Home / Browse projects / Nagpur, Maharashtra / LOTUS RESIDENCY

Registered No litigation declared Others project

LOTUS RESIDENCY

By BHARAT DEVELOPERS

RG-MH-02161 · RERA P50500012602 · Last updated on MahaRERA portal: 15 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 96 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 96 months from the original
13 of 44Construction stages doneacross 4 buildings; furthest along: External plumbing and external plaster, 90%
72 of 78Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 129 documents Report an error

LOTUS RESIDENCY is a Others project by BHARAT DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500012602 on 6 Sep 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 96 months from the original filing. 6 of the 78 units on this registration are recorded sold or booked, and 13 of 44 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameLOTUS RESIDENCY
  • TypeOthers
  • Location
    • Butibori Road
    • Butibori
    • Nagpur (Rural)
    • Nagpur
    • 441122
  • Pincode441122
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500012602
  • ReraGenie IDRG-MH-02161

Builder

  • NameBHARAT DEVELOPERS
  • Entity typePartnership
  • PartnersHAJI FAROOK JEEKAR BAWLAKACHHI, DILAWAR INAYAT KHAN, PRASHANT BAPURAO ZULKANTIWAR
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredSep 2017First promiseDec 2019Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Sep 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2019)
  • Buildings4 building records
  • Documents filed129 files

Current status

8%6 of 78 units booked
53.6%Work done, per cost certificate

Figures as on 15 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA44161430
BUILDING BNA4416016
BUILDING CNA4416016
BUILDING DNA4416016

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is External plumbing and external plaster, at 90%.

BUILDING A89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
BUILDING B27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING C18%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,646 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Aug 2025

Approvals and building plan

Sanctioning authorityNagpur Improvement Trust
Permissible FSI1570.99
Proposed, not sanctioned1,571 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAMRAVATI ROAD WADI
Estimated costRs 9.38 cr
Cost incurredRs 5.03 cr
Work done53.64%
BuildingWingEstimatedIncurred
-NARs 4.69 crRs 2.52 cr
BUILDING ANARs 2.35 crRs 1.98 cr
BUILDING BNARs 2.35 crRs 53.63 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNITIN M ZADE
ArchitectJitendra Ingulkar
EngineerP S PATANKAR
EngineerJitendra Ingulkar
Chartered AccountantRishi Lashkare
Chartered Accountantravindra lashkare
PartnerRole in project
BHARAT DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500017106Dec 2019 → Dec 2027

Reason as filed by the promoterWith respect our residential-cum-commercial project named and styled as “LOTUS RESIDENCY”, Plot No. 2,3,4,5,6,9,10,11,12 and 13; Kh. No. 115, P.S.K. 74, Mouza - Bori; Tah. - Nagpur (Rural); Distt. - Nagpur, vide Project Registration Number as - P50500012602; due to the COVID-19 pandemic situation which prevailed in the country during the year 2019 to 2021, we could not get the project running and also we could not arrange the requisite funds for the project. In the recent time, we have arranged the requisite funds for the completion of the project. Hence, we hereby request your authority to ki

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC004000000030332SURENDRA HARNARAYAN PARIKHBharat Developers24/02/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed129

