ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / MAJESTIC TOWER-A

Registered No litigation declared Residential / Group Housing project

MAJESTIC TOWER-A

By PB CONSTRUCTION

RG-MH-30803 · RERA P99000079138 · Last updated on MahaRERA portal: 2 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 10Construction stages donefurthest along: Slabs of Super Structure, 96%
201 of 224Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

MAJESTIC TOWER-A is a Residential / Group Housing project by PB CONSTRUCTION in Palghar, Maharashtra, registered with MahaRERA as P99000079138 on 10 Feb 2025. Possession is promised by 31 Dec 2027. 23 of the 224 units on this registration are recorded sold or booked, and 4 of 10 construction stages are filed complete.

At a glance

Project

  • NameMAJESTIC TOWER-A
  • TypeResidential / Group Housing
  • Location
    • S T DEPO ROAD
    • OPP DMART
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401203
  • Pincode401203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000079138
  • ReraGenie IDRG-MH-30803

Builder

  • NamePB CONSTRUCTION
  • Entity typePartnership
  • Partnersvishnu pandurang patil, pramod kashinath patil
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2025PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Feb 2025
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed87 files

Current status

10%23 of 224 units booked
43.6%Work done, per cost certificate

Figures as on 2 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAJESTIC TOWER-ANA23019826224

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 10 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 96%.

MAJESTIC TOWER-A: 53% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure96%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed816

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots816
Closed/Covered630
Open Space186

