Registered No litigation declared Residential / Group Housing project

M R INFRASTRUCTURE AND DEVELOPERS

By M. R. INFRASTRUCTURE & DEVELOPERS

RG-MH-28051 · RERA P51800024803 · Last updated on MahaRERA portal: 10 Jan 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 45 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 45 months from the original
10 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 20%
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

M R INFRASTRUCTURE AND DEVELOPERS is a Residential / Group Housing project by M. R. INFRASTRUCTURE & DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800024803 on 9 Mar 2020. Possession is promised by 31 Dec 2026. The completion date has moved by 45 months from the original filing.

At a glance

Project

  • NameM R INFRASTRUCTURE AND DEVELOPERS
  • TypeResidential / Group Housing
  • Location
    • PLOT NO 676 TO 679
    • CTS E/86-16
    • 20TH ROAD
    • KHAR WEST
    • Andheri
    • Mumbai Suburban
    • 400052
  • Pincode400052
  • RERA no.P51800024803
  • ReraGenie IDRG-MH-28051

Builder

  • NameM. R. INFRASTRUCTURE & DEVELOPERS
  • Entity typePartnership
  • PartnersMOHAMMED UBAID BARUDGAR, MOHAMMED OAIS BARUDGAR, ABDUL WAHAB BARUDGAR, NEETA CHAVAN

Key dates

this monthRegisteredMar 2020First promiseMar 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Mar 2020
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Mar 2023)
  • Buildings2 building records
  • Documents filed79 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KHAR SHAKTI - TENANTS WING - A WINGNA160000
PALI CARTERS - SALE WING- B WINGNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 10 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 20%.

KHAR SHAKTI - TENANTS WING - A WING47%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
PALI CARTERS - SALE WING- B WING47%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area827 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2444.5
Proposed, not sanctioned1,450 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKOLDUNGRI, ANDHERI EAST

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
M. R. INFRASTRUCTURE & DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800024829Mar 2023 → Dec 2026

Reason as filed by the promoterWe would like to request your good self and to kindly grant for Rera Extension for completion of project up to 31-12-2026. There was delay in completion of project due to various reasons like ill heath of partner, financial issues, no flats sold, charges in government policies etc. Now the project construction is going on properly and there are no financial issue for the partners and we are very confident to complete the project before the proposed extension of 31-12-2026. Thus we request your good self to kindly grant RERA extension for project so that the project can be complete smoothly and

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Feb 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Feb 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Feb 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form2A-19-20.pdf10 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory Disclousre.pdf23 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf26 Nov 2024
Declaration about Commencement CertificateFile: cc declaration.pdf26 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 (1).pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form2A-20-21 (1).pdf22 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold final.pdf22 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2A-21-22.pdf22 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A-22-23.pdf22 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A-23-24 (1).pdf22 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf15 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf15 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf15 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf15 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf15 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf15 Oct 2024
Declaration in FORM BFile: Form B.pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 03 24.pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 06 24.pdf11 Oct 2024
CERSAI detailsFile: Cersai Declaration.pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JAN TO MARCH 20.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 APRIL TO JUNE 20.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JULY TO SEP 20.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 OCT TO DEC 20.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JAN TO MARCH 21.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 APRIL TO JUNE 21.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JULY TO SEP 21.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 OCT TO DEC 21.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JAN TO MARCH 22.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 APRIL TO JUNE 22.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JULY TO SEP 22.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 OCT TO DEC 22.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JAN TO MARCH 23.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 APRIL TO JUNE 23.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JULY TO SEP 23.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 OCT TO DEC 23.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 FORM 2 JAN TO MARCH 20.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2 APRIL TO JUNE 20.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 FORM 2 JULY TO SEP 20.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 FORM 2 OCT TO DEC 20.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 FORM 2 JAN TO MARCH 21.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 FORM 2 APRIL TO JUNE 21.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 FORM 2 JULY TO SEP 21.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 FORM 2 OCT TO DEC 21.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 FORM 2 JAN TO MARCH 22.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 FORM 2 JULY TO SEP 22.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 FORM 2 APRIL TO JUNE 22.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 FORM 2 OCT TO DEC 22.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13 FORM 2 JAN TO MARCH 23.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 14 FORM 2 APRIL TO JUNE 23.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 15 FORM 2 JULY TO SEP 23.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 16 FORM 2 OCT TO DEC 23.pdf9 Aug 2024
Building plan approvalFile: Drawing-concession.pdf18 Feb 2020
Layout approvalFile: Drawing-concession.pdf18 Feb 2020
PAN CardFile: pan card.pdf18 Feb 2020
Copy of the legal title reportFile: Title Certificate.pdf18 Feb 2020
Details of encumbrancesFile: Non Encumbrance declaration.pdf18 Feb 2020
Copy of Layout Approval (in case of layout)File: Drawing-concession.pdf18 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: Drawing-concession.pdf18 Feb 2020
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf18 Feb 2020
Declaration in FORM BFile: Form B.pdf18 Feb 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITE CTS CERTIFICATE.pdf18 Feb 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg certificate.pdf18 Feb 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf18 Feb 2020
Proforma of Allotment letterFile: Proforma Allotment letter Affidivit.pdf18 Feb 2020
OtherFile: Dev Agreements.pdf18 Feb 2020
OtherFile: drawing concession.pdf18 Feb 2020
OtherFile: Drawings FCC.pdf18 Feb 2020
OtherFile: Partnership deeds.pdf18 Feb 2020
OtherFile: Registration Certificate.pdf18 Feb 2020
OtherFile: pg 1 drawing-compressed.pdf18 Feb 2020
OtherFile: pg 2 drawing.pdf18 Feb 2020
OtherFile: pg 3 4 drawing.pdf18 Feb 2020
OtherFile: pg 5 drawing.pdf18 Feb 2020
OtherFile: iod_compressed.pdf18 Feb 2020

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 45 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep M R INFRASTRUCTURE AND DEVELOPERS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near 20TH ROAD, KHAR WEST6,700+ in Mumbai Suburban

Builder: M. R. INFRASTRUCTURE & DEVELOPERS

M. R. INFRASTRUCTURE & DEVELOPERS has 1 registration on MahaRERA, including M R INFRASTRUCTURE AND DEVELOPERS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if M R INFRASTRUCTURE AND DEVELOPERS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of M R INFRASTRUCTURE AND DEVELOPERS?

The registered promoter entity is M. R. INFRASTRUCTURE & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in M R INFRASTRUCTURE AND DEVELOPERS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for M R INFRASTRUCTURE AND DEVELOPERS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in M R INFRASTRUCTURE AND DEVELOPERS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About M R INFRASTRUCTURE AND DEVELOPERS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save M R INFRASTRUCTURE AND DEVELOPERS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.