Home / Browse projects / Nashik, Maharashtra / MANOMAY NATURES PARADIZE
MANOMAY NATURES PARADIZE
By K. B. ROHAMARE HOUSING PVT. LTD.
RG-MH-09166 · RERA P51600014658 · Last updated on MahaRERA portal: 4 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 48 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MANOMAY NATURES PARADIZE is a Residential / Group Housing project by K. B. ROHAMARE HOUSING PVT. LTD. in Nashik, Maharashtra, registered with MahaRERA as P51600014658 on 20 Dec 2017. Possession is promised by 31 Dec 2028. The completion date has moved by 48 months from the original filing. 34 of the 84 units on this registration are recorded sold or booked, and 44 of 231 construction stages are filed complete.
At a glance
Project
- NameMANOMAY NATURES PARADIZE
- TypeResidential / Group Housing
- Location
- BHANDARDARA ROAD
- PIMPRISODDIN
- PimpriSado
- Igatpuri
- Nashik
- 422403
- Pincode422403
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600014658
- ReraGenie IDRG-MH-09166
Builder
- NameK. B. ROHAMARE HOUSING PVT. LTD.
- Entity typeCompany
- DirectorsSANYUKTA AMIT ROHAMARE, NILESH NARAYAN SURDE, ONKARSING GOPALSING PARDESHI, SHANTARAM FULA SALUNKE, DILIP MURLIDHAR RAHANE, SHAILAJA DILIP RAHANE, PANKAJ DILIP RAHANE, SAMRUDDHI PANKAJ RAHANE
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on20 Dec 2017
- Promised completion31 Dec 2028
- Revised completionRevised to 31 Dec 2028 (originally 30 Dec 2024)
- Buildings21 building records
- Documents filed169 files
Current status
Figures as on 4 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| LILY STUDIO APARTMENT WING - A, WING - B, and WING - C | NA | 3 | 3 | 48 | 0 | 48 |
| LILY STUDIO APARTMENT WING - D | NA | 4 | 4 | 12 | 0 | 12 |
| DAFFODIL ROW BUNGLOWS PLOT NO 37 TO 42 | NA | 2 | 1 | 6 | 0 | 6 |
| DAFFODIL ROW BUNGLOWS PLOT NO 43 TO 48 | NA | 2 | 1 | 6 | 0 | 6 |
| DAFFODIL ROW BUNGLOWS PLOT NO 49 TO 54 | NA | 2 | 1 | 6 | 0 | 6 |
| ASTER ROW BUNGLOWS PLOT NO 31 TO 36 | NA | 2 | 1 | 6 | 0 | 6 |
| 0 | NA | 4 | 0 | 0 | 0 | 0 |
| 0 | NA | 0 | 0 | 0 | 0 | 0 |
| 0 | NA | 0 | 0 | 0 | 0 | 0 |
| 0 | NA | 4 | 0 | 0 | 0 | 0 |
| 0 | NA | 0 | 0 | 0 | 0 | 0 |
| 0 | NA | 4 | 0 | 0 | 0 | 0 |
| 0 | NA | 0 | 0 | 0 | 0 | 0 |
| 0 | NA | 0 | 0 | 0 | 0 | 0 |
| 0 | NA | 4 | 0 | 0 | 0 | 0 |
| 0 | NA | 4 | 0 | 0 | 0 | 0 |
| 0 | NA | 0 | 0 | 0 | 0 | 0 |
| 0 | NA | 3 | 0 | 0 | 0 | 0 |
| 0 | NA | 2 | 0 | 0 | 0 | 0 |
| 0 | NA | 5 | 0 | 0 | 0 | 0 |
| 0 | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 4 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 21 buildings; the table lists the first 20.
44 of 231 construction stages are filed complete across 21 buildings. The stage furthest along is External plumbing and external plaster, at 50%.