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1 march 2026- Bharat Developers.pdf15 Apr 2026
Withdrawal Update Form 2File: form 2 march 2026- Bharat Developers.pdf15 Apr 2026
Withdrawal Update Form 3File: form 3 MARCH 2026 - Bharat Developers.pdf15 Apr 2026
Withdrawal Update Form 1File: Form 1 - September 2025.pdf12 Jan 2026
Withdrawal Update Form 1File: Form 1 - September 2025.pdf12 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate -December 2025.pdf12 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate -December 2025.pdf12 Jan 2026
Withdrawal Update Form 3File: Form 3 CA Certificate -December 2025.pdf12 Jan 2026
Withdrawal Update Form 3File: Form 3 CA Certificate -December 2025.pdf12 Jan 2026
Form 2A (FY 2022-2023)File: Form 2A - Lotus Residency - 2022-23.pdf21 Nov 2025
Form 2A (FY 2023-2024)File: Form 2A - Lotus Residency - 2023-24.pdf21 Nov 2025
Form 2A (FY 2024-2025)File: Form 2A - Lotus Residency - 2024-25.pdf21 Nov 2025
Withdrawal Update Form 1File: Form 1 - September 2025.pdf10 Oct 2025
Withdrawal Update Form 2File: Form 2 - September 2025.pdf10 Oct 2025
Withdrawal Update Form 3File: Form 3 - September 2025.pdf10 Oct 2025
Form 5 (FY 2022-2023)File: FORM 5 - 2022-23.pdf30 Sep 2025
Form 5 (FY 2023-2024)File: Form 5 - 2023-24.pdf29 Sep 2025
Form 5 (FY 2024-2025)File: Form 5 - 2024-25.pdf29 Sep 2025
Withdrawal Update Form 1File: Architect Certificate - Lotus - June 2025.pdf28 Aug 2025
Withdrawal Update Form 2File: Engineer Certificate - Lotus - June 2025.pdf28 Aug 2025
Withdrawal Update Form 3File: CA Certificate - Lotus - June 2025.pdf28 Aug 2025
Form 1File: Lotus Residency - Form 1 - March 2025.pdf25 Aug 2025
Form 2File: Lotus Residency - Form 2 - March 2025.pdf25 Aug 2025
Form 3File: Lotus Residency - Form 3 - March 2025_compressed.pdf25 Aug 2025
Disclosure of Sold and Booked InventoryFile: Lotus Residency - Disclosure - March 2025.pdf25 Aug 2025
Form 1File: Form 1 - Lotus Residency - Sept 2023.pdf21 Aug 2025
Form 2File: Form 2 - Lotus Residency - Sept 2023.pdf21 Aug 2025
Form 3File: Form 3 - CA Certificate - Lotus Residency - Sept 2023.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - Sept 2023 - Lotus.pdf21 Aug 2025
Form 1File: Architect Certificate - Dec 2023.pdf21 Aug 2025
Form 2File: Engineer Certificate - Dec 2023.pdf21 Aug 2025
Form 3File: CA Certificate - Dec 2023.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold - Dec 2023.pdf21 Aug 2025
Form 1File: Architect Certificate - March 2024 (2).pdf21 Aug 2025
Form 2File: Engineer Certificate - March 2024 (2).pdf21 Aug 2025
Form 3File: CA Certificate - March 2024 (2)_compressed (1).pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold - March 2024 (2).pdf21 Aug 2025
Form 1File: Form 1 - June 2024.pdf21 Aug 2025
Form 2File: Form - 2 - June 2024.pdf21 Aug 2025
Form 3File: Form 3 - June 2024.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - June 2024.pdf21 Aug 2025
Form 1File: Lotus Residency - Form 1 - September 2024.pdf21 Aug 2025
Form 2File: Lotus Residency - Form 2 - September 2024.pdf21 Aug 2025
Form 3File: Lotus Residency - Form 3 - September 2024.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: Lotus Residency - Disclosure - September 2024.pdf21 Aug 2025
Form 1File: Lotus Residency - Form 1 - December 2024.pdf21 Aug 2025
Form 2File: Lotus Residency - Form 2 - December 2024.pdf21 Aug 2025
Form 3File: Lotus Residency - Form 3 - December 2024.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: Lotus Residecy - Disclosure - December 2024.pdf21 Aug 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Lotus Residency - Form 1 - December 2024.pdf4 Feb 2025
Certificates of CA (Form 3)File: Lotus Residency - Form 3 - December 2024_compressed.pdf4 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Lotus Residency - Form 2 - December 2024.pdf4 Feb 2025
Disclosure of sold/ booked inventoryFile: Lotus Residecy - Disclosure - December 2024.pdf4 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - June 2024.pdf18 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Lotus Residency - Form 1 - September 2024.pdf18 Dec 2024
Certificates of CA (Form 3)File: Form 3 - June 2024_compressed.pdf18 Dec 2024
Certificates of CA (Form 3)File: Lotus Residency - Form 3 - September 2024_compressed.pdf18 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 - June 2024.pdf18 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Lotus Residency - Form 2 - September 2024.pdf18 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure - June 2024.pdf18 Dec 2024
Disclosure of sold/ booked inventoryFile: Lotus Residency - Disclosure - September 2024.pdf18 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Lotus Residency - 2023-24.pdf17 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - March 2024 (2).pdf29 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - March 2024 (2).pdf29 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold - March 2024 (2).pdf29 Apr 2024
Certificates of CA (Form 3)File: CA Certificate - March 2024 (2)_compressed (1).pdf29 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Dec 2023.pdf2 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Dec 2023.pdf2 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold - Dec 2023.pdf2 Feb 2024
Certificates of CA (Form 3)File: CA Certificate - Dec 2023_compressed.pdf2 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Lotus Residency - Sept 2023.pdf7 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Lotus Residency - Sept 2023.pdf7 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory - Sept 2023 - Lotus.pdf7 Nov 2023
Certificates of CA (Form 3)File: Form 3 - CA Certificate - Lotus Residency - Sept 2023.pdf7 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Bharat Developers 22-23.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: D.pdf12 Jul 2023
Certificates of CA (Form 3)File: Form 3 CA Certificate Bharat Developers.pdf12 Jul 2023
PAN CardFile: PAN.pdf11 Jul 2023
Copy of the legal title reportFile: Legal Title Report 1.pdf11 Jul 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate - Finance.pdf11 Jul 2023

How this compares with Nagpur

8%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 96 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LOTUS RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Butibori2,800+ in Nagpur

2 kmLOTUS RESIDENCYCompleted 42Lapsed / revoked 19Other 51Dot size: filed unitsN

Filed coordinates, straight-line distance. 112 registered projects within 2 km.

Builder: BHARAT DEVELOPERS

BHARAT DEVELOPERS has 3 registrations on MahaRERA, including LOTUS RESIDENCY and The Province Phase I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if LOTUS RESIDENCY is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LOTUS RESIDENCY?

The registered promoter entity is BHARAT DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LOTUS RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against LOTUS RESIDENCY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for LOTUS RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LOTUS RESIDENCY?

The professionals named in the filing: Architect: NITIN M ZADE; Architect: Jitendra Ingulkar; Engineer: P S PATANKAR; Engineer: Jitendra Ingulkar; Chartered Accountant: Rishi Lashkare; Chartered Accountant: ravindra lashkare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LOTUS RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LOTUS RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LOTUS RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.