  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Feb 2024Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 92 documents Report an error

Lotus Paradise Elite is a Commercial project by Lotus Properties in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/220523/004891 on 23 May 2022. Possession is promised by 28 Feb 2024. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameLotus Paradise Elite
  • TypeCommercial
  • Location
    • Mangalore
    • Dakshina Kannada
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1257/334/PR/220523/004891
  • ReraGenie IDRG-KA-88192

Builder

  • NameLotus Properties
  • Entity typePartnership Firm
  • Authorized SignatorySampath Kumar Shetty
  • DirectorJithendra S Kottary
  • Other registrations12 more →
  • Declared earlier projects23 →

Key dates

this monthRegisteredMay 2022First promiseFeb 2023Revised toFeb 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on23 May 2022
  • Promised completion28 Feb 2024
  • Revised completionRevised to 28 Feb 2024 (originally 28 Feb 2023)
  • Buildings1 building record
  • Documents filed92 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Lotus Paradise Elite---04040

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 28 Apr 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etcNot applicable
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 28 Apr 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership4

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area868 sq m
Named landowners4
LandownerVillageDistrict
Lotus Properties--
Aravind Kudgi Shenoy--
Avalon Lennox Patrao--
Paradise Properties--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 8.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMadhukar B
EngineerK.Anil Hegde

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1257/334/PR/230307/004891Feb 2023 → Feb 2024

Reason as filed by the promoterothers

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed92

As listed on the registration, under the names the promoter filed them with; the newest 80 of 92 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/220523/004891 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Please find the attached Sale deed between Lotus Properties & Paradise PropertiesFile: Sale Deed-compressed.pdf28 Apr 2022
Please find the attached E Khata between Lotus Properties & Paradise PropertiesFile: E -Khatha.PDF28 Apr 2022
Please find the attached proforma of AOS with payment plan notified by GOKFile: AOS.pdf28 Apr 2022
Please find the attached STP demarcated location site planFile: STP Site Plan.pdf28 Apr 2022
Please find the attached STP design & drawingsFile: STP Design Drawing.pdf28 Apr 2022
Please find the attached Mescom NOC notarised copy along with payment receiptFile: Mescom Noc - Attested with Payment Challan.pdf28 Apr 2022
1. bank account change - UPLOADEDFile: RERA Account.PDF19 Mar 2022
2. BALANCE SHEET 2018-19 - UPLOADEDFile: BS 2018-19.pdf19 Mar 2022
3. PROFIT & LOSS A/C 2018-19 - UPLOADEDFile: PL2018-19.pdf19 Mar 2022
4. ITR 2018-19 - UPLOADEDFile: ITR 2018-19.pdf19 Mar 2022
5. BALANCE SHEET 2019-20 - UPLOADEDFile: BS 2019-20.pdf19 Mar 2022
6. PROFIT & LOSS A/C 2019-20 - UPLOADEDFile: PL 2019-20.pdf19 Mar 2022
7. BALANCE SHEET 2020-21 - UPLOADEDFile: BS 2020-21.pdf19 Mar 2022
8. PROFIT & LOSS A/C 2020-21 - UPLOADEDFile: PL 2020-21.pdf19 Mar 2022
9.ITR 2021-22 - UPLOADEDFile: ITR 2021 22.pdf19 Mar 2022
10. CONVERSION ORDER FOR 12CENTS - UPLOADEDFile: Conversion Order - Revised.pdf19 Mar 2022
11. MOU - UPLOADEDFile: MOU- Elite .pdf19 Mar 2022
12. PARTNERSHIP DEED - UPLOADEDFile: Partnership Deed.pdf19 Mar 2022
13. WATER NOC - UPLOADEDFile: Water NOC.PDF19 Mar 2022
RERA BANK ACCOUNTFile: RERA Account - Lotus Paradise Elite.pdf28 Jun 2021
Approved PlanFile: Plan.pdf28 Jun 2021
BANK ACCOUNTFile: Bank Account Details - Elite.PDF19 May 2021
APPROVED PLANFile: Licence with Plan - Elite.pdf19 May 2021
AREA STATEMENT PLANFile: Plan Elite.pdf19 May 2021
AFFIDAVIT UNDER SEC3(1)File: affidavit.PDF19 May 2021
CertificateFile: Firm Registration -LP.PDF-
Architect Certificate for Work Completion Schedule till DateFile: EX 1 - Architect.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: EX 5 - Enginner.pdf-
CA Certificate for Funds UtilizationFile: Form-Ex3 Chartered Accountant Certificate For Fund Utilization.pdf-
Architect Certificate for Pending Work Completion Schedule.File: EX 2 - Architect.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Ex-6 - Engineer.pdf-
CA Certificate for Funds required for Project CompletionFile: Form-Ex4 Chartered Accountant Certificate For Fund Required.pdf-
AffidavitFile: Form B.pdf-
Latest Encumbrance CertificateFile: EC - Elite.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Licence - Lotus Paradise Elite_compressed-
Licence with Plan - Elite-
Licence with Plan - Elite-
New Agreement - (Rera)-
New Agreement - (Rera)-
RTC & Sale Deed - ELITE-
Plan Elite-
Site Plan Area-
ALLOTEMENT LETTER-
Elevation-
Specification LOTUS PARADISE ELITE-
EC - Elite-
Form B - Affidavit - Lotus Properties-
E -Khatha-
Sale Deed-
Sale Deed-
Conversion Order-
Unnamed document-
Unnamed document-
Unnamed document-
Reliquishment Deed-
Fire Noc_compressed_compressed-compressed-
Unnamed document-
Unnamed document-
Unnamed document-
KSPCB - Elite-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Plan Elite-
Plan Elite-
Single Site-
Unnamed document-
Balance Sheet 2018 - 2019File: Financial Statement FY 2019-20-LP.PDF-
Balance Sheet 2017 - 2018File: ITR & Statement of Income-18-19.PDF-
Audited Profit and Loss Statement 2018 - 2019File: Financial Statement FY 2019-20-LP.PDF-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
Lotus Galaxy-OngoingJul 2022Not delivered

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one moved by 12 months
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep Lotus Paradise Elite on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

2 kmLotus Paradise EliteOther 107Dot size: filed unitsN

Filed coordinates, straight-line distance. 107 registered projects within 2 km.

Builder: Lotus Properties

LOTUS PROPERTIES has 13 registrations on RERA Karnataka, including Lotus Kapila and Lotus Ananya. Its filings declare 23 earlier projects, 9 of them declared completed. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if Lotus Paradise Elite is delayed beyond 28 Feb 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Lotus Paradise Elite?

The registered promoter entity is Lotus Properties, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Lotus Paradise Elite?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Lotus Paradise Elite?

The professionals named in the filing: Architect: Madhukar B; Engineer: K.Anil Hegde. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Lotus Paradise Elite?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Lotus Paradise Elite. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Lotus Paradise Elite to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.