Registration lapsed No litigation declared Others project

MANOVI PRITHVI

By MANOVI PRITHVI

RG-MH-30210 · RERA P51700030451 · Last updated on MahaRERA portal: 16 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 5 months past the filed date
  • Completion date moved by 24 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
May 2026Possession promised5 months past this date
8 of 11Construction stages donefurthest along: Basement (if any), 0%
7 of 30Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

MANOVI PRITHVI is a Others project by MANOVI PRITHVI in Thane, Maharashtra, registered with MahaRERA as P51700030451 on 25 Aug 2021. Possession was promised by 31 May 2026 and is now 5 months past that date. The completion date has moved by 24 months from the original filing. 23 of the 30 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameMANOVI PRITHVI
  • TypeOthers
  • Location
    • NEAR TITWALA MANDIR
    • Titwala
    • Kalyan
    • Thane
    • 421605
  • Pincode421605
  • RERA no.P51700030451
  • ReraGenie IDRG-MH-30210

Builder

  • NameMANOVI PRITHVI
  • Entity typePartnership
  • PartnersVIMAL RAMNIKLAL VASANI THAKKAR, CHETAN KIRTIKUMAR THAKKAR, TANAY BHUSHAN KARIA

Key dates

5 months past promisethis monthRegisteredAug 2021First promiseMay 2024Revised toMay 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on25 Aug 2021
  • Promised completion31 May 2026
  • Revised completionRevised to 31 May 2026 (originally 31 May 2024)
  • Buildings1 building record
  • Documents filed105 files

Current status

77%23 of 30 units booked
99.8%Work done, per cost certificate

Figures as on 16 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MANOVI PRITHVINA8722830

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

MANOVI PRITHVI: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 16 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed7

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots7
Closed/Covered2
Open Space5

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area598 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Jun 2025
LandownerVillageDistrict
DINESH KUMAR MUNNALAL SHARMAKATEMANEVALIThane
GAYATRI MUNNALAL SHARMAKATEMANEVALIThane

Approvals and building plan

Sanctioning authorityKalyan Dombivali Municipal Corporation
Permissible FSI1289.26
Proposed, not sanctioned1,289 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJEEVARSHI APARTMENT NR IMAGE SHOWROOM SHIVAJI CHOWK KALYAN WEST PIN 421301
Estimated costRs 3.92 cr
Cost incurredRs 3.91 cr
Work done99.85%
BuildingWingEstimatedIncurred
MANOVI PRITHVINARs 3.77 crRs 3.77 cr
-NARs 14.69 lakhRs 14.10 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANTOSH MADAN & ASSOCIATES
EngineerKHASNIS & ASSOCIATES
Chartered AccountantDEEPAK PUROHIT
Chartered AccountantC.M. Lad & Associates
PartnerRole in project
MANOVI PRITHVI-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700024591May 2024 → May 2025

Reason as filed by the promoterThe Project was given on ‘Lock & Key’ contract basis. However, the shortage in the supply of labours by the contractor caused delay in project completion.

EA14062501591May 2024 → Nov 2025

Reason as filed by the promoterThe Project got delayed due to an unforeseen shortage of labour caused by health crises, migration of workers, etc. Despite our best efforts to secure adequate labour resources, the unavailability of skilled labour has led to unavoidable setbacks in the progress of the work.

EA24022619976May 2024 → May 2026

Reason as filed by the promoterThe Project got delayed due to an unforeseen shortage of labour caused by health crises, migration of workers, etc. Despite our best efforts to secure adequate labour resources, the unavailability of skilled labour has led to unavoidable setbacks in the progress of the work.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Jul 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jul 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 MARCH.pdf16 Jun 2026
Withdrawal Update Form 2File: FORM 2 MARCH.pdf16 Jun 2026
Withdrawal Update Form 3File: FORM 3.pdf16 Jun 2026
Withdrawal Update Form 1File: FORM 1 DEC.pdf12 May 2026
Withdrawal Update Form 2File: FORM 2 DEC.pdf12 May 2026
Withdrawal Update Form 3File: FORM 3 DEC.pdf12 May 2026
Withdrawal Update Form 1File: FORM 1.pdf24 Feb 2026
Withdrawal Update Form 1File: FORM 1 NOV.pdf24 Feb 2026
Withdrawal Update Form 2File: FORM 2.pdf24 Feb 2026
Withdrawal Update Form 2File: FORM 2.pdf24 Feb 2026
Withdrawal Update Form 3File: FORM 3.pdf24 Feb 2026
Withdrawal Update Form 3File: FORM 3.pdf24 Feb 2026
Withdrawal Update Form 1File: FORM 1.pdf31 Dec 2025
Withdrawal Update Form 2File: FORM 2.pdf31 Dec 2025
Withdrawal Update Form 3File: Withdrawal Application Form3..pdf31 Dec 2025
Withdrawal Update Form 1File: FORM 1.pdf28 Dec 2025
Withdrawal Update Form 1File: FORM 1.pdf28 Dec 2025
Withdrawal Update Form 2File: FORM 2.pdf28 Dec 2025
Withdrawal Update Form 2File: FORM 2.pdf28 Dec 2025
Withdrawal Update Form 3File: Withdrawal Application Form3..pdf28 Dec 2025
Withdrawal Update Form 3File: Withdrawal Application Form3..pdf28 Dec 2025
Form 5 (FY 2024-2025)File: Manovi Prithvi.pdf6 Oct 2025
Form 1File: Form 1.pdf13 Jun 2025
Form 2File: Form 2.pdf13 Jun 2025
Form 3File: Form 3.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory.pdf13 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf23 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf1 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf1 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf1 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Signed form 5.pdf29 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q2.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q2.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q2.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf16 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf16 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MANOVI PRITHVI.pdf16 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf21 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf21 Jun 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf2 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf29 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 31-12-2023 Manovi Prithvi Final.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate June'23.pdf17 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sept'23.pdf17 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate June'23.pdf17 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sept'23.pdf17 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June'23 Final.pdf17 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Manovi Prithvi Sept'23 Final.pdf17 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf31 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf31 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A.pdf31 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf31 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf31 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A.pdf20 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf13 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf13 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf6 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf6 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 23-01-23.pdf2 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 27-01-23.pdf2 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 07-12-2022.pdf16 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cerificate.pdf20 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf20 Dec 2022
Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked Inventory.pdf9 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf6 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 14-11-2022_compressed.pdf22 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 16-11-22_compressed.pdf22 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf8 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf8 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf30 Sep 2022
Building plan approvalFile: Plan merged compressed.pdf13 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan merged compressed.pdf13 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Aug-22.pdf13 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf13 Aug 2022
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold.pdf13 Aug 2022

How this compares with Thane

77%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 24 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MANOVI PRITHVI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR TITWALA MANDIR7,600+ in Thane

Builder: MANOVI PRITHVI

MANOVI PRITHVI has 1 registration on MahaRERA, including MANOVI PRITHVI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that MANOVI PRITHVI shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if MANOVI PRITHVI is delayed beyond 31 May 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MANOVI PRITHVI?

The registered promoter entity is MANOVI PRITHVI, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MANOVI PRITHVI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MANOVI PRITHVI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MANOVI PRITHVI?

The professionals named in the filing: Architect: SANTOSH MADAN & ASSOCIATES; Engineer: KHASNIS & ASSOCIATES; Chartered Accountant: DEEPAK PUROHIT; Chartered Accountant: C.M. Lad & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANOVI PRITHVI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANOVI PRITHVI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANOVI PRITHVI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.