Home / Browse projects / Nashik, Maharashtra / ANANDVANN PHASE II

Registered No litigation declared Residential / Group Housing project

ANANDVANN PHASE II

By ANAND KHATTAR

RG-MH-13235 · RERA P51600023766 · Last updated on MahaRERA portal: 11 Jul 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 21 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
8 of 44Construction stages doneacross 4 buildings; furthest along: Basement (if any), 30%
102 of 116Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 171 documents Report an error

ANANDVANN PHASE II is a Residential / Group Housing project by ANAND KHATTAR in Nashik, Maharashtra, registered with MahaRERA as P51600023766 on 3 Jan 2020. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 21 months from the original filing. 14 of the 116 units on this registration are recorded sold or booked, and 8 of 44 construction stages are filed complete.

At a glance

Project

  • NameANANDVANN PHASE II
  • TypeResidential / Group Housing
  • Location
    • MUMBAI NASHIK MAHAMARG
    • GONDE PHATA
    • Gondedumala
    • Igatpuri
    • Nashik
    • 422403
  • Pincode422403
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600023766
  • ReraGenie IDRG-MH-13235

Builder

  • NameANAND KHATTAR
  • Entity typeIndividual
  • Declared earlier projects1 →

Key dates

1 months past promisethis monthRegisteredJan 2020First promiseDec 2024Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jan 2020
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 30 Dec 2024)
  • Buildings4 building records
  • Documents filed171 files

Current status

12%14 of 116 units booked
83.7%Work done, per cost certificate

Figures as on 11 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GNA60000
HNA60000
INA6578078
JNA6538038

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 11 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Basement (if any), at 30%.

G0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
H0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
I15%
ActivityProgress
Excavation100%
Basement (if any)30%
Podiums (if any)0%
Plinth30%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
J64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Closed/Covered6
BuildingClosed/CoveredTotal
G11
H11
I11
J33

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,470 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Feb 2026

Approvals and building plan

Sanctioning authorityNashik Metropolitan Region Development Authority
Permissible FSI10491.55
Proposed, not sanctioned5,218 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchINDIRA NAGAR
Estimated costRs 2.62 cr
Cost incurredRs 2.19 cr
Work done83.69%
BuildingWingEstimatedIncurred
JNARs 2.15 crRs 2.15 cr
-NARs 46.96 lakhRs 4.23 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTHE TRADITIONALS
ArchitectRegal Town Planners Pvt. Ltd.
EngineerAALYA ENGINEERING PROJECT PRIVATE LTD
EngineerSidra Engineering Services
Chartered AccountantSHIROMANY TYAGI & CO
Chartered AccountantRSPH & Associates
Chartered AccountantP N Sabadra and Associates
Chartered AccountantSHIROMANY TYAGI &CO.CHARTERED ACCOUNTANTS
PartnerRole in project
ANAND KHATTAR-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA03062621220Dec 2024 → Sep 2026

Reason as filed by the promoter1.We have obtained full occupancy certificate from Nashik Metropolitan Region Development Authority dated 17/11/2023 for building/Tower J. 2.We have to apply for Application for Correction to remove Building/Tower G, H, I which are not related to project “Anandvann Phase II,” and then need to go for Completion Update. Therefore, we are applying for Extension in Project Completion date till 30/09/2026. 3.The photos of present status of project are enclosed herewith

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Dec 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Dec 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Dec 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Dec 2024

