Home / Browse projects / Nagpur, Maharashtra / MANGALMURTI RESIDENCY
MANGALMURTI RESIDENCY
RG-MH-12635 · RERA P50500045698 · Last updated on MahaRERA portal: 1 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 15.00 crore secured on the land, in favour of STATE BANK OF INDIA
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MANGALMURTI RESIDENCY is a Others project by DEVPRATH CONSTRUCTIONS LLP in Nagpur, Maharashtra, registered with MahaRERA as P50500045698 on 6 Jun 2022. Possession is promised by 31 May 2027. 138 of the 232 units on this registration are recorded sold or booked, and 20 of 33 construction stages are filed complete.
At a glance
Project
- NameMANGALMURTI RESIDENCY
- TypeOthers
- Location
- KH NO 94/2
- PLOT NO 365/2
- MOUZA-PARSODI
- NGP(RURAL)
- MOUZA- PARSODI
- Parsodi (535883)
- Nagpur (Rural)
- Nagpur
- 441108
- Pincode441108
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500045698
- ReraGenie IDRG-MH-12635
Builder
- NameDEVPRATH CONSTRUCTIONS LLP
- Entity typeOthers
- Named personsHEMAL HARIKISHAN NADIYANA, SUNIL NAROTTAM PATIL
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on6 Jun 2022
- Promised completion31 May 2027
- Revised completionNone
- Buildings3 building records
- Documents filed136 files
Current status
Figures as on 1 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 2 | 2 | 0 | 64 | 64 |
| B WING | NA | 13 | 12 | 88 | 0 | 88 |
| C WING | NA | 12 | 11 | 80 | 0 | 80 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 1 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 90%.
A WING82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B WING82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 65% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
C WING47%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 30% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 25% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities17
As on 1 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 95% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 35% |
| Community Buildings | Yes | 75% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 10% |
| Electrical meter room, sub-station, receiving station | Yes | 60% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| SWIMMING POOL | Yes | 0% |
| GYMNASIUM | Yes | 0% |
Parking filed5
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A WING | 0 | 1 | 1 |
| B WING | 1 | 1 | 2 |
| C WING | 1 | 1 | 2 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MILIND NADIYANA & ASSOCIATES |
| Engineer | SWAPNIL BELEKAR |
| Engineer | KASHAB BANSOD |
| Chartered Accountant | KUMAR & JAYAKRISHNAN |
| Chartered Accountant | K B C S & CO. |
| Partner | Role in project |
|---|---|
| DEVPRATH CONSTRUCTIONS LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 May 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 May 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 May 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 May 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 10 Jul 2024
Documents filed136
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 136 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 Architect Certificate March 2026.pdf | 1 May 2026 |
| Form 2File: Form 2 Engineer Certificate March 2026.pdf | 1 May 2026 |
| Form 3File: Form 3 CA Certificate March 2026.pdf | 1 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory March 2026.pdf | 1 May 2026 |
| Form 1File: Form 1 Architect certificate Dec 25.pdf | 26 Feb 2026 |
| Form 2File: Form 2 Engineer Certificate Dec 25.pdf | 26 Feb 2026 |
| Form 3File: Form 3 CA Certificate Dec 25.pdf | 26 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory Dec 2025.pdf | 26 Feb 2026 |
| Form 1File: Form 1 Architect Certificate Sept 2025.pdf | 5 Dec 2025 |
| Form 2File: Form 2 Engineer Certificate Sept 2025.pdf | 5 Dec 2025 |
| Form 3File: Form 3 CA Certificate Sept 2025.pdf | 5 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory Sept 2025.pdf | 5 Dec 2025 |
| Form 5 (FY 2024-2025)File: form 5.pdf | 4 Oct 2025 |
| Form 2A (FY 2024-2025)File: Form 2A FY 24-25_Mangalmurti Residency.pdf | 30 Sep 2025 |
| Form 1File: Form 1 Architect Certificate.pdf | 31 Jul 2025 |
| Form 2File: Form 2 Engineer Certificate.pdf | 31 Jul 2025 |
| Form 3File: Form 3 CA Certificate.pdf | 31 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory.pdf | 31 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: DevprathConstruction Inventory Details (1).pdf | 3 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3.pdf | 1 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA DOCS FORM2 DC.pdf | 1 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA DOCS FORM2.pdf | 25 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE MARCH 25.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 - FORM 3_DC_compressed.pdf | 21 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_compressed.