING PLAN ODD FLOOR .pdf25 Jul 2017
Building Plan Approval (IOD)File: PROPOSED C 1C2 WING PLAN REFUGE FLOOR .pdf25 Jul 2017
Declaration in FORM BFile: 7 hills phase - IV-ilovepdf-compressed (1).pdf25 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT - C1 C2.pdf25 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERT - C1 C2.pdf25 Jul 2017
Certificates of CA (Form 3)File: CA C1 C2.pdf25 Jul 2017
Proforma of Allotment letterFile: 7 HILLS AGREEMENT.pdf25 Jul 2017
Proforma of Allotment letterFile: Allotment letter SP4.pdf25 Jul 2017
Details of encumbrancesFile: 7 HILLS ENCUM.PDF23 Jul 2017
Layout approvalFile: SANCTIONED LAYOUT PLAN.PDF22 Jul 2017
Layout approvalFile: Proposed master layout 7 hills.pdf22 Jul 2017
Building plan approvalFile: C1 C2 FLOOR PLAN 2.pdf22 Jul 2017
Building plan approvalFile: C1 C2 FLOOR PLAN.pdf22 Jul 2017
PAN CardFile: Mantra Buildcrafts LLP.pdf22 Jul 2017
Copy of Layout Approval (in case of layout)File: SANCTIONED LAYOUT PLAN.PDF22 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MANTRA 7 HILLS PHASE IV on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KIRKATWADI13,700+ in Pune

2 kmMANTRA 7 HILLS PHASE IVCompleted 19Lapsed / revoked 19Other 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 61 registered projects within 2 km.

Builder: MANTRA BUILDCRAFTS PRIVATE LIMITED

MANTRA BUILDCRAFTS PRIVATE LIMITED has 6 registrations on MahaRERA, including MANTRA 7 HILLS PHASE I and MANTRA 7 HILLS PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MANTRA 7 HILLS PHASE IV is delayed beyond 29 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MANTRA 7 HILLS PHASE IV?

The registered promoter entity is MANTRA BUILDCRAFTS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MANTRA 7 HILLS PHASE IV?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MANTRA 7 HILLS PHASE IV?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MANTRA 7 HILLS PHASE IV?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MANTRA 7 HILLS PHASE IV?

The professionals named in the filing: Architect: MITESH SIDHPURA; Chartered Accountant: CA Avtarsingh H Saini. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANTRA 7 HILLS PHASE IV?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANTRA 7 HILLS PHASE IV. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANTRA 7 HILLS PHASE IV to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.