Home / Browse projects / Pune, Maharashtra / MAITRI PARK

Registered No litigation declared Residential / Group Housing project

MAITRI PARK

By SHREE CONSTRUCTIONS

RG-MH-15224 · RERA P52100023471 · Last updated on MahaRERA portal: 28 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 44 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2027Possession promisedmoved 44 months from the original
7 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 98%
0Complaints at MahaRERAon this registration
Jump to the 374 documents Report an error

MAITRI PARK is a Residential / Group Housing project by SHREE CONSTRUCTIONS in Pune, Maharashtra, registered with MahaRERA as P52100023471 on 16 Dec 2019. Possession is promised by 4 Jul 2027. The completion date has moved by 44 months from the original filing.

At a glance

Project

  • NameMAITRI PARK
  • TypeResidential / Group Housing
  • Location
    • PAUD ROAD
    • MATALWADI PHATA
    • Bhugaon
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100023471
  • ReraGenie IDRG-MH-15224

Builder

  • NameSHREE CONSTRUCTIONS
  • Entity typePartnership
  • PartnersNITIN MURALIDHAR CHONDHE, UTTAM DATTATRAY CHONDHE, PRATIK GULAB INGAWALE, ANIL PRABHAKAR KAPSE, RAJU BABASAHEB INGAWALE
  • Other registrations6 more →
  • Completed5 of 7
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2019First promiseNov 2023Revised toJul 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Dec 2019
  • Promised completion4 Jul 2027
  • Revised completionRevised to 4 Jul 2027 (originally 15 Nov 2023)
  • Buildings2 building records
  • Documents filed374 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAITRI PARK-B WINGNA50000
MAITRI PARK-A WINGNA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 28 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 98%.

MAITRI PARK-B WING89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises98%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
MAITRI PARK-A WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed95

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots95
Closed/Covered15
Open Space80
BuildingClosed/CoveredOpen SpaceTotal
MAITRI PARK-B WING156580
MAITRI PARK-A WING01515

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,350 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Aug 2025
LandownerVillageDistrict
SIDDHARTHA VIJAY SARPOTDARKarve NagarPune

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI4651.21
Proposed, not sanctioned2,539 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS NO 85/1,B BUILDING NO C, SHANKAR NAGARI, PAUD ROAD, KOTHRUD, PUNE-411029

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVivek Patil Tanaji Patil
EngineerYashashree Consultant
Chartered AccountantS S JAGTAP AND ASSOCIATES
Chartered AccountantShrikant Maruti pathare
PartnerRole in project
SHREE CONSTRUCTIONS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100011098Nov 2023 → Jul 2024

Reason as filed by the promoterWe Shree Constructions had registered out Real Estate project viz. ‘Maitri Park’ with you under Project Registration No. P52100023471. The Project Completion Date is 05/07/2024. After obtaining MAHARERA registration as on 16/12/2019 there is no work started till date due to labour and material shortage owing to ‘Global Pandemic’ and ‘Recent Lockdown’ since then, few actions like OC and Handover is still pending. We have obtained revised project approval as on dated 06.07.2021, since then the actually construction of the revised project started, we require some more time to finish the project.

EXT52100024097Nov 2023 → Jul 2027

Reason as filed by the promoterWe Shree Constructions had registered out Real Estate project viz. ‘Maitri Park’ with you under Project Registration No. P52100023471. After obtaining MAHARERA registration as on 16/12/2019 there is no work started till date due to labour and material shortage owing to ‘Global Pandemic’ and ‘Recent Lockdown’ since then actual work for B Wing started in Dec 2020, we have obtained 2nd revised sanction of B Wing dated 06.07.2021, the same project need to be completed on or before 05.07.2024, construction of B wing completed up to 4th floor (90%), now we got addition of one more floor i.e. 5th flo

