ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / Manjusha Bliss

Completed No litigation declared Residential / Group Housing project

Manjusha Bliss

By Subhash Motiram Kasulkar

RG-MH-04031 · RERA P50500033956 · Last updated on MahaRERA portal: 5 Mar 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
8 of 32Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

Manjusha Bliss is a Residential / Group Housing project by Subhash Motiram Kasulkar in Nagpur, Maharashtra, registered with MahaRERA as P50500033956 on 14 Mar 2022. The registration is recorded completed; possession was promised by 31 Mar 2027. 24 of the 32 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameManjusha Bliss
  • TypeResidential / Group Housing
  • Location
    • Rahi Colony
    • Jaitala
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440036
  • Pincode440036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500033956
  • ReraGenie IDRG-MH-04031

Builder

  • NameSubhash Motiram Kasulkar
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed3 of 3
  • Declared earlier projects2 →

Key dates

this monthRegisteredMar 2022PromisedMar 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Mar 2022
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed83 files

Current status

75%24 of 32 units booked
89.4%Work done, per cost certificate

Figures as on 5 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Manjusha BlissNA5432032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Manjusha Bliss: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 5 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area974 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Sep 2025

Approvals and building plan

Sanctioning authorityNagpur Improvement Trust
Permissible FSI1657.22
Proposed, not sanctioned1,657 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRing Road Pratap Nagar, Nagpur
Estimated costRs 41.06 cr
Cost incurredRs 36.71 cr
Work done89.41%
BuildingWingEstimatedIncurred
Manjusha BlissNARs 20.53 crRs 18.36 cr
-NARs 20.53 crRs 18.36 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPankaj Chinchamalatpure
EngineerShubham Kasulkar
EngineerVijay Vishwakarma
Chartered AccountantAnand Daga
Chartered AccountantRishi Lashkare
Chartered AccountantRavindra Lashkare
PartnerRole in project
Subhash Motiram Kasulkar-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC_merged.pdf5 Mar 2026
Withdrawal Update Form 1File: Manjusha Bliss - Form 1 - Dec 25.pdf24 Feb 2026
Withdrawal Update Form 2File: Manjusha Bliss - Form 2 - Dec 25.pdf24 Feb 2026
Withdrawal Update Form 3File: Manjusha Bliss - Form 3 - Dec 25.pdf24 Feb 2026
Withdrawal Update Form 1File: Manjusha Bliss - Form 1 - September 2025.pdf15 Dec 2025
Withdrawal Update Form 2File: Manjusha Bliss - Form 2 - September 2025.pdf15 Dec 2025
Withdrawal Update Form 3File: Manjusha Bliss - Form 3 - September 2025.pdf15 Dec 2025
Form 2A (FY 2021-2022)File: 2021-22.pdf11 Nov 2025
Form 2A (FY 2022-2023)File: 2022-23.pdf11 Nov 2025
Form 2A (FY 2023-2024)File: 2023-24.pdf11 Nov 2025
Form 2A (FY 2024-2025)File: 2024-25.pdf11 Nov 2025
Withdrawal Update Form 1File: Manjusha Bliss - Form 1 - June 2025.pdf16 Sep 2025
Withdrawal Update Form 2File: Manjusha Bliss - Form 2 - June 2025.pdf16 Sep 2025
Withdrawal Update Form 3File: Manjusha Bliss - Form 3 - June 2025.pdf16 Sep 2025
