MADHUBAN HEIGHTS

By WADHWANA HOUSING DEVELOPMENT AND INFRASTRUCTURE CO

RG-MH-54479 · RERA P51800006442 · Last updated on MahaRERA portal: 2 Aug 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 26 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 72 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Aug 2024Possession promised26 months past this date
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 41 documents Report an error

MADHUBAN HEIGHTS is a Others project by WADHWANA HOUSING DEVELOPMENT AND INFRASTRUCTURE CO in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800006442 on 14 Aug 2017. Possession was promised by 28 Aug 2024 and is now 26 months past that date. The completion date has moved by 72 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMADHUBAN HEIGHTS
  • TypeOthers
  • Location
    • Borivali
    • Mumbai Suburban
    • 400092
  • Pincode400092
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800006442
  • ReraGenie IDRG-MH-54479

Builder

  • NameWADHWANA HOUSING DEVELOPMENT AND INFRASTRUCTURE CO
  • Entity typePartnership
  • PartnerSANDEEP WADHWANA
  • Declared earlier projects1 →

Key dates

26 months past promisethis monthRegisteredAug 2017First promiseAug 2018Revised toAug 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on14 Aug 2017
  • Promised completion28 Aug 2024
  • Revised completionRevised to 28 Aug 2024 (originally 31 Aug 2018)
  • Buildings2 building records
  • Documents filed41 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA160000
WING BNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 2 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

WING A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 2 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes90%
Open ParkingYes100%

Parking filed93

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots93
Closed/Covered2
Open Space91
BuildingClosed/CoveredOpen SpaceTotal
WING A1910
WING B18283

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,049 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6061.55
Proposed, not sanctioned5,508 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTIRUPATI NAGAR PHASE 1 OPP ROYAL ACADEMY SCHOOL VIRAR WEST PALGHAR 401303

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectELLORA PROJECT CONSULTANTS PVT LTD
EngineerSANDEEP SAKPAL
EngineerELLORA CONSULTANCY SERVICES
PartnerRole in project
WADHWANA HOUSING DEVELOPMENT AND INFRASTRUCTURE CO-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800000885Aug 2018 → Aug 2021

Reason as filed by the promoterwe have received Part Occupation Certificate on 29.12.2017. We are now in the process of obtaining second part Occupation certificate upto 13th floor of both wings and started the application procedure with the MCGM. The work has also been completed as required for the application. As soon as we receive the occupation certificate we will upload the same. Therefore you are requested to revise the proposed date of completion of project till 31-August-2019. We are paying necessary charges for the same.

EXT51800005952Aug 2018 → Aug 2021

Reason as filed by the promoterWe have applied for additional tdr/ fungible fsi as per new road width policy and are awaiting the same and which will require additional car parking and the previous car parking contractor has defected and we have signed a new contractor who will be completing the entire work and compliance for the same. we have obtained Noc of allottees and part oc is also received. Please grant extension for us to complete the work

EXT51800016847Aug 2018 → Aug 2024

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION TILL 28/08/2024

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000292377GIRISH BABUBHAI JOSHIWADHWANA HOUSING AND INFRASTRUCTURE CO21/08/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 May 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed41

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf2 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf2 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf2 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - 03 23.pdf24 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - 06 23.pdf24 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2a - 03 23.pdf24 Jul 2023
Certificates of CA (Form 3)File: Form 3 - 03 23.pdf24 Jul 2023
Certificates of CA (Form 3)File: Form 3 - 06 23.pdf24 Jul 2023
Declaration in FORM BFile: Form B.pdf29 Jun 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf29 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20 - 21.pdf29 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21 - 22.pdf29 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- March 23_0001_compressed.pdf22 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM -5 (FY 2019-20) Madhuban Heights.pdf29 Mar 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Annual Audit Report of Statutory CA (Form 5) (FY 2018-19).PDF1 Feb 2020
Certificates of CA (Form 5)File: Madhuban.pdf14 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf15 May 2018
Certificates of CA (Form 3)File: Form 3.pdf31 Mar 2018
Building plan approvalFile: p07.pdf30 Jul 2017
Building plan approvalFile: p06.pdf30 Jul 2017
Building plan approvalFile: p02.pdf30 Jul 2017
Layout approvalFile: p04.pdf30 Jul 2017
Building plan approvalFile: p01.pdf30 Jul 2017
Building plan approvalFile: p04.pdf30 Jul 2017
Building plan approvalFile: p03.pdf30 Jul 2017
Building plan approvalFile: p05.pdf30 Jul 2017
Copy of the legal title reportFile: Title report.pdf30 Jul 2017
Details of encumbrancesFile: encumbtances.PDF30 Jul 2017
Copy of Layout Approval (in case of layout)File: p04.pdf30 Jul 2017
Building Plan Approval (IOD)File: p01.pdf30 Jul 2017
Building Plan Approval (IOD)File: p02.pdf30 Jul 2017
Building Plan Approval (IOD)File: p03.pdf30 Jul 2017
Building Plan Approval (IOD)File: p04.pdf30 Jul 2017
Building Plan Approval (IOD)File: p05.pdf30 Jul 2017
Building Plan Approval (IOD)File: p06.pdf30 Jul 2017
Building Plan Approval (IOD)File: p07.pdf30 Jul 2017
Declaration in FORM BFile: MADHUBAN HEIGHTS FORM B [AFFIDAVIT CUM DECLARATION].PDF30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARTICIATE CERTIFICATE.PDF30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM - 2 ENGINEERS CERTIFICATE.PDF30 Jul 2017
Certificates of CA (Form 3)File: FORM 3CA CERTIFICATE.PDF30 Jul 2017
Proforma of Allotment letterFile: Flat Agreement.pdf30 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
TIRUPATI GRANDE AND SANDEEP HOUSES NO 101B TIRUPATI NAGAR PHASE 1 VIRAR WEST PALGHAR 401303152CompletedMar 2014Mar 2014

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 72 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MADHUBAN HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali6,700+ in Mumbai Suburban

2 kmMADHUBAN HEIGHTSCompleted 157Lapsed / revoked 90Other 218Dot size: filed unitsN

Filed coordinates, straight-line distance. 465 registered projects within 2 km.

Builder: WADHWANA HOUSING DEVELOPMENT AND INFRASTRUCTURE CO

WADHWANA HOUSING DEVELOPMENT AND INFRASTRUCTURE CO has 1 registration on MahaRERA, including MADHUBAN HEIGHTS. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that MADHUBAN HEIGHTS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if MADHUBAN HEIGHTS is delayed beyond 28 Aug 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MADHUBAN HEIGHTS?

The registered promoter entity is WADHWANA HOUSING DEVELOPMENT AND INFRASTRUCTURE CO, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MADHUBAN HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MADHUBAN HEIGHTS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MADHUBAN HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MADHUBAN HEIGHTS?

The professionals named in the filing: Architect: ELLORA PROJECT CONSULTANTS PVT LTD; Engineer: SANDEEP SAKPAL; Engineer: ELLORA CONSULTANCY SERVICES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MADHUBAN HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MADHUBAN HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MADHUBAN HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.