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 4 Jul 2027

Documents filed374

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 374 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Q-3 (2019).pdf28 May 2026
Form 2File: FROM 2 (2021).pdf28 May 2026
Form 3File: Q-3 (2019).pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: Q-3 (2019).pdf28 May 2026
Form 1File: Q-4 (2020).pdf28 May 2026
Form 2File: FROM 2 (2021).pdf28 May 2026
Form 3File: Q-4 (2020).pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: Q-4 (2020).pdf28 May 2026
Form 1File: Q-1 (2020).pdf28 May 2026
Form 2File: FROM 2 (2021).pdf28 May 2026
Form 3File: Q-1 (2020).pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: Q-1 (2020).pdf28 May 2026
Form 1File: Q-2 (2020).pdf28 May 2026
Form 2File: FROM 2 (2021).pdf28 May 2026
Form 3File: Q-2 (2020).pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: Q-2 (2020).pdf28 May 2026
Form 1File: Q-3 (2020).pdf28 May 2026
Form 2File: FROM 2 (2021).pdf28 May 2026
Form 3File: Q-3 (2020).pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: Q-3 (2020).pdf28 May 2026
Form 1File: Q-1 (2021).pdf28 May 2026
Form 2File: Form 2 merged (2022).pdf28 May 2026
Form 3File: Q-1 (2021).pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: Q-1 (2021).pdf28 May 2026
Form 1File: Q-2 (2021).pdf28 May 2026
Form 2File: Form 2 merged (2022).pdf28 May 2026
Form 3File: Q-2 (2021).pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: Q-2 (2021).pdf28 May 2026
Form 1File: Q-3 (2021).pdf28 May 2026
Form 2File: Form 2 merged (2022).pdf28 May 2026
Form 3File: Q-3 (2021).pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: Q-3 (2021).pdf28 May 2026
Form 1File: Form - I.pdf25 May 2026
Form 2File: Form 2 A.pdf25 May 2026
Form 3File: Form 3.pdf25 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf25 May 2026
OthersFile: Form 2 B.pdf25 May 2026
Form 2A (FY 2019-2020)File: Form 2 a.pdf10 Mar 2026
Form 2A (FY 2020-2021)File: Form 2A.pdf10 Mar 2026
Form 1File: Form - I.pdf27 Feb 2026
Form 2File: Form 2 Merged.pdf27 Feb 2026
Form 3File: Form 3.pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf27 Feb 2026
OthersFile: Format A.pdf27 Feb 2026
Form 1File: Form - I.pdf27 Feb 2026
Form 2File: Form 2 Merged.pdf27 Feb 2026
Form 3File: Form- 3.pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf27 Feb 2026
OthersFile: Form A.pdf27 Feb 2026
Form 1File: Form-I.pdf25 Feb 2026
Form 2File: Form 2_merged.pdf25 Feb 2026
Form 3File: Form -3.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold.pdf25 Feb 2026
OthersFile: Format A.pdf25 Feb 2026
Form 1File: Form 1.pdf25 Feb 2026
Form 2File: Form 2_merged.pdf25 Feb 2026
Form 3File: Form - 3 Shree.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf25 Feb 2026
OthersFile: Form 2A.pdf25 Feb 2026
Form 1File: Form-I.pdf25 Feb 2026
Form 2File: Form 2 Merged.pdf25 Feb 2026
Form 3File: Form 3.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf25 Feb 2026
OthersFile: Format A.pdf25 Feb 2026
Form 1File: Form I.pdf25 Feb 2026
Form 2File: Form2 merged.pdf25 Feb 2026
Form 3File: Form 3 New format.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf25 Feb 2026
OthersFile: Format A.pdf25 Feb 2026
Form 1File: Form I.pdf25 Feb 2026
Form 2File: Form 2 Merged.pdf25 Feb 2026
Form 3File: Form 3.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf25 Feb 2026
OthersFile: Form 2A Q-1.pdf25 Feb 2026
Form 1File: RERA Form I.pdf25 Feb 2026
Form 2File: Form 2 Merged.pdf25 Feb 2026
Form 3File: Form-3.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf25 Feb 2026
OthersFile: Format A.pdf25 Feb 2026
Form 1File: RERA Form I.pdf25 Feb 2026

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 44 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAITRI PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MATALWADI PHATA13,700+ in Pune

2 kmMAITRI PARKCompleted 17Lapsed / revoked 10Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: SHREE CONSTRUCTIONS

SHREE CONSTRUCTIONS has 7 registrations on MahaRERA, including SHREE SANKALP and KESHAR LAXMI RESIDENCE PHASE 1. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MAITRI PARK is delayed beyond 4 Jul 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAITRI PARK?

The registered promoter entity is SHREE CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAITRI PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAITRI PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAITRI PARK?

The professionals named in the filing: Architect: Vivek Patil Tanaji Patil; Engineer: Yashashree Consultant; Chartered Accountant: S S JAGTAP AND ASSOCIATES; Chartered Accountant: Shrikant Maruti pathare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAITRI PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAITRI PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAITRI PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.