Manisha Paradise
By Pruthvi Builders & Developers
RG-MH-12261 · RERA P51800009761 · Last updated on MahaRERA portal: 23 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Manisha Paradise is a Others project by Pruthvi Builders & Developers in Raigarh, Maharashtra, registered with MahaRERA as P51800009761 on 22 Aug 2017. Possession is promised by 30 Dec 2026. 45 of the 91 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameManisha Paradise
- TypeOthers
- Location
- PLOT NO 52
- ROAD PALI
- Kalamboli
- Panvel
- Raigarh
- 410218
- Pincode410218
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800009761
- ReraGenie IDRG-MH-12261
Builder
- NamePruthvi Builders & Developers
- Entity typePartnership
- PartnersGoodworth Techno Realty Pvt Ltd Pvt Ltd, Jayesh Valji Gothi
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Aug 2017
- Promised completion30 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed90 files
Current status
Figures as on 23 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Manisha Paradise | NA | 19 | 19 | 69 | 22 | 91 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 80%.
Manisha Paradise: 98% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed79
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Manisha Paradise | NA | Rs 24.17 cr | Rs 24.17 cr |
| - | NA | Rs 1.01 cr | Rs 93.68 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Satish Ahuja and associates AHUJA |
| Engineer | Samarth Agarwal |
| Chartered Accountant | SUNIL GUJAR |
| Chartered Accountant | VIRAL MEHTA AND CO |
| Chartered Accountant | UJJAM PATEL |
| Partner | Role in project |
|---|---|
| Pruthvi Builders & Developers | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000251525 | Rohan Subhash Shinde | Jayesh Valji Gothi | 21/12/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2026
Documents filed90
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: form 1 march 2026.pdf | 23 Jun 2026 |
| Withdrawal Update Form 1File: form 1 march 2026.pdf | 23 Jun 2026 |
| Withdrawal Update Form 2File: Manisha Paradise EC 31-03-26.pdf | 23 Jun 2026 |
| Withdrawal Update Form 2File: Manisha Paradise EC 31-03-26.pdf | 23 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 - 2025-26 JAN 2026 TO MAR 2026_compressed.pdf | 23 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 - 2025-26 JAN 2026 TO MAR 2026_compressed.pdf | 23 Jun 2026 |
| Withdrawal Update Form 1File: form 1 march 2026.pdf | 19 Jun 2026 |
| Withdrawal Update Form 1File: form 1 march 2026.pdf | 19 Jun 2026 |
| Withdrawal Update Form 1File: form 1 march 2026.pdf | 19 Jun 2026 |
| Withdrawal Update Form 1File: form 1 march 2026.pdf | 19 Jun 2026 |
| Withdrawal Update Form 1File: form 1 march 2026.pdf | 19 Jun 2026 |
| Withdrawal Update Form 2File: Manisha Paradise EC 30-06-25.pdf | 19 Jun 2026 |
| Withdrawal Update Form 2File: Manisha Paradise EC 30-09-25.pdf | 19 Jun 2026 |
| Withdrawal Update Form 2File: Manisha Paradise EC 30-09-25.pdf | 19 Jun 2026 |
| Withdrawal Update Form 2File: Manisha Paradise EC 30-09-25.pdf | 19 Jun 2026 |
| Withdrawal Update Form 2File: Manisha Paradise EC 30-09-25.pdf | 19 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 - 2025-26 - APRIL 25 TO JUNE 25_compressed.pdf | 19 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 - 2025-26 - JULY 25 TO SEPT 25_compressed.pdf | 19 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 - 2025-26 - JULY 25 TO SEPT 25_compressed.pdf | 19 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 - 2025-26 - JULY 25 TO SEPT 25_compressed.pdf | 19 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 - 2025-26 - OCT 2025 TO DEC 2025_compressed.pdf | 19 Jun 2026 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7) 207-3-ULWE RERA (2024 DECEMBER).pdf | 20 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Bay View Ulwe --- EC 31-12-24 (1).pdf | 20 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 - 2022-23.pdf | 20 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - 2023-24.pdf | 20 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 01 RERA CERTIFICATE 30092023.pdf | 17 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 01 RERA CERTIFICATE 31122023.pdf | 17 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 01 RERA CERTIFICATE 31032024.pdf | 17 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 01 RERA CERTIFICATE 30062024.pdf | 17 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 01 RERA CERTIFICATE 30092024.pdf | 17 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1] FORM 01 RERA CERTIFICATE 30062023.pdf | 17 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3 - 2024-25 - APRIL 24 TO JUNE 24.pdf | 17 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3 - 2024-25 - JULY 24 TO SEPT 24.pdf | 17 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3 - 2023-24 - JAN 24 TO MARCH 24.pdf | 17 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3 - 2023-24 - OCT 23 TO DEC 23.pdf | 17 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3 - 2023-24 - JULY 23 TO SEPT 