Form 5 (FY 2021-2022)File: Manjusha Bliss - Form 5 - 2022.pdf9 Sep 2025
Form 5 (FY 2022-2023)File: Manjusha Bliss - Form 5 - 2022-23.pdf9 Sep 2025
Form 5 (FY 2023-2024)File: Manjusha Bliss - Form 5 - 2023-24.pdf9 Sep 2025
Form 5 (FY 2024-2025)File: Manjusha Bliss - Form 5 - 2024-25.pdf9 Sep 2025
Form 1File: Manjusha Bliss - Form 1 - September 2023.pdf8 Sep 2025
Form 2File: Manjusha Bliss - Form 2 - September 2023.pdf8 Sep 2025
Form 3File: Manjusha Bliss - Form 3 - September 2023.pdf8 Sep 2025
Disclosure of Sold and Booked InventoryFile: Manjusha Bliss - Disclosure - September 2023.pdf8 Sep 2025
Form 1File: Manjusha Bliss - Form 1 - December 2023.pdf8 Sep 2025
Form 2File: Manjusha Bliss - Form 2 - December 2023.pdf8 Sep 2025
Form 3File: Manjusha Bliss - Form 3 - December 2023.pdf8 Sep 2025
Disclosure of Sold and Booked InventoryFile: Manjusha Bliss - Disclosure - December 2023.pdf8 Sep 2025
Form 1File: Manjusha Bliss - Form 1 - March 2024.pdf8 Sep 2025
Form 2File: Manjusha Bliss - Form 2 - March 2024.pdf8 Sep 2025
Form 3File: Manjusha Bliss - Form 3 - March 2024.pdf8 Sep 2025
Disclosure of Sold and Booked InventoryFile: Manjusha Bliss - Disclosure - March 2024.pdf8 Sep 2025
Form 1File: Manjusha Bliss - Form 1 - June 2024.pdf8 Sep 2025
Form 2File: Manjusha Bliss - Form 2 - June 2024.pdf8 Sep 2025
Form 3File: Manjusha Bliss - Form 3 - June 2024.pdf8 Sep 2025
Disclosure of Sold and Booked InventoryFile: Manjusha Bliss - Disclosure - June 2024.pdf8 Sep 2025
Form 1File: Manjusha Bliss - Form 1 - September 2024.pdf8 Sep 2025
Form 2File: Manjusha Bliss - Form 2 - September 2024.pdf8 Sep 2025
Form 3File: Manjusha Bliss - Form 3 - September 2024.pdf8 Sep 2025
Disclosure of Sold and Booked InventoryFile: Manjusha Bliss - Disclosure - September 2024.pdf8 Sep 2025
Form 1File: Manjusha Bliss - Form 1 - December 2024.pdf8 Sep 2025
Form 2File: Manjusha Bliss - Form 2 - December 2024.pdf8 Sep 2025
Form 3File: Manjusha Bliss - Form 3 - December 2024.pdf8 Sep 2025
Disclosure of Sold and Booked InventoryFile: Manjusha Bliss - Disclosure - December 2024.pdf8 Sep 2025
Form 1File: Manjusha Bliss - Form 1 - March 2025.pdf8 Sep 2025
Form 2File: Manjusha Bliss - Form 2 - March 2025.pdf8 Sep 2025
Form 3File: Manjusha Bliss - Form 3 - March 2025.pdf8 Sep 2025
Disclosure of Sold and Booked InventoryFile: Manjusha Bliss - Disclosure - March 2025.pdf8 Sep 2025
Form 1File: Manjusha Bliss - Form 1 - March 2022.pdf6 Sep 2025
Form 2File: Manjusha Bliss - Form 2 - March 2022.pdf6 Sep 2025
Form 3File: Manjusha Bliss - Form 3 - March 2022_compressed.pdf6 Sep 2025
Disclosure of Sold and Booked InventoryFile: Manjusha Bliss - Disclosure - March 2022.pdf6 Sep 2025
Form 1File: Manjusha Bliss - Form 1 - June 2022.pdf6 Sep 2025
Form 2File: Manjusha Bliss - Form 2 - June 2022.pdf6 Sep 2025
Form 3File: Manjusha Bliss - Form 3 - June 2022_compressed.pdf6 Sep 2025
Disclosure of Sold and Booked InventoryFile: Manjusha Bliss - Disclosure - June 2022.pdf6 Sep 2025
Form 1File: Manjusha Bliss - Form 1 - September 2022.pdf6 Sep 2025
Form 2File: Manjusha Bliss - Form 2 - September 2022.pdf6 Sep 2025
Form 3File: Manjusha Bliss - Form 3 - September 2022_compressed.pdf6 Sep 2025
Disclosure of Sold and Booked InventoryFile: Manjusha Bliss - Disclosure - September 2022.pdf6 Sep 2025
Form 1File: Manjusha Bliss - Form 1 - December 2022.pdf6 Sep 2025
Form 2File: Manjusha Bliss - Form 2 - December 2022.pdf6 Sep 2025
Form 3File: Manjusha Bliss - Form 3 - December 2022_compressed.pdf6 Sep 2025
Disclosure of Sold and Booked InventoryFile: Manjusha Bliss - Disclosure - December 2022.pdf6 Sep 2025
Form 1File: Manjusha Bliss - Form 1 - March 2023.pdf6 Sep 2025
Form 2File: Manjusha Bliss - Form 2 - March 2023.pdf6 Sep 2025
Form 3File: Manjusha Bliss - Form 3 - March 2023_compressed.pdf6 Sep 2025
Disclosure of Sold and Booked InventoryFile: Manjusha Bliss - Disclosure - March 2023.pdf6 Sep 2025
Form 1File: Manjusha Bliss - Form 1 - June 2023.pdf6 Sep 2025
Form 2File: Manjusha Bliss - Form 2 - June 2023.pdf6 Sep 2025
Form 3File: Manjusha Bliss - Form 3 - June 2023_compressed.pdf6 Sep 2025
Disclosure of Sold and Booked InventoryFile: Manjusha Bliss - Disclosure - June 2023.pdf6 Sep 2025
Proforma of Allotment letterFile: combinepdf.pdf26 Feb 2022
Copy of the legal title reportFile: Legal Title Report (Bliss) (Compressed).pdf22 Feb 2022
Details of encumbrancesFile: Encumbrance Certificate (Bliss).pdf22 Feb 2022
Declaration about Commencement CertificateFile: Decleration Of Commencement- Signed.pdf22 Feb 2022
Declaration in FORM BFile: Form B (Bliss) (Compressed).pdf22 Feb 2022
CERSAI detailsFile: CERSAI Search Report.pdf22 Feb 2022
Building plan approvalFile: Sanctioned Maps Of Manjusha Bliss_compressed.pdf21 Feb 2022
Layout approvalFile: Sanctioned Maps Of Manjusha Bliss_compressed.pdf21 Feb 2022
PAN CardFile: PAN Card of Subhash Kasulkar.pdf21 Feb 2022
Copy of Layout Approval (in case of layout)File: Sanctioned Maps Of Manjusha Bliss_compressed.pdf21 Feb 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Manjusha BlossomPlot No 11 12 13 14 Survey No 295-1 299 Mouza Wanadongri Tahsil Hingna District Nagpur20CompletedJul 2017Jul 2017
Shubham HeightPlot No 502-62 Rajendra Nagar Hingna Road Nagpur Mouza Jaitala6CompletedJul 2014Jul 2014

How this compares with Nagpur

75%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Manjusha Bliss on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Jaitala2,800+ in Nagpur

2 kmManjusha BlissCompleted 15Lapsed / revoked 6Other 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 39 registered projects within 2 km.

Builder: Subhash Motiram Kasulkar

Subhash Motiram Kasulkar has 3 registrations on MahaRERA, including Manjusha Regalia and Manjusha Aura. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Manjusha Bliss is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Manjusha Bliss?

The registered promoter entity is Subhash Motiram Kasulkar, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Manjusha Bliss?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Manjusha Bliss?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Manjusha Bliss?

The professionals named in the filing: Architect: Pankaj Chinchamalatpure; Engineer: Shubham Kasulkar; Engineer: Vijay Vishwakarma; Chartered Accountant: Anand Daga; Chartered Accountant: Rishi Lashkare; Chartered Accountant: Ravindra Lashkare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Manjusha Bliss?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Manjusha Bliss. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Manjusha Bliss to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.