Completed No litigation declared Plotted project

MAHALAXMI NAGAR 24 SECTOR 1

By ARA HABITATS LLP

RG-MH-14759 · RERA P50500046355 · Last updated on MahaRERA portal: 13 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
0 of 61Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

MAHALAXMI NAGAR 24 SECTOR 1 is a Plotted project by ARA HABITATS LLP in Nagpur, Maharashtra, registered with MahaRERA as P50500046355 on 22 Jun 2022. The registration is recorded completed; possession was promised by 14 Jun 2026. 61 of the 61 units on this registration are recorded sold or booked.

At a glance

Project

  • NameMAHALAXMI NAGAR 24 SECTOR 1
  • TypePlotted
  • Location
    • WARDHA ROAD
    • JAMTHA
    • Nagpur (Rural)
    • Nagpur
    • 441108
  • Pincode441108
  • RERA no.P50500046355
  • ReraGenie IDRG-MH-14759

Builder

  • NameARA HABITATS LLP
  • Entity typePartnership
  • PartnersANISH BHAWARILAL CHHAJED, RAHUL JAGDISH BONDRE, ATUL PREMCHAND TAJPURIYA
  • Other registrations8 more →
  • Completed9 of 9
  • Declared earlier projects3 →

Key dates

this monthRegisteredJun 2022PromisedJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Jun 2022
  • Promised completion14 Jun 2026
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed63 files

Current status

100%61 of 61 units booked

Figures as on 13 Feb 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities16

As on 13 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
Water PipelineYes100%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,874 sq m
Land owned byThe promoter
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSOMALWADA WARDHA ROAD

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPAWAN GUPTA
EngineerMADHUKAR RAMJI SHELOTE
EngineerVIPIN VAIDYA
Chartered AccountantNIKHIL KOCHAR
Chartered AccountantR D PAREKH
Chartered AccountantMURTAZA HUSSAIN
PartnerRole in project
ARA HABITATS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Jul 2024

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 M- 24 (S -1).pdf13 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A M- 24 (S -1).pdf20 Dec 2024
Home Buyer /Allottee Grievance Redressal CellFile: REDRESSAL M-24 (S-1).pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: M- 24 (S-1).pdf30 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM- 1 M-24 (S-1).pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM- 2 (M- 24 S-1).pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM- 3 (M-24-S-1)_compressed.pdf22 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FORM- 4 (24 S-1).pdf2 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complication Letter.pdf2 Jul 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM- 4 (24 S-1).pdf2 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (31-03-2024).pdf23 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31-03-2024_0001.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Quarterly Compliance 31-03-2024_0001.pdf21 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Quarterly Compliance 31-03-2024_0001.pdf21 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Quarterly Compliance 31-03-2024_0001.pdf21 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 (31-03-2024).pdf12 Apr 2024
Disclosure of sold/ booked inventoryFile: inventory list.pdf12 Apr 2024
Other - LegalFile: CC ROAD AND COMPOUND WALL 01-03-2024.pdf1 Mar 2024
Other - LegalFile: GREY WATER RECYCLING AND REUSE 01-03-2024.pdf1 Mar 2024
Other - LegalFile: SEWER LINE 01-03-2024.pdf1 Mar 2024
Other - LegalFile: STORM WATER DRAIN 01-03-2024.pdf1 Mar 2024
Other - LegalFile: WATER PIPE LINE 01-03-2024.pdf1 Mar 2024
Other - LegalFile: RL 1ST.pdf1 Mar 2024
Other - LegalFile: RL 2ND.pdf1 Mar 2024
Other - LegalFile: RL 3 RD.pdf1 Mar 2024
Other - LegalFile: RL 4 TH M - 24 (S - 1).pdf1 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE 30-06-2023.pdf28 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE 30-09-2023.pdf28 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31-12-2023.pdf20 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 31-12-2023.pdf13 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer 31-12-2023.pdf13 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Qurterly Compliance 10-02-2024.pdf11 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Qurterly Compliance 10-02-2024.pdf11 Feb 2024
Disclosure of sold/ booked inventoryFile: sold unsold 31-12-2023.pdf11 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Qurterly Compliance 10-02-2024.pdf11 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CRTIFICATE 31-12-2023 M24 S1.pdf23 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31-12-2023 M-24 S-1.pdf13 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30-06-23.pdf15 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30-09-2023.pdf15 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 30-09-2023.pdf31 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE - 30-06-2023_0001.pdf30 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf30 Oct 2023
Disclosure of sold/ booked inventoryFile: all sold (last 100.pdf26 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31-03-2023.pdf10 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 31-03-2023.pdf4 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 28-04-2023.pdf4 May 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: CERTIFICATE OF INCORPORATION.pdf9 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf8 Feb 2023
Disclosure of sold/ booked inventoryFile: LIST.pdf1 Feb 2023
Layout approvalFile: LAYOUT APPROVAL.pdf17 Jun 2022
Building plan approval or NA orderFile: MAP DEMARCATED 236.pdf17 Jun 2022
Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL.pdf17 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: MAP DEMARCATED 236.pdf17 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: NMRDA SANCTION.pdf17 Jun 2022
Declaration about Commencement CertificateFile: DECLARATION.pdf17 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf17 Jun 2022
Proforma of Allotment letterFile: AGREEMENT FINAL BLANK.pdf17 Jun 2022
PAN CardFile: PAN CARD.pdf16 Jun 2022
Copy of the legal title reportFile: SEARCH REPORT.pdf16 Jun 2022
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE SECTOR-1.pdf16 Jun 2022
Declaration in FORM BFile: FORM B.pdf16 Jun 2022
CERSAI detailsFile: CERSAI KH NO 236.pdf16 Jun 2022
Proforma of Allotment letterFile: ALLOTEMENT LETTER.pdf16 Jun 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
MAHALAXMI NAGAR 24 SECTOR 3P50500046358JAMTHA, Nagpur62Jun 2022CompletedJun 2026May 2024
MAHALAXMI NAGAR 24 SECTOR 2P50500046407JAMTHA, Nagpur48Jun 2022CompletedJun 2026May 2024

How this compares with Nagpur

100%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAHALAXMI NAGAR 24 SECTOR 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JAMTHA2,800+ in Nagpur

Builder: ARA HABITATS LLP

ARA HABITATS LLP has 9 registrations on MahaRERA, including MAHALAXMI NAGAR 24 SECTOR 1 and MAHALAXMI NAGAR 24 SECTOR 2. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if MAHALAXMI NAGAR 24 SECTOR 1 is delayed beyond 14 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAHALAXMI NAGAR 24 SECTOR 1?

The registered promoter entity is ARA HABITATS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAHALAXMI NAGAR 24 SECTOR 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAHALAXMI NAGAR 24 SECTOR 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAHALAXMI NAGAR 24 SECTOR 1?

The professionals named in the filing: Architect: PAWAN GUPTA; Engineer: MADHUKAR RAMJI SHELOTE; Engineer: VIPIN VAIDYA; Chartered Accountant: NIKHIL KOCHAR; Chartered Accountant: R D PAREKH; Chartered Accountant: MURTAZA HUSSAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAHALAXMI NAGAR 24 SECTOR 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAHALAXMI NAGAR 24 SECTOR 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAHALAXMI NAGAR 24 SECTOR 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.