LILY STUDIO APARTMENT WING - A, WING - B, and WING - C73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
LILY STUDIO APARTMENT WING - D73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
DAFFODIL ROW BUNGLOWS PLOT NO 37 TO 4282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
DAFFODIL ROW BUNGLOWS PLOT NO 43 TO 4882%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
DAFFODIL ROW BUNGLOWS PLOT NO 49 TO 5468%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ASTER ROW BUNGLOWS PLOT NO 31 TO 3623%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
00%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
00%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
00%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
00%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
00%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
00%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
00%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
00%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
00%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
00%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
00%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
00%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
027%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
00%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 4 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 95% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 45% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 80% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 25% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 15% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed84
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| LILY STUDIO APARTMENT WING - A, WING - B, and WING - C | 0 | 36 | 36 |
| LILY STUDIO APARTMENT WING - D | 0 | 8 | 8 |
| DAFFODIL ROW BUNGLOWS PLOT NO 37 TO 42 | 0 | 6 | 6 |
| DAFFODIL ROW BUNGLOWS PLOT NO 43 TO 48 | 0 | 6 | 6 |
| DAFFODIL ROW BUNGLOWS PLOT NO 49 TO 54 | 0 | 6 | 6 |
| ASTER ROW BUNGLOWS PLOT NO 31 TO 36 | 0 | 6 | 6 |
| 0 | 1 | 1 | 2 |
| 0 | 1 | 1 | 2 |
| 0 | 1 | 1 | 2 |
| 0 | 1 | 1 | 2 |
| 0 | 1 | 1 | 2 |
| 0 | 0 | 1 | 1 |
| 0 | 0 | 1 | 1 |
| 0 | 1 | 1 | 2 |
| 0 | 1 | 1 | 2 |
Land and ownership7
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| RAJENDRA BANDU KHATALE | Igatpuri (M Cl) | Nashik |
| SANJAY BANDU KHATALE | Igatpuri (M Cl) | Nashik |
| MAYA SUNIL KHATALE | Igatpuri (M Cl) | Nashik |
| BHAGWAN PUNDLIK KHATALE | Igatpuri (M Cl) | Nashik |
| BALU PUNDLIK KHATALE | Igatpuri (M Cl) | Nashik |
| GANESH PUNDLIK KHATALE | Igatpuri (M Cl) | Nashik |
| VINAYAK BHAGWAN PATIL | Igatpuri (M Cl) | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| LILY STUDIO APARTMENT WING - A, WING - B, and WING - C | NA | Rs 3.70 cr | Rs 3.25 cr |
| LILY STUDIO APARTMENT WING - D | NA | Rs 1.24 cr | Rs 1.13 cr |
| - | NA | Rs 64.35 lakh | Rs 52.52 lakh |
| DAFFODIL ROW BUNGLOWS PLOT NO 37 TO 42 | NA | Rs 43.28 lakh | Rs 43.28 lakh |
| DAFFODIL ROW BUNGLOWS PLOT NO 43 TO 48 | NA | Rs 41.30 lakh | Rs 41.30 lakh |
| DAFFODIL ROW BUNGLOWS PLOT NO 49 TO 54 | NA | Rs 41.12 lakh | Rs 22.30 lakh |
| ASTER ROW BUNGLOWS PLOT NO 31 TO 36 | NA | Rs 40.89 lakh | Rs 23.81 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DHIRAJ WALUNJ |
| Engineer | AMIT MADHUKAR SANAP |
| Engineer | Babasaheb Sampat Thorat |
| Chartered Accountant | RSPH & Associates |
| Chartered Accountant | CA Suchita Rakesh Pawar |
| Chartered Accountant | CA Pratik D Jain |
| Partner | Role in project |
|---|---|
| K B Rohamare Housing Private Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promotera) As the entire country including Mumbai Suburban were under a total lock-down; and the Government of India as well as the Government of Maharashtra had announced a slew of measures including “work from home” and “social distancing” to curb the spread of the COVID-19. In view of the curbs and measures imposed by the Governments, I stopped work till such time as the said lockdowns, curbs and measures were relaxed by the respective Governments. b) Inspite of best efforts, the said project was adversely affected due to unprecedented COVID-19 Pandemic which lasted for more than 2 years and are st
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Dec 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 May 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 May 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed169
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 169 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A March 2026..pdf | 4 Jul 2026 |
| Form 2A (FY 2017-2018)File: Form 2A - March 2018.pdf | 15 May 2026 |
| Form 2A (FY 2018-2019)File: Form 2A - March 2019.pdf | 15 May 2026 |
| Form 2A (FY 2019-2020)File: Form 2A - March 2020.pdf | 15 May 2026 |
| Form 2A (FY 2020-2021)File: Form 2A - March 2021.pdf | 15 May 2026 |
| Form 2A (FY 2021-2022)File: Form 2A - March 2022.pdf | 15 May 2026 |
| Form 2A (FY 2022-2023)File: Form 2A - March 2023.pdf | 15 May 2026 |
| Form 2A (FY 2023-2024)File: Form 2A - March 2024.pdf | 15 May 2026 |
| Form 5 (FY 2022-2023)File: RERA Audit 22-23.pdf | 15 May 2026 |
| Withdrawal Update Form 1File: AR Certificate.pdf | 23 Apr 2026 |
| Withdrawal Update Form 1File: 1-Architect Certificate March 26.pdf | 23 Apr 2026 |
| Withdrawal Update Form 2File: ER Certificate.pdf | 23 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 .pdf | 23 Apr 2026 |
| Withdrawal Update Form 3File: CA Certificate.pdf | 23 Apr 2026 |
| Withdrawal Update Form 3File: CA March-25.pdf | 23 Apr 2026 |
| Form 5 (FY 2024-2025)File: Audit Report 24-25 KB Rohmare.pdf | 25 Feb 2026 |
| Form 2A (FY 2024-2025)File: Form 2A March 2025.pdf | 5 Feb 2026 |
| Form 1File: 1-Architect Certificate March_25.pdf | 4 Feb 2026 |
| Form 2File: 2-Engineer Certificate March_25.pdf | 4 Feb 2026 |
| Form 3File: 3-Final CA Cert_Manomaya-March-25 Sign.pdf | 4 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - K B Rohamare Housing Pvt Ltd - Copy.pdf | 4 Feb 2026 |
| Form 1File: Architect Certificate-Dec-24.pdf | 4 Feb 2026 |
| Form 2File: Engineer Certificate-Dec-24.pdf | 4 Feb 2026 |
| Form 3File: CA Certificate-Dec-24.pdf | 4 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory.pdf | 4 Feb 2026 |
| Form 1File: 2 Architect Certificate_Oct 2024.pdf | 4 Feb 2026 |
| Form 2File: FORM 2.pdf | 4 Feb 2026 |
| Form 3File: CA Cert_Manomaya_ Sept 24 Final signed copy.pdf | 4 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory.pdf | 4 Feb 2026 |
| Form 5 (FY 2023-2024)File: Audit Report 23-24 KB Rohmare final.pdf | 4 Feb 2026 |
| Form 1File: AR - Dec 25 Final.pdf | 20 Jan 2026 |
| Form 2File: ER - Dec 25 .pdf | 20 Jan 2026 |
| Form 3File: CA - Dec 25 final.pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - Dec 25.pdf | 20 Jan 2026 |
| Form 1File: AR - Sept 25.pdf | 15 Oct 2025 |
| Form 2File: ER - sept 25.pdf | 15 Oct 2025 |
| Form 3File: CA - Sept 25 final.pdf | 15 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory June 25.pdf | 15 Oct 2025 |
| Other - TechnicalFile: Form 2A F Y 24-25-Rohamare.pdf | 3 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A F Y 24-25-Rohamare.pdf | 3 Jul 2025 |
| Other - TechnicalFile: Can Deed MANOJSING CHANDEL FLAT NO 26 DAFFDIL BANGLOW 1-40.pdf | 22 May 2025 |
| Other - TechnicalFile: Can Deed MANOJSING CHANDEL FLAT NO 26 DAFFDIL BANGLOW-41-60.pdf | 22 May 2025 |
| Other - TechnicalFile: Can Deed MANOJSING CHANDEL FLAT NO 26 DAFFDIL BANGLOW 61-86.pdf | 22 May 2025 |
| Other - TechnicalFile: CANCELLATON DEED DARSHAN SALUNKHE FLAT BO C 102 LI Y STUDIO APT 1-30.pdf | 22 May 2025 |
| Other - TechnicalFile: CANCELLATON DEED DARSHAN SALUNKHE FLAT BO C 102 LI Y STUDIO APT 31-50.pdf | 22 May 2025 |
| Other - TechnicalFile: CANCELLATON DEED DARSHAN SALUNKHE FLAT BO C 102 LI Y STUDIO APT 51-73.pdf | 22 May 2025 |
| Other - TechnicalFile: Can Deed RAHUL V GHOGARE FLAT BO C 401 LI Y STUDIO APT 1-30.pdf | 22 May 2025 |
| Other - TechnicalFile: Can Deed RAHUL V GHOGARE FLAT BO C 401 LI-Y STUDIO APT 31-50.pdf | 22 May 2025 |
| Other - TechnicalFile: Can Deed RAHUL V GHOGARE FLAT BO C 401 LI-Y STUDIO APT 51-72.pdf | 22 May 2025 |
