Home / Browse projects / Nagpur, Maharashtra / MAHENDRA MAVIC

Registered No litigation declared Residential / Group Housing project

MAHENDRA MAVIC

By MAHENDRA SHYAMRAO TAYWADE

RG-MH-30503 · RERA P50500050549 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 6.00 crore secured on the land, in favour of DCB Bank Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
5 of 11Construction stages donefurthest along: Staircases, 98%
15 of 40Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 113 documents Report an error

MAHENDRA MAVIC is a Residential / Group Housing project by MAHENDRA SHYAMRAO TAYWADE in Nagpur, Maharashtra, registered with MahaRERA as P50500050549 on 21 Apr 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 25 of the 40 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameMAHENDRA MAVIC
  • TypeResidential / Group Housing
  • Location
    • HINGNA ROAD
    • SANSON LAYOUT
    • Nagpur (Urban)
    • Nagpur
    • 440036
  • Pincode440036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500050549
  • ReraGenie IDRG-MH-30503

Builder

  • NameMAHENDRA SHYAMRAO TAYWADE
  • Entity typeIndividual
  • Other registrations1 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredApr 2023First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Apr 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed113 files

Current status

62%25 of 40 units booked
86.5%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAHENDRA MAVICNA7740040

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 98%.

MAHENDRA MAVIC: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes95%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,350 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofDCB Bank Limited
Secured amountRs 6.00 crore
CERSAI search filedYes
Declared on25 Jun 2026

Approvals and building plan

Sanctioning authorityNagpur Improvement Trust
Permissible FSI5646.0
Proposed, not sanctioned5,646 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO. 6/7, SADODAYA COMPLEX, UPPER GROUND FLOOR, GANDHI PUTLA SQUARE, CENTRAL AVENUE ROAD, NAGPUR - 440 008
Estimated costRs 23.57 cr
Cost incurredRs 20.38 cr
Work done86.47%
BuildingWingEstimatedIncurred
MAHENDRA MAVICNARs 23.57 crRs 20.38 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRASHANT SATPUTE
EngineerPS PATANKAR
EngineerNilesh Choudhary
EngineerSurendra k Deshpande
Chartered AccountantSANJAY CHINDALIYA
Chartered AccountantKARAN MEHENDIRATTA
Chartered AccountantMJM ASSOCIATES
Chartered AccountantPriyanka Parse
PartnerRole in project
MAHENDRA SHYAMRAO TAYWADE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA11122518634Dec 2025 → Dec 2026

Reason as filed by the promoterDue to Labour shortage in the area, project is not completed at scheduled date