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: sold booked.pdf | 17 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 16 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 15 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2a.pdf | 10 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5.pdf | 10 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 7 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 7 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 7 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 __ CA Certificate_compressed.pdf | 23 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineers Certificate_compressed.pdf | 22 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf | 22 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_compressed.pdf | 10 Jul 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: part oc.pdf | 10 Jul 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: plan.pdf | 10 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf | 30 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 30 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf | 30 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 30 Apr 2024 |
| Declaration about Commencement CertificateFile: 4 Form D Devang - Dec 23.pdf | 22 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Devang - Dec 23.pdf | 22 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf | 15 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold Invetory.pdf | 15 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 15 Mar 2024 |
| Declaration about Commencement CertificateFile: 4 Form D.pdf | 4 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 Archirtects Certificate.pdf | 4 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 Engg Certificaxte.pdf | 4 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: 5 Sold unsold.pdf | 4 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate Q2.pdf | 4 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf | 14 Sep 2023 |
| Declaration about Commencement CertificateFile: Commencement Certificate.pdf | 13 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate - Q1 - FY 23-24_compressed (1).pdf | 13 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 13 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A.pdf | 13 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsol Inventory_compressed (1).pdf | 13 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certficate - fORM 3_compressed.pdf | 13 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 2A.pdf | 13 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: GetUserDocumentFileContent (31).pdf | 13 Sep 2023 |
| Declaration about Commencement CertificateFile: form d.pdf | 12 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 12 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf | 12 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 11 May 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold inventory.pdf | 11 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 11 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5.pdf | 11 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FOR M 5 - Scrutiny chek by CA.pdf | 17 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: rera bank change declaraion update.pdf | 28 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 24 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_compressed.pdf | 11 Nov 2022 |
| Declaration about Commencement CertificateFile: FORM D.pdf | 7 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 7 Nov 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf | 7 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Summary.pdf | 7 Nov 2022 |
| Declaration in FORM BFile: form b.pdf | 24 May 2022 |
| Layout approvalFile: MAP 1.pdf | 20 May 2022 |
| Layout approvalFile: MAP 2.pdf | 20 May 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 136 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MANGALMURTI RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MOUZA- PARSODI2,800+ in Nagpur
Filed coordinates, straight-line distance. 28 registered projects within 2 km.
Kanher Nagri Developers
KANHER NAGRI DEVELOPERS
MAHALAXMI NAGAR 6
MAHALAXMI ESTATE
MAHALAXMI NAGAR 4
PADMALAXMI DEVELOPERS
Moreshwar park 4
PRASANNA PLANNERS
PRIME PLATINUM
UMAKANT VITTHAL MENDHE
MAULI NAGAR 8
MAULI INFRATECH
See every Nagpur project, with the district possession charts
Builder: DEVPRATH CONSTRUCTIONS LLP
DEVPRATH CONSTRUCTIONS LLP has 1 registration on MahaRERA, including MANGALMURTI RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if MANGALMURTI RESIDENCY is delayed beyond 31 May 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MANGALMURTI RESIDENCY?
The registered promoter entity is DEVPRATH CONSTRUCTIONS LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MANGALMURTI RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MANGALMURTI RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MANGALMURTI RESIDENCY?
The professionals named in the filing: Architect: MILIND NADIYANA & ASSOCIATES; Engineer: SWAPNIL BELEKAR; Engineer: KASHAB BANSOD; Chartered Accountant: KUMAR & JAYAKRISHNAN; Chartered Accountant: K B C S & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MANGALMURTI RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback