Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 0%
91 of 91Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

LOTUS PRIDE is a Commercial project by PANKAJ PANDHARINATH JAGE in Thane, Maharashtra, registered with MahaRERA as P51700077449 on 16 Aug 2024. Possession is promised by 31 Dec 2027. 0 of the 91 units on this registration are recorded sold or booked, and 0 of 33 construction stages are filed complete.

At a glance

Project

  • NameLOTUS PRIDE
  • TypeCommercial
  • Location
    • AGRA ROAD
    • Shahapur (CT)
    • Shahapur
    • Thane
    • 421601
  • Pincode421601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700077449
  • ReraGenie IDRG-MH-18160

Builder

  • NamePANKAJ PANDHARINATH JAGE
  • Entity typeIndividual

Key dates

this monthRegisteredAug 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Aug 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed91 files

Current status

0%0 of 91 units booked

Figures as on 2 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LOTUS PRIDE BUILDING 1 A WINGNA4463137
LOTUS PRIDE BUILDING NO 1 B WINGNA4412012
LOTUS PRIDE BUILDING NO 2NA8742042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 2 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.

LOTUS PRIDE BUILDING 1 A WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LOTUS PRIDE BUILDING NO 1 B WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LOTUS PRIDE BUILDING NO 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed121

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots121
Closed/Covered46
Open Space75

Land and ownership30

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,880 sq m
Land owned byThe promoter, with other names on the file
Named landowners30
LandownerVillageDistrict
VASUDEV PANDURANG PATKARShahapur (CT)Thane
PANKAJ PANDHARINATH JAGEShahapur (CT)Thane
KISAN PANDURANG PATKARmharalThane
GAJANAN SADASHIV PATKARShahapur (CT)Thane
ANKITA ANIL JAGEPanvelRaigarh
MAITHILI MANGESH BAPARDEKARDOMBIVLIThane
MANSI MANGESH PATHAREDOMBIVLIThane
PRASHANT SADASHIV PATKARShahapur (CT)Thane
PRAMOD MADAN PATKARBhiwandi (M Corp.)Thane
ANITA ASHOK MALBARIVada (CT)Palghar
VAIJAYANTI VASANT PATAKARShahapur (CT)Thane
CHHAYA VASANT PATKARShahapur (CT)Thane
SWARALI SANJAY MALBARIThane (M Corp.)Thane
MOHINI MOHAN SHETEBhiwandi (M Corp.)Thane
SHRIKANT VASANT PATKARShahapur (CT)Thane
RASHMI RAMENDRA PAVASKARDOMBIVLIThane
ARJUN DATTATRAY PATKARMurbadThane
SHUBHADA SUBHASH MHATREShahapur (CT)Thane
RAJENDRA DATTATRAY PATAKARShahapur (CT)Thane
ASHWINI ANIL DUGADEVada (CT)Palghar
NANDKUMAR DATTATRAY PATKARShahapur (CT)Thane
BHAVIN MAHESH SHAHMumbai CityMumbai City
PALLAVI VASANT GANGARMumbai CityMumbai City
KANCHAN KANTILAL ALASHIKalambheThane
GITA BALU DALALAmbeshiv BkThane
SANGITA DWARAKANATH PATHARIShahapur (CT)Thane
RAJSHREE RAJENDRA PENDURKARThane (M Corp.)Thane
HEMANT DWARAKANATH PATHARIShahapur (CT)Thane
ROWKESH DWARKANATH PATHAREShahapur (CT)Thane
VISHWANATH MAHADEV PATHARIShahapur (CT)Thane

Approvals and building plan

Sanctioning authorityNagar Panchayat Shahapur
Permissible FSI4339.15
Proposed, not sanctioned4,339 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS N 9 TO 11 SHRI NARAYAN CHS ASANGAON SHAHAPUR ROAD KALAMBE TAL SHAHAPUR DIST THANE PIN 421601

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKARAN M SHARMA
EngineerJAY M TALREJA
Chartered AccountantSUBER BOHARI
PartnerRole in project
PANKAJ PANDHARINATH JAGE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY BUILDING NO 1.pdf2 Jul 2025
Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY BUILDING NO 2 A WING.pdf2 Jul 2025
Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY BUILDING NO 2 B WING.pdf2 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect's Certificate.pdf12 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certificate.pdf12 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE NEW PLAN Final_compressed.pdf7 Jun 2025
Details of encumbrances concerned to FinanceFile: SELF DECLARATION NO ENCUMBRANCE.pdf3 May 2025
Declaration in FORM BFile: Form B.pdf3 May 2025
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY.pdf3 May 2025
CERSAI detailsFile: DECLARATION ON CERSAI.pdf3 May 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account.pdf3 May 2025
Details of encumbrances concerned to LegalFile: SELF DECLARATION NO ENCUMBRANCE.pdf3 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (1).pdf3 May 2025
Proforma of Allotment letterFile: ALLOTMENT LETTER format.pdf30 Apr 2025
Other - LegalFile: ANNEXURE A (1).pdf17 Apr 2025
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf17 Apr 2025
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf17 Apr 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement for Sale.pdf17 Apr 2025
PAN CardFile: Kanchan kantilal Alashi.pdf16 Apr 2025
PAN CardFile: Gita Dalal.pdf16 Apr 2025
PAN CardFile: Sangita Dwarkanath Pathari.pdf16 Apr 2025
PAN CardFile: Rajashree Rajendra Pendurakar.pdf16 Apr 2025
PAN CardFile: Hemant D Pathari.pdf16 Apr 2025
PAN CardFile: Rowkesh.pdf16 Apr 2025
PAN CardFile: Vishwanath m Pathari.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE OLD.pdf16 Apr 2025
PAN CardFile: Kanchan kantilal Alashi.pdf16 Apr 2025
PAN CardFile: Gita Dalal.pdf16 Apr 2025
PAN CardFile: Sangita Dwarkanath Pathari.pdf16 Apr 2025
PAN CardFile: Rajashree Rajendra Pendurakar.pdf16 Apr 2025
PAN CardFile: Hemant D Pathari.pdf16 Apr 2025
PAN CardFile: Rowkesh.pdf16 Apr 2025
PAN CardFile: Vishwanath m Pathari.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE OLD.pdf16 Apr 2025
Layout approvalFile: Building construction Plan 1.pdf2 Apr 2025
Layout approvalFile: Building Construction Plan 2.pdf2 Apr 2025
Layout approvalFile: Building Construction Plan 3.pdf2 Apr 2025
Copy of the legal title reportFile: Title Search Pankaj Jage 479-A-4.pdf2 Apr 2025
Copy of the legal title reportFile: Building Construction Plan 3.pdf2 Apr 2025
Copy of Layout Approval (in case of layout)File: Building construction Plan 1.pdf2 Apr 2025
Copy of Layout Approval (in case of layout)File: Building Construction Plan 2.pdf2 Apr 2025
Copy of Layout Approval (in case of layout)File: Building Construction Plan 3.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE NEW PLAN_compressed.pdf2 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf2 Apr 2025
Proforma of Agreement for saleFile: Proforma of Agreement for sale Pankaj Jage.pdf2 Apr 2025
Layout approvalFile: plan lotus pride.pdf13 Aug 2024
Layout approvalFile: plan lotus pride second copy.pdf13 Aug 2024
Copy of Layout Approval (in case of layout)File: plan lotus pride.pdf13 Aug 2024
Copy of Layout Approval (in case of layout)File: plan lotus pride second copy.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Lotus Pride.pdf12 Aug 2024
Proforma of Agreement for saleFile: Proforma of Agreement for sale Pankaj Jage.pdf2 Jul 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER format.pdf2 Jul 2024
Other - LegalFile: ANNEXURE A 50-2024.pdf2 Jul 2024
Declaration in FORM BFile: Affidavit cum Declaration Form B.pdf1 Jul 2024
PAN CardFile: Kisan Patkar.pdf25 Jun 2024
PAN CardFile: Gajanan Patkar.pdf25 Jun 2024
PAN CardFile: Ankita Jage.pdf25 Jun 2024
PAN CardFile: Maithili Bapardekar .pdf25 Jun 2024
PAN CardFile: Manasi Pathare.pdf25 Jun 2024
PAN CardFile: Prashant Patkar.pdf25 Jun 2024
PAN CardFile: Pramod Patkar.pdf25 Jun 2024
PAN CardFile: Anita Malbari.pdf25 Jun 2024
PAN CardFile: Vaijayanti Patkar .pdf25 Jun 2024
PAN CardFile: Chhaya Patkar.pdf25 Jun 2024
PAN CardFile: Swarali Malbari.pdf25 Jun 2024
PAN CardFile: Mohini Shete.pdf25 Jun 2024
PAN CardFile: Shrikant Patkar.pdf25 Jun 2024
PAN CardFile: Rashmi Pavaskar.pdf25 Jun 2024
PAN CardFile: Arjun Patkar .pdf25 Jun 2024
PAN CardFile: Shubhada Mhatre.pdf25 Jun 2024
PAN CardFile: Rajendra Patkar.pdf25 Jun 2024
PAN CardFile: Ashwini Dugade.pdf25 Jun 2024
PAN CardFile: Nandkumar Patkar.pdf25 Jun 2024
PAN CardFile: Vasudev Patkar.pdf25 Jun 2024
PAN CardFile: Pallavi Pan.pdf25 Jun 2024
PAN CardFile: Bhavin Pan.pdf25 Jun 2024
Building plan approvalFile: Commencement Certificate.pdf18 Jun 2024
PAN CardFile: PAN Pankaj Jage.pdf18 Jun 2024
Copy of the legal title reportFile: 479-A-4_compressed.pdf18 Jun 2024
Copy of the legal title reportFile: 479-A-5_compressed.pdf18 Jun 2024

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LOTUS PRIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AGRA ROAD7,600+ in Thane

2 kmLOTUS PRIDECompleted 21Lapsed / revoked 20Other 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 66 registered projects within 2 km.

Builder: PANKAJ PANDHARINATH JAGE

PANKAJ PANDHARINATH JAGE has 1 registration on MahaRERA, including LOTUS PRIDE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if LOTUS PRIDE is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LOTUS PRIDE?

The registered promoter entity is PANKAJ PANDHARINATH JAGE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LOTUS PRIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LOTUS PRIDE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LOTUS PRIDE?

The professionals named in the filing: Architect: KARAN M SHARMA; Engineer: JAY M TALREJA; Chartered Accountant: SUBER BOHARI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LOTUS PRIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LOTUS PRIDE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LOTUS PRIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.