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed113

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Mahendra MAVIC form 1.pdf20 Jul 2026
Withdrawal Update Form 2File: Mahendra MAVIC form 2.pdf20 Jul 2026
Withdrawal Update Form 3File: Mahendra mavic form 3.pdf20 Jul 2026
Withdrawal Update Form 1File: MAHENDRA MAVIC Form 1.pdf27 Apr 2026
Withdrawal Update Form 2File: Mahendra mavic form 2.pdf27 Apr 2026
Withdrawal Update Form 3File: Mahendra mavic form 3.pdf27 Apr 2026
Withdrawal Update Form 1File: MAHENDRA MAVIC Form 1.pdf29 Jan 2026
Withdrawal Update Form 2File: MAHENDRA MAVIC FORM 2 (1).pdf29 Jan 2026
Withdrawal Update Form 3File: MAVIC FORM 3.pdf29 Jan 2026
Withdrawal Update Form 1File: ARCHITECT_CERTIFICATE_01-07-25.pdf17 Oct 2025
Withdrawal Update Form 1File: ARCHITECT_CERTIFICATE_16-10-25.pdf17 Oct 2025
Withdrawal Update Form 2File: 16__07__2025_new.pdf17 Oct 2025
Withdrawal Update Form 2File: 16__10__2025_new.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3_Apr-Jun 25.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3_Jul_Sept 25.pdf17 Oct 2025
Form 2A (FY 2024-2025)File: FORM_2A__25.pdf16 Oct 2025
Form 2A (FY 2023-2024)File: FORM_2A.pdf16 Oct 2025
Form 5 (FY 2023-2024)File: Form 5 23-24.pdf16 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 24-25.pdf16 Oct 2025
Form 1File: form 1 april to june 2023 mahendra mavic.pdf11 Oct 2025
Form 2File: form 2 april to june 2023 mahendra mavic.pdf11 Oct 2025
Form 3File: form 3april to june 2023 mahendra mavic.pdf11 Oct 2025
Disclosure of Sold and Booked InventoryFile: dsbi april to june 2023 mahendra mavic.pdf11 Oct 2025
Form 1File: form 1 april to june 2023 mahendra mavic.pdf11 Oct 2025
Form 2File: form, 2 july to sept 2023 mahendra mavic.pdf11 Oct 2025
Form 3File: form 3 july to sept 2023 mahendra mavic.pdf11 Oct 2025
Disclosure of Sold and Booked InventoryFile: dsbi july to sept 2023 mahendra mavic.pdf11 Oct 2025
Form 1File: form 1 oct to dec 2023 mahendra mavic.pdf11 Oct 2025
Form 2File: oct to dec 2023 mahendra mavic form 2.pdf11 Oct 2025
Form 3File: oct to dec 2023 mahendra mavic form 3.pdf11 Oct 2025
Disclosure of Sold and Booked InventoryFile: oct to dec 2023 mahendra mavic dsbi.pdf11 Oct 2025
Form 1File: jan to march 2024 mahendra mavic form 1.pdf11 Oct 2025
Form 2File: jan to march mahendra mavic form 2.pdf11 Oct 2025
Form 3File: jan to march mahendra mavic form 3.pdf11 Oct 2025
Disclosure of Sold and Booked InventoryFile: jan to march mahendra mavic dsbi.pdf11 Oct 2025
Form 1File: april to june 2024 mahendra mavic form 1.pdf11 Oct 2025
Form 2File: april to june 2024 mahendra mavic form 2.pdf11 Oct 2025
Form 3File: april to june 2024 mahendra mavic form 3.pdf11 Oct 2025
Disclosure of Sold and Booked InventoryFile: april to june 2024 mahendra mavic dsbi.pdf11 Oct 2025
Form 1File: july to sept 2024 mahendra mavic form 1.pdf11 Oct 2025
Form 2File: july to sept 2024 mahendra mavic form 2.pdf11 Oct 2025
Form 3File: july to sept 2024 mahendra mavic form 3.pdf11 Oct 2025
Disclosure of Sold and Booked InventoryFile: july to sept 2024 mahendra mavic dsbi.pdf11 Oct 2025
Form 1File: oct to dec 2024 mahendra mavic form 1.pdf11 Oct 2025
Form 2File: oct to dec 2024 mahendra mavic form 2.pdf11 Oct 2025
Form 3File: oct to dec 2024 mahendra mavic form 3.pdf11 Oct 2025
Disclosure of Sold and Booked InventoryFile: oct to dec 2024 mahendra mavic dsbi.pdf11 Oct 2025
Form 1File: jan to march 2025 mahendra mavic form 1.pdf11 Oct 2025
Form 2File: jan to march 2025 mahendra mavic form 2.pdf11 Oct 2025
Form 3File: jan to march 2025 mahendra mavic form 3.pdf11 Oct 2025
Disclosure of Sold and Booked InventoryFile: jan to march 2025 mahendra mavic form dsbi.pdf11 Oct 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: mavic form 3.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: mavic form 2.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Form 3 Apr to Jun 23_compressed.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 Form 3 Jul to Sep 23_compressed.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 Oct to dec 23_compressed.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form 3 Jan to Mar 24_compressed.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 Form 3 Apr to Jun 24_compressed.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 Form 3 Jul to Sep 24_compressed.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 Form 3 Oct to dec 24_compressed.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: DSBI.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: 4 DSBI Jan to Mar 2024.pdf20 Mar 2025
Disclosure of sold/ booked inventoryFile: 4 DSBI Jan to Mar 2024.pdf20 Mar 2025
Disclosure of sold/ booked inventoryFile: 5 DSBI Apr to June 2024.pdf20 Mar 2025
Disclosure of sold/ booked inventoryFile: 6 DSBI July to Sept 2024.pdf20 Mar 2025
Disclosure of sold/ booked inventoryFile: 7 DSBI Oct to Dec 2024.pdf20 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form 1 July to September 2023.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form 1 Oct to Dec 2023.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form 1 Jan to Mar 2024.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Form 1 April to June 2024.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Form 1 July to Sept 2024.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Form 1 Oct to Dec 2024.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 apr to jun 23.pdf18 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Form 2 April To June 2024.pdf18 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Form 2 Oct to Dec 2024.pdf18 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Form 2 july to Sept 2024.pdf18 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form 2 Jan to Mar 2024.pdf18 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Form 2 Oct to Dec 2023.pdf18 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 July to September 2023.pdf18 Mar 2025

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
MAHENDRA SKYLARKPLOT NO 27 DONGRE LAYOUT28CompletedMay 2024May 2024
KASTURI-IIIPLOT NO 501 A RAJENDRA NAGAR NAGPUR54CompletedDec 2022Jun 2022

How this compares with Nagpur

62%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 12 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAHENDRA MAVIC on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SANSON LAYOUT2,800+ in Nagpur

2 kmMAHENDRA MAVICCompleted 10Lapsed / revoked 3Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 25 registered projects within 2 km.

Builder: MAHENDRA SHYAMRAO TAYWADE

MAHENDRA SHYAMRAO TAYWADE has 2 registrations on MahaRERA, including MAHENDRA MAVIC and SHIV SHAURYA BY MAHENDRA. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if MAHENDRA MAVIC is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAHENDRA MAVIC?

The registered promoter entity is MAHENDRA SHYAMRAO TAYWADE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAHENDRA MAVIC?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAHENDRA MAVIC?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAHENDRA MAVIC?

The professionals named in the filing: Architect: PRASHANT SATPUTE; Engineer: PS PATANKAR; Engineer: Nilesh Choudhary; Engineer: Surendra k Deshpande; Chartered Accountant: SANJAY CHINDALIYA; Chartered Accountant: KARAN MEHENDIRATTA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAHENDRA MAVIC?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAHENDRA MAVIC. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAHENDRA MAVIC to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.