ReraGenieLog inGet a buyer report

Home / Browse projects / Dakshina Kannada, Karnataka / LUMEN DEI

Registration approved No litigation declared Mixed Development project

LUMEN DEI

By RAJESH LAZAR DSOUZA

RG-KA-34313 · RERA PRM/KA/RERA/1257/336/PR/300923/006294 · Last updated on RERA Karnataka portal: 12 Sep 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Mar 2024Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 98 documents Report an error

LUMEN DEI is a Mixed Development project by RAJESH LAZAR DSOUZA in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/336/PR/300923/006294 on 30 Sep 2023. Possession is promised by 31 Mar 2024.

At a glance

Project

  • NameLUMEN DEI
  • TypeMixed Development
  • Location
    • Bantwala
    • Dakshina Kannada
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1257/336/PR/300923/006294
  • ReraGenie IDRG-KA-34313

Builder

  • NameRAJESH LAZAR DSOUZA
  • Entity typeProprietorship
  • GSTIN29BKSPD9673H1ZD
  • Authorized SignatoryRAJESH LAZAR DSOUZA

Key dates

this monthRegisteredSep 2023PromisedMar 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on30 Sep 2023
  • Promised completion31 Mar 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed98 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LUMEN DEI-----25

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 12 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 12 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areasYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners2
LandownerVillageDistrict
RAJESH LAZAR DSOUZA--
RAJESH LAZAR DSOUZA--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 3.67 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 3.63 cr-
On-site expenditure-Site OverheadRs 3.00 lakh-
On-site expenditure-Consultants FeesRs 1.00 lakh-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 50,000-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANDEEP B
EngineerSANDEEP B
Chartered AccountantMAHESHA KUMARA K

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed98

As listed on the registration, under the names the promoter filed them with; the newest 80 of 98 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/336/PR/300923/006294 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
profit and loss account and balance sheet -2022-23 with CA UDIN along with scheduleFile: ITR FY 2022-23.pdf12 Sep 2023
profit and loss account and balance sheet, 2020-21, 2021-22File: Note on Income earned.pdf12 Sep 2023
LOAN SANCTION LETTERFile: Loan Sanction Letter BCCI.jpg12 Sep 2023
sources of fundsFile: Note on Sources of Funds.pdf12 Sep 2023
Area detailsFile: AREA DETAILS.pdf12 Sep 2023
Single plot layout OrderFile: DocScanner Sep 11, 2023 11-05 AM.pdf12 Sep 2023
Single plot layout OrderFile: DocScanner Sep 11, 2023 11-09 AM.pdf12 Sep 2023
Single plot layout OrderFile: Robert D'Souza.pdf12 Sep 2023
Single plot layout OrderFile: Roopa dsouza.pdf12 Sep 2023
Architects detailsFile: ARCHITECT DETAILS.pdf12 Sep 2023
FAR As per the sanction PlanFile: FAR.pdf12 Sep 2023
renewed Engineer license certificateFile: 6890216 (3).pdf12 Sep 2023
affidavit and upload the section 3(1) notarized affidavitFile: 123.pdf12 Sep 2023
plinth area detailsFile: PLINTH AREA.pdf12 Sep 2023
CA CERTIFICATE FOR EXPENDITURE DETAILSFile: RERA CA Signed.pdf12 Sep 2023
Single plot layout SITE-1File: Form 9.PDF26 Aug 2023
Single plot layout SITE-2File: Form 9-11.PDF26 Aug 2023
Single plot layout OrderFile: Updated 9 N 11 - Lumen Dei.pdf26 Aug 2023
certified Carpet area calculationFile: lumen area stmt.pdf26 Aug 2023
Architects details with valid COA NumberFile: Contractor N Arc -Graduation Cer - Sandeep.jpg26 Aug 2023
Architects certificateFile: ceo certificates.pdf26 Aug 2023
FAR As per the sanction Plan IS 2.22File: lumen area stmt.pdf26 Aug 2023
KSPCB CFEFile: CFE original copy.pdf26 Aug 2023
sources of funds to complete the projectFile: 20230826012035.pdf26 Aug 2023
reason for the delay in RERA registrationFile: 20230826012015.pdf26 Aug 2023
project's ongoing statusFile: lumen progress report.pdf26 Aug 2023
STP design drawing and STP demarcationFile: STP design drawing.pdf26 Aug 2023
profit and loss account and balance sheet 2022-23 with CA UDINFile: ITR FY 2022-23.pdf26 Aug 2023
project name and project address and upload the section 3(1) notarized affidavitFile: Affidavit on stamp paper.pdf26 Aug 2023
project name and project addressFile: lumen area statement.pdf26 Aug 2023
profit and loss account and balance sheet, 2020-21, 2021-22 & 2022-23File: Letter to KRERA.pdf26 Aug 2023
estimated cost of construction for civil works certified by the EngineerFile: lumen estimate.pdf26 Aug 2023
GST registration certificateFile: AA290222024712L_RC17022022.pdf11 Aug 2023
profit and loss accountFile: PL.pdf11 Aug 2023
balance sheetFile: BS.pdf11 Aug 2023
Bank account statementFile: Union bank- Bank Accounts.pdf11 Aug 2023
Loan sanction letterFile: Loan Sanction Letter BCCI.jpg11 Aug 2023
Title deed in the name of Roopa Supritha D Souza and Robert D SouzaFile: Purchase Deed - Lynal & Roopa.pdf11 Aug 2023
Title deed in the name of Roopa Supritha D Souza and Robert D SouzaFile: Purchase Deed - Robert Dsouza.pdf11 Aug 2023
ECFile: combined EC.pdf11 Aug 2023
RTCFile: RTC.pdf11 Aug 2023
Non litigation AffidavitFile: NON LITIGATION AFFIDAVIT20230803_11391791.pdf11 Aug 2023
certified Guidance value CertificateFile: SRO Lumen.pdf11 Aug 2023
Approved PlanFile: Recertified Plan as per the RERA Requirment - Copy.pdf11 Aug 2023
Form 9/11 (Single Plot)File: site plan.jpg11 Aug 2023
Form 9/11 (Single plot layout Order)File: Updated 9 N 11 - Lumen Dei (1).pdf11 Aug 2023
certified Carpet area calculationFile: carpet area calculations.pdf11 Aug 2023
village mapFile: combined village MAP.pdf11 Aug 2023
Architects detailsFile: Renewed Eng License.pdf11 Aug 2023
Architects certificateFile: Contractor N Arc -Graduation Cer - Sandeep.jpg11 Aug 2023
sanctioned drawings Floor plans, sectional drawings and elevationsFile: Recertified Plan as per the RERA Requirment - Copy.pdf11 Aug 2023
FAR -2.22File: Recertified Plan as per the RERA Requirment - Copy.pdf11 Aug 2023
sanction plan -Built up areaFile: Recertified Plan as per the RERA Requirment - Copy.pdf11 Aug 2023
sanction plan -Height of the buildingFile: Recertified Plan as per the RERA Requirment - Copy.pdf11 Aug 2023
approved drawingFile: Recertified Plan as per the RERA Requirment - Copy.pdf11 Aug 2023
Building LicenseFile: BUILDING LICENSE.jpg11 Aug 2023
KSPCB CFEFile: Adobe Scan Jul 31, 2023.pdf11 Aug 2023
STP design drawingFile: Recertified Plan as per the RERA Requirment - Copy.pdf11 Aug 2023
proforma of Allotment letterFile: ALLOTMENT LETTER20230803_12085993.pdf11 Aug 2023
estimated cost of construction for civil works certified by the EngineerFile: Lumen Dei - Estimation.pdf11 Aug 2023
RTC, survey 340/3-
Mutation, survey 340/3-
Encumbrance Certificate, survey 340/3-
Conversion/Alienation Order, survey 340/3-
Sale/Title/Gift Deed, survey 340/3-
Khatha, survey 340/3-
RTC, survey 340/3-
Mutation, survey 340/3-
Encumbrance Certificate, survey 340/3-
Conversion/Alienation Order, survey 340/3-
Sale/Title/Gift Deed, survey 340/3-
Khatha, survey 340/3-
Registration CertificateFile: AA290222024712L_RC17022022.pdf-
Certificate issued by CA Form 1File: Rera Form Reg01 (updated).pdf-
Certificate issued by Architect Form 2File: certificate by Architect.pdf-
Certificate issued by Engineer Form 3File: certificate by engineer.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: FORM B.PDF-

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one has not
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep LUMEN DEI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

Builder: RAJESH LAZAR DSOUZA

RAJESH LAZAR DSOUZA has 1 registration on RERA Karnataka, including LUMEN DEI. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if LUMEN DEI is delayed beyond 31 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of LUMEN DEI?

The registered promoter entity is RAJESH LAZAR DSOUZA, a proprietorship as per the filing. Its GSTIN 29BKSPD9673H1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in LUMEN DEI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at LUMEN DEI?

The professionals named in the filing: Architect: SANDEEP B; Engineer: SANDEEP B; Chartered Accountant: MAHESHA KUMARA K. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LUMEN DEI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LUMEN DEI. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LUMEN DEI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.