Home / Browse projects / Thane, Maharashtra / Mandakini Residency

Registration lapsed No litigation declared Residential / Group Housing project

Mandakini Residency

By Mandakini Realtors

RG-MH-11516 · RERA P51700006570 · Last updated on MahaRERA portal: 4 May 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 69 months past the filed date
  • 2 complaints at MahaRERA
  • Completion date moved by 25 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jan 2021Possession promised69 months past this date
18 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 90%
2Complaints at MahaRERAon this registration
Jump to the 27 documents Report an error

Mandakini Residency is a Residential / Group Housing project by Mandakini Realtors in Thane, Maharashtra, registered with MahaRERA as P51700006570 on 14 Aug 2017. Possession was promised by 31 Jan 2021 and is now 69 months past that date. The completion date has moved by 25 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameMandakini Residency
  • TypeResidential / Group Housing
  • Location
    • Ganesh mandir rd
    • Titwala
    • Kalyan
    • Thane
    • 421605
  • Pincode421605
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700006570
  • ReraGenie IDRG-MH-11516

Builder

  • NameMandakini Realtors
  • Entity typePartnership
  • Declared earlier projects1 →

Key dates

69 months past promisethis monthRegisteredAug 2017First promiseDec 2018Revised toJan 2021

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on14 Aug 2017
  • Promised completion31 Jan 2021
  • Revised completionRevised to 31 Jan 2021 (originally 31 Dec 2018)
  • Buildings2 building records
  • Documents filed27 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA40000
A2NA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 4 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 90%.

A189%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
A290%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 4 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed21

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots21
Closed/Covered21
BuildingClosed/CoveredTotal
A155
A21616

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,850 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2901.1
Proposed, not sanctioned1,580 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKhadakpada, Kalyan west

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDecon Consultants
EngineerVijay Consultants
PartnerRole in project
Mandakini Realtors-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700000031Dec 2018 → Apr 2020

Reason as filed by the promoterWe have submitted revise plan with KalyanDombivali Municipal Corporation through our architect for further using , utilising and consuming permissible Floor Space Index 1321.39square meter on the project land as per KalyanDombivali Municipal Development Control Rules. Therefore ,We have filed a civil writ petition no. 6137 of 2017 in the Bombay High Court for considering submitted revise plan and regulation of Floor Space Index 1321.39square meter on the said project land. The said writ petition is finally disposed on 07.07.2017 and The Bombay High Court is directed to regulate the said revise

EXT51700008418Dec 2018 → Jan 2021

Reason as filed by the promoterRespected Sir, we are glad to say that we have restarted our work on site for our project post relaxation given by Government of Maharashtra and have completed around 98% of the work. we will be finishing the balance work very soon and will be in a position to handover the flats to the respective customer. But to complete the remaining all things will take a little more time as due to covid-19 conditions process for OC and BCC. Hence we request you to grant us an extension of 2 more months so that we complete the project in all aspects in the stipulated time frame

EXT51700001180Dec 2018 → Apr 2020

Reason as filed by the promoterDear Sir, We have submitted revise plan with Kalyan Dombivali Municipal Corporation through our architect for further using , utilising and consuming permissible Floor Space Index 1321 square meter on the project land as per Kalyan Dombivali Municipal Development Control Rules. Therefore ,We have filed a civil writ petition no. 6137 of 2017 in the Bombay High Court for considering submitted revise plan and regulation of Floor Space Index 1321 square meter on the said project land. The said writ petition is finally disposed on 07.07.2017 and The Bombay High Court is directed to regulate the sai

Litigation declared2

CaseCourtStatus
432/2015Civil Court Junior Division kalyanArgument Ready
6137/2017Bombay High courtDisposed

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000110895Zulfikhar AhmadMandakini Realtors14/09/2019
CC006000000171484IFTIKAR AHMEDMandakini Realtors11/11/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Dec 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed27

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Sold-unsold_inventory.pdf4 May 2023
Disclosure of sold/ booked inventoryFile: sold, unsold units.pdf27 Apr 2023
Declaration in FORM BFile: Decleration.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form_2A_19-20.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form_2A_20-21.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form_2A__21-22.pdf19 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf19 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Audit Report 17.pdf19 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Audit Report 18-19.pdf19 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Audit Report 19-20.pdf19 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: MANDAKINI REALTORS ITR-20-21.pdf19 Apr 2023
Copy of the legal title reportFile: Madhukar Dorkar Title Report.pdf16 Dec 2017
Proforma of Allotment letterFile: Rfinal_EA_AGREEMENT (1).pdf16 Dec 2017
Layout approvalFile: CC.pdf30 Jul 2017
Building plan approvalFile: IOD.pdf30 Jul 2017
PAN CardFile: mandakini realtors pan card1.pdf30 Jul 2017
Copy of the legal title reportFile: Title.pdf30 Jul 2017
Details of encumbrancesFile: Indemnity Bond.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: CC.pdf30 Jul 2017
Building Plan Approval (IOD)File: IOD.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf30 Jul 2017
Declaration in FORM BFile: Declaration.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf30 Jul 2017
Certificates of CA (Form 3)File: CA Certificate.pdf30 Jul 2017
Proforma of Allotment letterFile: Allotment letter.pdf30 Jul 2017
Proforma of Allotment letterFile: Draft Agreement.pdf30 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Mukta ResidencyKhidkali.100CompletedMay 2015Late, Aug 2016

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 25 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mandakini Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Titwala7,600+ in Thane

2 kmMandakini ResidencyCompleted 32Lapsed / revoked 21Other 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 74 registered projects within 2 km.

Builder: Mandakini Realtors

Mandakini Realtors has 1 registration on MahaRERA, including Mandakini Residency. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Mandakini Residency shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Mandakini Residency is delayed beyond 31 Jan 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mandakini Residency?

The registered promoter entity is Mandakini Realtors, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mandakini Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Mandakini Residency?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Mandakini Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mandakini Residency?

The professionals named in the filing: Architect: Decon Consultants; Engineer: Vijay Consultants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mandakini Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mandakini Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mandakini Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.