Documents filed171

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 171 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: AR.pdf11 Jul 2026
Form 2File: ER.pdf11 Jul 2026
Form 3File: CA.pdf11 Jul 2026
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf11 Jul 2026
Form 1File: sep 24-min_.pdf11 Jul 2026
Form 2File: ER.pdf11 Jul 2026
Form 3File: Revised CA cert - Tower J 17 Nov 23-.pdf11 Jul 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - 17 Nov 23.pdf11 Jul 2026
Withdrawal Update Form 1File: dec 23-min_.pdf11 Jul 2026
Withdrawal Update Form 1File: dec 23-min_.pdf11 Jul 2026
Withdrawal Update Form 1File: dec 23-min_.pdf11 Jul 2026
Withdrawal Update Form 1File: dec 23-min_.pdf11 Jul 2026
Withdrawal Update Form 1File: dec 23-min_.pdf11 Jul 2026
Withdrawal Update Form 2File: ER.pdf11 Jul 2026
Withdrawal Update Form 2File: ER.pdf11 Jul 2026
Withdrawal Update Form 2File: ER.pdf11 Jul 2026
Withdrawal Update Form 2File: ER.pdf11 Jul 2026
Withdrawal Update Form 2File: ER.pdf11 Jul 2026
Withdrawal Update Form 3File: Revised CA cert - Tower J 17 Nov 23-.pdf11 Jul 2026
Withdrawal Update Form 3File: Revised CA cert - Tower J 17 Nov 23-.pdf11 Jul 2026
Withdrawal Update Form 3File: Revised CA cert - Tower J 17 Nov 23-.pdf11 Jul 2026
Withdrawal Update Form 3File: Revised CA cert - Tower J 17 Nov 23-.pdf11 Jul 2026
Withdrawal Update Form 3File: Revised CA cert - Tower J 17 Nov 23-.pdf11 Jul 2026
Form 2A (FY 2025-2026)File: Form-2A -March-2026.pdf11 Jul 2026
Form 5 (FY 2020-2021)File: Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf11 Jul 2026
Form 5 (FY 2021-2022)File: Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf11 Jul 2026
Form 5 (FY 2019-2020)File: RA Auditr Report-2019-20.pdf11 Jul 2026
Form 5 (FY 2024-2025)File: Form 5 -Final.pdf11 Jul 2026
Form 5 (FY 2025-2026)File: Form 5 -Final.pdf11 Jul 2026
Form 2A (FY 2024-2025)File: Form 2A - March 25 .pdf5 Jun 2026
Form 2A (FY 2022-2023)File: Form 2 A - March 23 .pdf5 Jun 2026
Form 2A (FY 2019-2020)File: Form 2A - March 20 .pdf5 Jun 2026
Form 2A (FY 2020-2021)File: Form 2A - March 21 .pdf5 Jun 2026
Form 2A (FY 2021-2022)File: Form 2A - March 22 .pdf5 Jun 2026
Form 2A (FY 2023-2024)File: Form 2A - March 24 .pdf5 Jun 2026
Form 5 (FY 2023-2024)File: Form 5 -Final.pdf5 Jun 2026
Form 5 (FY 2022-2023)File: Form 5 - Final.pdf5 Jun 2026
Self-declaration of Quarterly ProgressFile: Revised - Declaration Tower J.pdf6 Mar 2026
Form 1File: AR.pdf6 Mar 2026
Form 2File: ER.pdf6 Mar 2026
Form 3File: CA.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Sept - 24.pdf6 Mar 2026
Form 1File: AR sep 24_compressed.pdf3 Feb 2026
Form 2File: ER Cert SEP-24_compressed.pdf3 Feb 2026
Form 3File: CA cert Sep-2024-min.pdf3 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Sept - 24.pdf3 Feb 2026
Form 1File: AR June 24.pdf3 Feb 2026
Form 2File: ER June 24.pdf3 Feb 2026
Form 3File: CA June-2024-min.pdf3 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - June 24.pdf3 Feb 2026
Form 1File: AR march 24.pdf3 Feb 2026
Form 2File: ER MAR-24.pdf3 Feb 2026
Form 3File: CA March-2024-min.pdf3 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure March -24.pdf3 Feb 2026
Form 1File: AR Dec 23.pdf3 Feb 2026
Form 2File: ER DEC-23.pdf3 Feb 2026
Form 3File: CA Dec-2023-min.pdf3 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - Dec 23.pdf3 Feb 2026
Form 1File: AR sep 23.pdf3 Feb 2026
Form 2File: ER SEP-23.pdf3 Feb 2026
Form 3File: CA Sep-2023-min.pdf3 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Sert 23.pdf3 Feb 2026
Form 1File: AR june 23.pdf3 Feb 2026
Form 2File: ER JUN-23.pdf3 Feb 2026
Form 3File: CA June-2023-min.pdf3 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - June 23.pdf3 Feb 2026
Form 1File: Ar march 23.pdf3 Feb 2026
Form 2File: ER MAR-23.pdf3 Feb 2026
Form 3File: CA March-2023-min.pdf3 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - March 23.pdf3 Feb 2026
Form 1File: Ar Sep 22.pdf3 Feb 2026
Form 2File: ER SEP-22.pdf3 Feb 2026
Form 3File: CA Sep-2022-min.pdf3 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - sept 22.pdf3 Feb 2026
Form 1File: AR june 22.pdf3 Feb 2026
Form 2File: ER JUN-22.pdf3 Feb 2026
Form 3File: CA June-2022-min.pdf3 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - June 22.pdf3 Feb 2026
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2 A March -21.pdf7 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure March - 21.pdf7 Apr 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ANANDVANN PHASE 1ANANDVANN MUMBAI AGRA HIGHWAY GONDE MIDC TALUKA IGATPURI280CompletedDec 2019Dec 2019

How this compares with Nashik

12%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 21 months
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANANDVANN PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GONDE PHATA4,100+ in Nashik

2 kmANANDVANN PHASE IICompleted 1Lapsed / revoked 1Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: ANAND KHATTAR

ANAND KHATTAR has 1 registration on MahaRERA, including ANANDVANN PHASE II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if ANANDVANN PHASE II is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANANDVANN PHASE II?

The registered promoter entity is ANAND KHATTAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANANDVANN PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ANANDVANN PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANANDVANN PHASE II?

The professionals named in the filing: Architect: THE TRADITIONALS; Architect: Regal Town Planners Pvt. Ltd.; Engineer: AALYA ENGINEERING PROJECT PRIVATE LTD; Engineer: Sidra Engineering Services; Chartered Accountant: SHIROMANY TYAGI & CO; Chartered Accountant: RSPH & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANANDVANN PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANANDVANN PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANANDVANN PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.