Home / Browse projects / Raigarh, Maharashtra / Mahalaxmi Nivara

Completed No litigation declared Residential / Group Housing project

Mahalaxmi Nivara

By MAHALAXMI BUILDTECH LLP

RG-MH-21163 · RERA P51900007332 · Last updated on MahaRERA portal: 29 Sep 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2023Possession promisedregistration recorded completed
48 of 66Construction stages doneacross 6 buildings; furthest along: Installation of Lifts, 80%
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

Mahalaxmi Nivara is a Residential / Group Housing project by MAHALAXMI BUILDTECH LLP in Raigarh, Maharashtra, registered with MahaRERA as P51900007332 on 17 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2023. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameMahalaxmi Nivara
  • TypeResidential / Group Housing
  • Location
    • .
    • Mangaon
    • Utekhol
    • Raigarh
    • 402104
  • Pincode402104
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900007332
  • ReraGenie IDRG-MH-21163

Builder

  • NameMAHALAXMI BUILDTECH LLP
  • Entity typePartnership
  • PartnerNimesh Gulabchand Chheda

Key dates

this monthRegisteredAug 2017First promiseJun 2021Revised toJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Aug 2017
  • Promised completion30 Jun 2023
  • Revised completionRevised to 30 Jun 2023 (originally 30 Jun 2021)
  • Buildings6 building records
  • Documents filed75 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 1NA50000
Building No 2NA50000
Building No 3NA50000
Building No 4NA50000
Building No 5NA60000
Building No 6NA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 29 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

48 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Installation of Lifts, at 80%.

Building No 182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 382%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 482%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 575%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Building No 655%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 29 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes66%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes66%
Landscaping & Tree PlantingYes0%
Street LightingYes60%
Community BuildingsYes60%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed390

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots390
Open Space390
BuildingOpen SpaceTotal
Building No 18484
Building No 28484
Building No 36565
Building No 46565
Building No 54040
Building No 65252

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9720.76
Proposed, not sanctioned9,721 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMumbai dadar 400028

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectStructilis Consultants Pvt Ltd
EngineerSAMARTH AGARWAL
Chartered AccountantPRATIK N PANDYA & CO
Chartered AccountantJignesh Dedhia & Co LLP
PartnerRole in project
MAHALAXMI BUILDTECH LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000013231Jun 2021 → Jun 2023

Reason as filed by the promoterThe Percentage of work done of MAHALAXMI NIVARA Building no-5 is 85.6%, Building no-6 is 56.3% and Internal and External Development Works in respect of the entire Registered Phase is 63.75%. The Occupancy certificate has obtained for building no- 1,2,3 & 4.

EXT52000009710Jun 2021 → Jun 2022

Reason as filed by the promoterThe Percentage of work done of MAHALAXMI NIVARA Building no-1 &3 is 95% and Occupancy certificate is obtained for building no- 2 & 4. The said construction work is being delayed due to the current pandemic. I hereby apply for the extension of construction of work. I request you to consider the case and grant the extension.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Mar 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Mar 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 26 Jun 2023