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,805 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Apr 2026
LandownerVillageDistrict
VISHNU PANDURANG PATILVasai-Virar City (M Corp)Palghar
DEEPAK HARISHCHANDRA THAKURVasai-Virar City (M Corp)Palghar
KIRAN TUKARAM THAKURVasai-Virar City (M Corp)Palghar
NARAYAN PANDURNAG PATILVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVASAI VIRAR CITY MUNICIPAL CORPORATION
Permissible FSI54353.56
Proposed, not sanctioned22,140 sq m
Buildings approved2
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHREE APARTMENT, NEAR RAILWAY STATION, NALLASOPARA (W), DIST. THANE - 401 203
Estimated costRs 96.00 cr
Cost incurredRs 41.85 cr
Work done43.59%
BuildingWingEstimatedIncurred
MAJESTIC TOWER-ANARs 93.00 crRs 41.85 cr
-NARs 3.00 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJYA WADE & ASSOCIATES
EngineerAPTE ASSOCIATES
EngineerJW CONSULTANTS LLP
Chartered AccountantJ F DIAS CO
Chartered Accountantjatin narayan kamerkar
PartnerRole in project
PB CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jun 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jun 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate Sept 2025.pdf2 Jun 2026
Withdrawal Update Form 1File: Architect Certificate Dec 2025.pdf2 Jun 2026
Withdrawal Update Form 1File: Architect Certificate Dec 2025.pdf2 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate Sept 2025.pdf2 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate Dec 2025.pdf2 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate Dec 2025.pdf2 Jun 2026
Withdrawal Update Form 3File: CA Certificate Sept-2025.pdf2 Jun 2026
Withdrawal Update Form 3File: CA Certificate Dec-2025.pdf2 Jun 2026
Withdrawal Update Form 3File: CA Certificate Dec-2025.pdf2 Jun 2026
Withdrawal Update Form 1File: Architect certificate June 2025.pdf1 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate June 2025.pdf1 Jun 2026
Withdrawal Update Form 3File: CA Certificate June-2025.pdf1 Jun 2026
Withdrawal Update Form 1File: Architect Certificate Dec 2025.pdf30 May 2026
Withdrawal Update Form 2File: Engineer Certificate Dec 2025.pdf30 May 2026
Withdrawal Update Form 3File: CA Certificate Dec-2025.pdf30 May 2026
Withdrawal Update Form 1File: Architect Certificate Dec 2025.pdf28 May 2026
Withdrawal Update Form 2File: Engineer Certificate Dec 2025.pdf28 May 2026
Withdrawal Update Form 3File: CA Certificate Dec-2025.pdf28 May 2026
Withdrawal Update Form 1File: Architect Certificate Dec 2025.pdf20 May 2026
Withdrawal Update Form 2File: Engineer Certificate Dec 2025.pdf20 May 2026
Withdrawal Update Form 3File: CA Certificate Dec-2025.pdf20 May 2026
Form 2A (FY 2025-2026)File: Form-2A 2025-26.pdf20 May 2026
Form 2A (FY 2024-2025)File: Form-2A 2024-25.pdf4 Apr 2026
Form 1File: Architect Certificate March 2025.pdf3 Apr 2026
Form 2File: Engineer Certificate March 2025.pdf3 Apr 2026
Form 3File: CA RERA Certficate march 2025.pdf3 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory March 2025.pdf3 Apr 2026
Withdrawal Update Form 1File: Architect Certificate Dec 2025.pdf3 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate Dec 2025.pdf3 Apr 2026
Withdrawal Update Form 3File: CA Certificate Dec-2025.pdf3 Apr 2026
Withdrawal Update Form 1File: Architect Certificate Dec 2025.pdf2 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate Dec 2025.pdf2 Apr 2026
Withdrawal Update Form 3File: CA Certificate Dec-2025.pdf2 Apr 2026
Form 5 (FY 2024-2025)File: Form 5.pdf29 Aug 2025
Layout approvalFile: Layout Plan.pdf17 Jun 2025
Building plan approvalFile: Ground Floor.pdf17 Jun 2025
Building plan approvalFile: 1st Floor.pdf17 Jun 2025
Building plan approvalFile: 2nd Floor.pdf17 Jun 2025
Building plan approvalFile: 3rd Floor.pdf17 Jun 2025
Building plan approvalFile: Typical Floor.pdf17 Jun 2025
Building plan approvalFile: Refuge Floor.pdf17 Jun 2025
Building plan approvalFile: Section Plan.pdf17 Jun 2025
Other - LegalFile: clarification letter-merged-compressed.pdf7 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA MAJESTIC.pdf5 Feb 2025
Other - FinanceFile: Revised Declaration Deepak Thakur.pdf29 Jan 2025
Details of encumbrances concerned to FinanceFile: Financial Encumbrances.pdf15 Jan 2025
Details of encumbrances concerned to FinanceFile: legal Emcuberance.pdf15 Jan 2025
Proforma of Allotment letterFile: allotment letter pbc.pdf15 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Revised Format A.pdf15 Jan 2025
Details of encumbrances concerned to LegalFile: Financial Encumbrances.pdf15 Jan 2025
Details of encumbrances concerned to LegalFile: legal Emcuberance.pdf15 Jan 2025
Proforma of Agreement for saleFile: pcb aFS.pdf15 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: opening rera designated account-PBC.pdf15 Jan 2025
Copy of the legal title reportFile: DOC332.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 2.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certficate 2.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf18 Nov 2024
Deviation Report with respect to Allotment letterFile: Deviation Allotment.pdf26 Oct 2024
CERSAI detailsFile: Undertaking for CERSAI.pdf22 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Secured AND Unsecured Loan.pdf22 Oct 2024
Other - TechnicalFile: Annexure A.pdf11 Oct 2024
Layout approvalFile: Layout.pdf10 Oct 2024
Building plan approvalFile: First.pdf10 Oct 2024
Building plan approvalFile: Ground-compressed.pdf10 Oct 2024
Building plan approvalFile: Second.pdf10 Oct 2024
Building plan approvalFile: Third.pdf10 Oct 2024
Building plan approvalFile: Typical.pdf10 Oct 2024
Building plan approvalFile: Refuge.pdf10 Oct 2024
Building plan approvalFile: 23 rd Floor.pdf10 Oct 2024
Building plan approvalFile: Section-compressed.pdf10 Oct 2024
PAN CardFile: PAN CARD.pdf10 Oct 2024
Copy of Layout Approval (in case of layout)File: Layout.pdf10 Oct 2024
Declaration in FORM BFile: Form B Declaration.pdf10 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: REV CC 2022.pdf10 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: PLINTH CC 2021.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Section-compressed.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 23 rd Floor.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Refuge.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Typical.pdf10 Oct 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
GULMOHAR HERITAGE BUILDING NO 3 WING C AND DNEXT TO FUNFIESTA SRIPRASTHA ROAD NALLASOPARA WEST166CompletedMay 2019Late, Aug 2019

How this compares with Palghar

10%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAJESTIC TOWER-A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OPP DMART3,200+ in Palghar

2 kmMAJESTIC TOWER-ACompleted 77Lapsed / revoked 59Other 118Dot size: filed unitsN

Filed coordinates, straight-line distance. 254 registered projects within 2 km.

Builder: PB CONSTRUCTION

PB CONSTRUCTION has 1 registration on MahaRERA, including MAJESTIC TOWER-A. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if MAJESTIC TOWER-A is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAJESTIC TOWER-A?

The registered promoter entity is PB CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAJESTIC TOWER-A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAJESTIC TOWER-A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAJESTIC TOWER-A?

The professionals named in the filing: Architect: AJYA WADE & ASSOCIATES; Engineer: APTE ASSOCIATES; Engineer: JW CONSULTANTS LLP; Chartered Accountant: J F DIAS CO; Chartered Accountant: jatin narayan kamerkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAJESTIC TOWER-A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAJESTIC TOWER-A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAJESTIC TOWER-A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.