ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Mahalaxmi Icon A

Registration lapsed No litigation declared Residential / Group Housing project

Mahalaxmi Icon A

By Shree Swami Samarth Buildcon

RG-MH-21549 · RERA P52100029812 · Last updated on MahaRERA portal: 21 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
7 of 11Construction stages donefurthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

Mahalaxmi Icon A is a Residential / Group Housing project by Shree Swami Samarth Buildcon in Pune, Maharashtra, registered with MahaRERA as P52100029812 on 4 Jul 2021. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameMahalaxmi Icon A
  • TypeResidential / Group Housing
  • Location
    • Navmaharashtra school road
    • Pimprigoan
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411017
  • Pincode411017
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100029812
  • ReraGenie IDRG-MH-21549

Builder

  • NameShree Swami Samarth Buildcon
  • Entity typePartnership
  • PartnersPallavi Pravin Shinde, Chetan Sudhir Waghere, Vishal Sudhir Waghere, Alka Sudam Waghere
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredJul 2021First promiseDec 2023Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on4 Jul 2021
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2023)
  • Buildings1 building record
  • Documents filed58 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Mahalaxmi Icon ANA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Mahalaxmi Icon A: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 21 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Open Space2

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area942 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Shalan Balasaheb Waghmare and othersPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Permissible FSI2171.83
Proposed, not sanctioned2,172 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKudale plaza Survey no11 1 1 Near Datta Mandir Next hotel Ganesh Pimpri 411017

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectI P Associates Ar Satyajeet Inamdar
EngineerEr Sahil Waghmare
Chartered AccountantDeokar and associates
PartnerRole in project
Shree Swami Samarth Buildcon-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100018473Dec 2023 → Dec 2024

Reason as filed by the promoter(1) Due to Global pandemic labours at site were not also material was not available due to that construction work was very slow. (2) Due to Global Pandemic Covid-19 sales of flat was very slow that also affected speed of construction (3) Due to lockdown 2 in year 2021 our construction completion got delayed and due to that we were unable to PCMC completion certificate.

EXT52100025770Dec 2023 → Dec 2025

Reason as filed by the promoter(1) Due to Global pandemic labours at site were not also material was not available due to that construction work was very slow. (2) Due to Global Pandemic Covid-19 sales of flat was very slow that also affected speed of construction (3) Due to lockdown 2 in year 2021 our construction completion got delayed and due to that we were unable to get Pune Municipal corporation completion certificate

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jun 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Binder1-1_compressed.pdf21 Apr 2025
Building plan approvalFile: Binder1-2_compressed.pdf21 Apr 2025
Building plan approvalFile: Binder1-3_compressed.pdf21 Apr 2025
Building plan approvalFile: Binder1-3_compressed.pdf21 Apr 2025
Building plan approvalFile: Binder1-4_compressed.pdf21 Apr 2025
Building plan approvalFile: Binder1-5_compressed.pdf21 Apr 2025
Copy of Layout Approval (in case of layout)File: Binder1-1_compressed.pdf21 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf21 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Binder1-2_compressed.pdf21 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Binder1-3_compressed.pdf21 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Binder1-3_compressed.pdf21 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Binder1-4_compressed.pdf21 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Binder1-5_compressed.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: DOSU upto march 2025.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 upto march 2025.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 upto march 2025.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: march 25 Engineers Certificate on Cost Incurred on Project Form 2.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: DOSU Upto March 2025.pdf19 Apr 2025
CERSAI detailsFile: CERSAI letter Mahalaxmi Icon A.pdf3 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Mahalaxmi Icon A.pdf3 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Kotak Bank Format B Mahalaxmi Icon A.pdf3 Apr 2025
Declaration in FORM BFile: Form BRera Self Declaration.pdf1 Apr 2025
Disclosure of sold/ booked inventoryFile: Mahalaxmi Icon A Sold Unsold Inventory.pdf1 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A 23to24.pdf1 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23to24.pdf1 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Mahalaxmi Icon A.pdf6 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf6 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Mahalaxmi Icon A.pdf6 Jan 2025
Disclosure of sold/ booked inventoryFile: Mahalaxmi Icon A Sold Unsold Inventory.pdf6 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21TO22 Engg Certificate.pdf27 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 22TO23 Engg Certificate.pdf27 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 23TO24 Engg certificate.pdf27 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Plinth checking certificate.pdf15 Feb 2024
Declaration in FORM BFile: Form bupto 31dec2024_compressed.pdf15 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Letter.pdf15 Feb 2024
Disclosure of sold/ booked inventoryFile: DOSU 29012024.pdf15 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 21TO22.pdf15 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: shree swami samarth Buildcon 22-23.pdf15 Feb 2024
Other - TechnicalFile: Plinth checking certificate.pdf15 Feb 2024
Declaration about Commencement CertificateFile: declaration of commencement certificate.pdf18 Jun 2021
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf18 Jun 2021
Layout approvalFile: Sanctioned layout plan.pdf14 Jun 2021
Building plan approvalFile: Plan 2.pdf14 Jun 2021
Building plan approvalFile: Plan 3.pdf14 Jun 2021
Building plan approvalFile: Plan 4.pdf14 Jun 2021
Building plan approvalFile: Plan 5.pdf14 Jun 2021
PAN CardFile: 5 Pan Shree Swami Samarth Buildcon.pdf14 Jun 2021
Copy of the legal title reportFile: search report compressed 1mb.pdf14 Jun 2021
Details of encumbrancesFile: Encumbrances letter.pdf14 Jun 2021
Copy of Layout Approval (in case of layout)File: Sanctioned layout plan.pdf14 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf14 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf14 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 4.pdf14 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 5.pdf14 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf14 Jun 2021
Declaration in FORM BFile: Self declaration form B Mahalaxmi Icon.pdf14 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate mahalaxmi Icon A_compressed.pdf14 Jun 2021
Proforma of Allotment letterFile: model form of agreement as per MAHARERA.pdf14 Jun 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mahalaxmi Icon A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pimprigoan13,700+ in Pune

2 kmMahalaxmi Icon ACompleted 59Lapsed / revoked 33Other 141Dot size: filed unitsN

Filed coordinates, straight-line distance. 233 registered projects within 2 km.

Builder: Shree Swami Samarth Buildcon

Shree Swami Samarth Buildcon has 3 registrations on MahaRERA, including MAHALAXMI ICON and Mahalaxmi Icon A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Mahalaxmi Icon A shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Mahalaxmi Icon A is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mahalaxmi Icon A?

The registered promoter entity is Shree Swami Samarth Buildcon, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mahalaxmi Icon A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mahalaxmi Icon A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mahalaxmi Icon A?

The professionals named in the filing: Architect: I P Associates Ar Satyajeet Inamdar; Engineer: Er Sahil Waghmare; Chartered Accountant: Deokar and associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mahalaxmi Icon A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mahalaxmi Icon A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mahalaxmi Icon A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.