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Mahalaxmi Form 5.pdf29 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC certificate.pdf26 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: MH 1920 01.pdf20 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: MH 1920 02.pdf20 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: MH 1920 03.pdf20 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: MH 1920 04.pdf20 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: MH 2001 01.pdf20 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: MH 2021 02.pdf20 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: MH 2021 03.pdf20 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: MH 2021 04.pdf20 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: MH 2122 01.pdf20 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: MH 2122 02.pdf20 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: MH 2122 03.pdf20 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: MH 2122 04.pdf20 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: MH 2223 01.pdf20 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: MH 2223 02.pdf20 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: MH 2223 03.pdf20 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf12 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf12 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Scan 1.pdf12 Jan 2023
Certificates of CA (Form 3)File: Form 3 1.pdf12 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Mahalaxmi Buildtech LLP 1.pdf12 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Mahalaxmi Buildtech LLP Form 5.pdf30 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Mahalaxmi Buildtech LLP Form 5.pdf29 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Mahalaxmi Buildtech LLP M21.pdf28 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf2 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf2 Sep 2021
Disclosure of sold/ booked inventoryFile: building 1.pdf2 Sep 2021
Disclosure of sold/ booked inventoryFile: building 2.pdf2 Sep 2021
Disclosure of sold/ booked inventoryFile: building 3.pdf2 Sep 2021
Disclosure of sold/ booked inventoryFile: Building 4.pdf2 Sep 2021
Disclosure of sold/ booked inventoryFile: building 5.pdf2 Sep 2021
Disclosure of sold/ booked inventoryFile: building 6.pdf2 Sep 2021
Certificates of CA (Form 3)File: Form 3.pdf2 Sep 2021
Declaration about Commencement CertificateFile: declaration CC MBTLLP.pdf14 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Architect certificate Building 1.pdf6 Apr 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Part.pdf6 Apr 2021
Certificates of CA (Form 5)File: Form 5 Scan.pdf30 Sep 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Scan.pdf30 Sep 2020
Details of encumbrancesFile: Mahalaxmi Agreement OBC Bank 1.pdf26 Dec 2019
Details of encumbrancesFile: Mahalaxmi Agreement OBC Bank 2.pdf26 Dec 2019
Details of encumbrancesFile: Mahalaxmi Agreement OBC Bank 3.pdf26 Dec 2019
Details of encumbrancesFile: Mahalaxmi Agreement OBC Bank 4.pdf26 Dec 2019
Details of encumbrancesFile: Mahalaxmi Agreement OBC Bank 5.pdf26 Dec 2019
Details of encumbrancesFile: Mahalaxmi Agreement OBC Bank 6.pdf26 Dec 2019
Certificates of CA (Form 5)File: Form 5 Mahalaxmi Buildtech LLP 1.pdf30 Sep 2019
Certificates of CA (Form 5)File: Mahalaxmi Buildtech LLP Form 5.pdf28 Sep 2018
Building plan approvalFile: Plan 2 of 4.pdf23 Mar 2018
Layout approvalFile: Plan 1 of 4.pdf23 Mar 2018
Building plan approvalFile: Plan 3 of 4.pdf23 Mar 2018
Building plan approvalFile: Plan 4 of 4.pdf23 Mar 2018
Copy of Layout Approval (in case of layout)File: Plan 1 of 4.pdf23 Mar 2018
Building Plan Approval (IOD)File: Plan 2 of 4.pdf23 Mar 2018
Building Plan Approval (IOD)File: Plan 3 of 4.pdf23 Mar 2018
Building Plan Approval (IOD)File: Plan 4 of 4.pdf23 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1.pdf23 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEE S CERTIFICATE 1.pdf23 Mar 2018
Certificates of CA (Form 3)File: MAHALAXMI BUILDTECH LLP 1.pdf30 Jul 2017
Layout approvalFile: HPSC1925.pdf29 Jul 2017
Building plan approvalFile: MYSCAN_20170713_0001.pdf29 Jul 2017
Building plan approvalFile: HPSC1926.pdf29 Jul 2017
Building plan approvalFile: HPSC1927.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: HPSC1925.pdf29 Jul 2017
Building Plan Approval (IOD)File: MYSCAN_20170713_0001.pdf29 Jul 2017
Building Plan Approval (IOD)File: HPSC1926.pdf29 Jul 2017
Building Plan Approval (IOD)File: HPSC1927.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf29 Jul 2017
Proforma of Allotment letterFile: Mahalaxmi Agreement format.pdf28 Jul 2017
Proforma of Allotment letterFile: Mahalaxmi Flat Allotment letter.pdf28 Jul 2017
PAN CardFile: Pan Card.pdf26 Jul 2017
Copy of the legal title reportFile: Advocate Title.pdf26 Jul 2017
Details of encumbrancesFile: Encumbrances.pdf26 Jul 2017
Declaration in FORM BFile: Declration B.pdf26 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: STRUCTILIS FORM 2.pdf26 Jul 2017

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 24 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mahalaxmi Nivara on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mangaon5,900+ in Raigarh

2 kmMahalaxmi NivaraCompleted 6Lapsed / revoked 5Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 43 registered projects within 2 km.

Builder: MAHALAXMI BUILDTECH LLP

MAHALAXMI BUILDTECH LLP has 1 registration on MahaRERA, including Mahalaxmi Nivara. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Mahalaxmi Nivara is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mahalaxmi Nivara?

The registered promoter entity is MAHALAXMI BUILDTECH LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mahalaxmi Nivara?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mahalaxmi Nivara?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mahalaxmi Nivara?

The professionals named in the filing: Architect: Structilis Consultants Pvt Ltd; Engineer: SAMARTH AGARWAL; Chartered Accountant: PRATIK N PANDYA & CO; Chartered Accountant: Jignesh Dedhia & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mahalaxmi Nivara?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mahalaxmi Nivara. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mahalaxmi Nivara to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.