23.pdf | 17 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3 - 2022-23 - JAN 23 TO MARCH 23.pdf | 17 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3 - 2022-23 - OCT 22 TO DEC 22.pdf | 17 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3 - 2022-23 - JULY 22 TO SEPT 22.pdf | 17 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3 - 2022-23 - APRIL 22 TO JUNE 22.pdf | 17 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3 - 2023-24 - APRIL 23 TO JUNE 23.pdf | 17 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 March 2023.pdf | 17 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Manisha Paradise EC 30092024.pdf | 17 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Manisha Paradise EC 30062024.pdf | 17 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Manisha Paradise EC 31032024.pdf | 17 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Manisha Paradise EC 31122023.pdf | 17 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Manisha Paradise EC 30092023.pdf | 17 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Manisha Paradise EC 30062023.pdf | 17 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 March 2022.pdf | 17 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 March 2021.pdf | 17 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 March 2020.pdf | 17 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 March 2019.pdf | 17 Jan 2025 |
| Certificates of CA (Form 3)File: RERA FORM 3 2019.pdf | 27 May 2023 |
| Certificates of CA (Form 3)File: RERA FORM 3 2020.pdf | 27 May 2023 |
| Certificates of CA (Form 3)File: RERA FORM 3 2021.pdf | 27 May 2023 |
| Certificates of CA (Form 3)File: RERA FORM 3 2022.pdf | 27 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA FORM - 5 - 2022.pdf | 26 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA 1 FORM 2018.pdf | 20 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA 1 FORM 2019.pdf | 20 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA 1 FORM 2020.pdf | 20 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA 1 FORM 2021.pdf | 20 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA 1 FORM 2022.pdf | 20 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA 1 FORM 2023.pdf | 20 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 March 2018.pdf | 20 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form - 2 March 2020.pdf | 20 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form - 2 March 2021.pdf | 20 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form - 2 March 2022.pdf | 20 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: RERA FROM - 5 - 2018.pdf | 20 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: RERA FORM - 5 - 2019.pdf | 20 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA FORM - 5 - 2020.pdf | 20 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RERA FORM - 5- 2021.pdf | 20 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC part I.pdf | 9 Apr 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: CC part II.pdf | 9 Apr 2018 |
| Building plan approvalFile: CC 57.pdf | 29 Jul 2017 |
| Building plan approvalFile: CC 14.pdf | 29 Jul 2017 |
| Layout approvalFile: Plan R.pdf | 29 Jul 2017 |
| Copy of the legal title reportFile: Seach Report.pdf | 29 Jul 2017 |
| Copy of the legal title reportFile: Title Clearance 1.pdf | 29 Jul 2017 |
| Copy of the legal title reportFile: Title Clearance 2.pdf | 29 Jul 2017 |
| Details of encumbrancesFile: Encumbrance Certificate.pdf | 29 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 90 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Manisha Paradise on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ROAD PALI5,900+ in Raigarh
Plot No -77 Sector -17 Kalamboli Bus Depot
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
BHAVESHWAR AQUA - 1
BHAVESHWAR INFRATECH
ETERNIA
GREENSCAPE DEVELOPERS PRIVATE LIMITED
MONARCH BROOKEFIELDS
MONARCH BROOKEFIELDS LLP
BHAVESHWAR AQUA - 2
BHAVESHWAR INFRATECH
OM REGENCY
OSCAR INFRASTRUCTURE PRIVATE LIMITED
See every Raigarh project, with the district possession charts
Builder: Pruthvi Builders & Developers
Pruthvi Builders & Developers has 1 registration on MahaRERA, including Manisha Paradise. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Manisha Paradise is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Manisha Paradise?
The registered promoter entity is Pruthvi Builders & Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Manisha Paradise?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Manisha Paradise?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Manisha Paradise?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Manisha Paradise?
The professionals named in the filing: Architect: Satish Ahuja and associates AHUJA; Engineer: Samarth Agarwal; Chartered Accountant: SUNIL GUJAR; Chartered Accountant: VIRAL MEHTA AND CO; Chartered Accountant: UJJAM PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Manisha Paradise?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback