Home / Browse projects / Raigarh, Maharashtra / Majestic Planet

Completed No litigation declared Others project

Majestic Planet

By 365DAYS CONSTRUCTION LLP

RG-MH-29633 · RERA P52000028719 · Last updated on MahaRERA portal: 19 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Sep 2026Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: External plumbing and external plaster, 96%
49 of 98Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

Majestic Planet is a Others project by 365DAYS CONSTRUCTION LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000028719 on 25 Mar 2021. The registration is recorded completed; possession was promised by 30 Sep 2026. 49 of the 98 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameMajestic Planet
  • TypeOthers
  • Location
    • Plot No 41
    • Sector 20
    • Taloje Panchnad
    • Panvel
    • Raigarh
    • 410208
  • Pincode410208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000028719
  • ReraGenie IDRG-MH-29633

Builder

  • Name365DAYS CONSTRUCTION LLP
  • Entity typePartnership
  • GSTIN27AABFZ9375J1ZF
  • PartnersMOHAMED ANAS ABDUL WAHAB DOKADIA, FAIZAN MOHD ASHRAF DOKADIA, MOHAMMED ASHRAF ABDUL KADER DOKADIA, ABDUL WAHAB ABDUL KADER DOKADIA
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2021PromisedSep 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Mar 2021
  • Promised completion30 Sep 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed78 files

Current status

50%49 of 98 units booked

Figures as on 19 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Majestic PlanetNA1616821698

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 96%.

Majestic Planet: 95% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.96%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.57%

Progress on shared amenities15

As on 19 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed35

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots35
Open Space35

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Sep 2024
LandownerVillageDistrict
Planet Builders and DevelopersNavi Mumbai (M Corp.)Thane

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra Limited
Permissible FSI5322.51
Proposed, not sanctioned3,000 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCBD Belapur, Navi Mumbai

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAtul Patel Architects
EngineerS R Consultants
EngineerSumit Maruti Adkhale
Chartered AccountantSachin Maheshwari and Co.
Chartered AccountantG D Shah and Associates
PartnerRole in project
365DAYS CONSTRUCTION LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Mar 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Mar 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Mar 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Email from CIDCO - OC Plot No 41, Sector 20 at Taloja.pdf19 Jul 2025
Form 2A (FY 2024-2025)File: Form2A.pdf14 Jun 2025
Occupational CertificateFile: OC.pdf14 Jun 2025
Form 1File: Q4Form1.pdf11 Jun 2025
Form 2File: Q4Form2.pdf11 Jun 2025
Form 3File: Q4Form3.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: SoldUnsold.pdf11 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1Form1.pdf12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3Form3.pdf22 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3Form2.pdf22 Mar 2025
Disclosure of sold/ booked inventoryFile: Q3Sold-Unsold.pdf22 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3Form1.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2Form3.pdf25 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2Form2.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: Q2Sold-Unsold.pdf16 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf12 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2Form1.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1Form1.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1Form3.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1Form2.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4Form3.pdf13 May 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold.pdf11 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4Form2.pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4Form1.pdf13 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3Form3.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3Form2.pdf11 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3Form1.pdf15 Jan 2024
Disclosure of sold/ booked inventoryFile: Q2SoldUnsold.pdf29 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1Form3.pdf29 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2Form3.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1Form2.pdf22 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2Form2.pdf22 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1Form3.pdf10 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2Form3.pdf10 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3Form3.pdf10 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2Form1.pdf9 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1Form2.pdf7 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2Form2.pdf7 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3Form2.pdf7 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1Form1.pdf3 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2Form1.pdf3 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3Form1.pdf3 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A -365 Days construction .pdf26 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf15 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf15 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf10 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5.pdf28 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Majestic Planet.pdf30 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032022.pdf20 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 365Days Construction.pdf4 Jan 2023
Disclosure of sold/ booked inventoryFile: SoldUnsold.pdf30 Nov 2022
Copy of the legal title reportFile: Title Certificate Taloja.pdf19 Mar 2021
Layout approvalFile: 04 CC Drawing.pdf13 Mar 2021
Layout approvalFile: 05 CC Drawing.pdf13 Mar 2021
Layout approvalFile: 06 CC DRG.pdf13 Mar 2021
Layout approvalFile: 07 CC DRG.pdf13 Mar 2021
Layout approvalFile: 08 CC DRG.pdf13 Mar 2021
Building plan approvalFile: 09 IOD.pdf13 Mar 2021
PAN CardFile: 01 PAN CARD.pdf13 Mar 2021
Details of encumbrancesFile: 03 Encumbrance.pdf13 Mar 2021
Copy of Layout Approval (in case of layout)File: 04 CC Drawing.pdf13 Mar 2021
Copy of Layout Approval (in case of layout)File: 05 CC Drawing.pdf13 Mar 2021
Copy of Layout Approval (in case of layout)File: 06 CC DRG.pdf13 Mar 2021
Copy of Layout Approval (in case of layout)File: 07 CC DRG.pdf13 Mar 2021
Copy of Layout Approval (in case of layout)File: 08 CC DRG.pdf13 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: 09 IOD.pdf13 Mar 2021
Commencement Certificates / NA Order for plotted developmentFile: 10 Commencement Certificate.pdf13 Mar 2021
Declaration in FORM BFile: 11 Form B Declaration.pdf13 Mar 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12 Form 1 Certificate.pdf13 Mar 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13 Form 2 Certificate.pdf13 Mar 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 15 Form 3 CA Cerificate.pdf13 Mar 2021
Proforma of Allotment letterFile: 19 Draft Allotment Letter and Agreement.pdf13 Mar 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
MAJESTIC EMPIREP52000023690SECTOR 15, Raigarh23Jan 2020CompletedDec 2023Dec 2022

How this compares with Raigarh

50%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Majestic Planet on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sector 205,900+ in Raigarh

2 kmMajestic PlanetCompleted 61Lapsed / revoked 14Other 72Dot size: filed unitsN

Filed coordinates, straight-line distance. 147 registered projects within 2 km.

Builder: 365DAYS CONSTRUCTION LLP

365DAYS CONSTRUCTION LLP has 2 registrations on MahaRERA, including MAJESTIC EMPIRE and Majestic Planet. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Majestic Planet is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Majestic Planet?

The registered promoter entity is 365DAYS CONSTRUCTION LLP, a partnership as per the filing. Its GSTIN 27AABFZ9375J1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Majestic Planet?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Majestic Planet?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Majestic Planet?

The professionals named in the filing: Architect: Atul Patel Architects; Engineer: S R Consultants; Engineer: Sumit Maruti Adkhale; Chartered Accountant: Sachin Maheshwari and Co.; Chartered Accountant: G D Shah and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Majestic Planet?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Majestic Planet. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Majestic Planet to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.