| Declaration in FORM BFile: Form B - Developer.pdf | 23 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate FY25.pdf | 17 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1-Architect Certificate March_25_compressed (1).pdf | 16 Apr 2025 |
| Certificates of CA (Form 3)File: 3-Final CA Cert_Manomaya-March-25 Sign.pdf | 16 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2-Engineer Certificate March_25.pdf | 16 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - K B Rohamare Housing Pvt Ltd - Copy_compressed.pdf | 16 Apr 2025 |
| Certificates of CA (Form 3)File: Revised CA _K B Rohmare_Dec 24.pdf | 20 Mar 2025 |
| Certificates of CA (Form 3)File: Revised CA _K B Rohmare_Dec 24_Signed.pdf | 20 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Plinth Intimation Speed Post Received copy with Tracking details.pdf | 18 Mar 2025 |
| Declaration about Commencement CertificateFile: Form D-On Letter Head.pdf | 18 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate FY22.pdf | 18 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate FY23.pdf | 18 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate FY24.pdf | 18 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-Dec-24.pdf | 29 Jan 2025 |
| Certificates of CA (Form 3)File: CA Certificate-Dec-24.pdf | 29 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate-Dec-24.pdf | 29 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf | 29 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf | 11 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Audit Report 23-24 KB Rohmare final.pdf | 30 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 Architect Certificate_Oct 2024.pdf | 29 Oct 2024 |
| Certificates of CA (Form 3)File: CA Cert_Manomaya_ Sept 24.pdf | 29 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 MANOMAY NATURE'S PARADIZE-Cert-12_SD.pdf | 29 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - K B Rohamare Housing Pvt Ltd.pdf | 14 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 Architect Certificate_June 2024 sign.pdf | 9 Oct 2024 |
| Certificates of CA (Form 3)File: CA Cert June 24 final signed copy.pdf | 9 Oct 2024 |
| Certificates of CA (Form 3)File: CA Cert June 24 final signed copy.pdf | 9 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_June 2024 sign.pdf | 9 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Dec 23 Final.pdf | 30 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-March 24 Sign Copy F.pdf | 30 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate-Dec 2023 Final.pdf | 30 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate-March 24 Sign Copy F.pdf | 30 Apr 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 169 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MANOMAY NATURES PARADIZE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PIMPRISODDIN4,100+ in Nashik
Rosewood - I J and K Wing
Ishanya Buildcon
ANANDVANN PHASE II
ANAND KHATTAR
INDO ASIAN SIGNATURE
INDO ASIAN BUILDCON PRIVATE LIMITED
Rosewood G - A Wing & Rosewood H - B Wing
Ishanya Buildcon
WESTERN HILLS
RAWAT & KAKKAR DEVELOPERS
S.No. 397-1
Ajinkya Ravindra Pawar
See every Nashik project, with the district possession charts
Builder: K. B. ROHAMARE HOUSING PVT. LTD.
K. B. ROHAMARE HOUSING PVT. LTD. has 1 registration on MahaRERA, including MANOMAY NATURES PARADIZE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if MANOMAY NATURES PARADIZE is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MANOMAY NATURES PARADIZE?
The registered promoter entity is K. B. ROHAMARE HOUSING PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MANOMAY NATURES PARADIZE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MANOMAY NATURES PARADIZE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MANOMAY NATURES PARADIZE?
The professionals named in the filing: Architect: DHIRAJ WALUNJ; Engineer: AMIT MADHUKAR SANAP; Engineer: Babasaheb Sampat Thorat; Chartered Accountant: RSPH & Associates; Chartered Accountant: CA Suchita Rakesh Pawar; Chartered Accountant: CA Pratik D Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MANOMAY NATURES PARADIZE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback