Home / Browse projects / Mumbai Suburban, Maharashtra / LODHA ETERNIS IDYLLIA B, SERENA B, NATURA B AND C
LODHA ETERNIS IDYLLIA B, SERENA B, NATURA B AND C
By MACROTECH DEVELOPERS LIMITED
RG-MH-08515 · RERA P51800000293 · Last updated on MahaRERA portal: 27 May 2024
Source: official MahaRERA filing
Red flags
- 3 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
LODHA ETERNIS IDYLLIA B, SERENA B, NATURA B AND C is a Residential / Group Housing project by MACROTECH DEVELOPERS LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800000293 on 13 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2018. 3 complaints are on record with the regulator.
At a glance
Project
- NameLODHA ETERNIS IDYLLIA B, SERENA B, NATURA B AND C
- TypeResidential / Group Housing
- Location
- .
- Andheri
- Mumbai Suburban
- 400093
- Pincode400093
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800000293
- ReraGenie IDRG-MH-08515
Builder
- NameMACROTECH DEVELOPERS LIMITED
- Entity typeCompany
- CINL45200MH1995PLC093041
- GSTIN27AAACL1490J1ZG
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorRAJENDRA LODHA
- Other registrations140 more →
- Completed126 of 141
- No longer live13 lapsed, de-registered or revoked
- Declared earlier projects6 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on13 Jul 2017
- Promised completion31 Dec 2018
- Revised completionNone
- Buildings4 building records
- Documents filed46 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| IDYLLIA B | NA | 12 | 0 | 0 | 0 | 0 |
| SERENA B | NA | 12 | 0 | 0 | 0 | 0 |
| NATURA B | NA | 12 | 0 | 0 | 0 | 0 |
| NATURA C | NA | 13 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 27 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
40 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Stilt Floor, at 0%.
IDYLLIA B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SERENA B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
NATURA B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
NATURA C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 27 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed193
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| IDYLLIA B | 35 | 35 |
| SERENA B | 39 | 39 |
| NATURA B | 76 | 76 |
| NATURA C | 43 | 43 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VILAS DESAI & ASSOCIATES |
| Engineer | K C SHAH CONSULTANTS |
| Chartered Accountant | B B JAIN & ASSOCIATES |
| Chartered Accountant | MSKA & ASSOCIATES |
| Partner | Role in project |
|---|---|
| LODHA DEVELOPERS LIMITED | - |
Litigation declared23
| Case | Court | Status |
|---|---|---|
| 466/2015 | Before Divisional Commissioner Konkan Division | Closed for Orders on Delay Application |
| 5215 to 5234/2016 | Bombay High Court | Pre Admission |
| 4124/2011 | Bombay High Court | Admitted |
| 2299/2015 | Bombay High Court | Pre Admission |
| 1313/2011 | Bombay High Court | Pre Admission |
| 8288/2014 | Bombay High Court | Pre Admission |
| 3335/1986 | City Civil Court Dindoshi | Directions |
| 3337 to 3341 /1986 | City Civil Court Dindoshi | Directions |
| 3343 TO 3345/1986 | City Civil Court Dindoshi | Directions |
| 3347/1986 | City Civil Court Dindoshi | Pre Admission |
| 3354 to 3366/1986 | City Civil Court Dindoshi | Directions |
| 3369/1986 | City Civil Court Dindoshi | Directions |
| 1238/2012 | City Civil Court Dindoshi | Notice of Motion for Reply Rejoinder |
| 1239/2012 | City Civil Court Dindoshi | Notice of Motion for Reply Rejoinder |
| 1714 to 1716/2016 | City Civil Court Dindoshi | Chamber Summons for Orders |
| 2388 - 2399/2016 | City Civil Court Dindoshi | Notice of Motion Hearing |
| 3767/2017 | City Civil Court Dindoshi | Notice of Motion for REPLY REJOINDER |
| 3462/2017 | City Civil Court Dindoshi | Notice of Motion Hearing |
| 705/2017 | Dindoshi Court | For Compliance |
| 20033/2019 | High Court | Pre Admission |
| 16819/2017 | High Court | Admitted Unready |
| 425/2019 | Dindoshi Court | For Notice of Motion reply or rejoinder |
| 14376/2019 | High Court | Pre Admission |
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000055807 | Mohit Arora | Lodha Impression Real Estate Pvt Ltd (Lodha Developers Pvt Ltd) | 30/09/2018 |
| CC006000000100407 | Larissa Fernandes | Lodha Impression Real Estate Pvt Ltd | 05/08/2019 |
| CC006000000110810 | BINOD PRASAD SINHA | LODHA IMPRESSION REAL ESTATE PVT LTD | 06/09/2019 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Jun 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Jul 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 19 Nov 2021
Documents filed46
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: Sold Unsold - LODHA ETERNIS - IDYLLIA B, SERENA B, NATURA B AND C - P51800000293 - March 2 | 27 May 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold - LODHA ETERNIS - IDYLLIA B, SERENA B, NATURA B AND C - P51800000293 - Dec23.p | 26 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: LODHA ETERNIS - IDYLLIA B, SERENA B, NATURA B AND C - P51800000293 - Sep23.pdf | 27 Dec 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Idyllia, Serena and Natura.pdf | 19 Nov 2021 |
| Form 2AFile: Lodha Eternis Idyllia B Serena B Natura B and C.pdf | 25 Aug 2020 |
| Details of encumbrancesFile: Lodha Eternis Idyllia Serena B Natura B and C.pdf | 11 Nov 2019 |
| Certificates of CA (Form 5)File: Lodha Eternis Idlliya B Serena B Natura B.pdf | 30 Sep 2019 |
| Details of encumbrancesFile: Eternis 2368.pdf | 19 Aug 2019 |
| Form 2AFile: ETERNIS 2 3 6 8.pdf | 17 Jun 2019 |
| OtherFile: LDL to MDL.pdf | 28 May 2019 |
| Details of encumbrancesFile: Eternis 2 3 6 8.pdf | 22 May 2019 |
| Details of encumbrancesFile: Eternis Idylia B Serena B Natura B C.pdf | 25 Feb 2019 |
| Certificates of Architect (Form 4)File: Lodha Eternis 2 3 6 8.pdf | 17 Jan 2019 |
| Details of encumbrancesFile: Eternis Idylia B Serena B Natura B and C.pdf | 16 Nov 2018 |
| Certificates of CA (Form 5)File: ETERNIS 2 3 6 8.pdf | 1 Oct 2018 |
| Details of encumbrancesFile: Eternis Idylia B, Serena A, Natura B C.pdf | 11 Aug 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 2018_07_18 Guffic_ 1 AND 2_ Full CC of Wing 4.pdf | 23 Jul 2018 |
| Details of encumbrancesFile: IDYLLA B SERENA B.pdf | 30 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Eternis CC.pdf | 19 Jan 2018 |
| Proforma of Allotment letterFile: ATS (Eternis) - v2 - 2 November 2017.pdf | 6 Nov 2017 |
| Building plan approvalFile: IOD_a.pdf | 7 Jul 2017 |
| Building plan approvalFile: IOD_b.pdf | 7 Jul 2017 |
| Building plan approvalFile: IOD_c.pdf | 7 Jul 2017 |
| Building plan approvalFile: IOD_d.pdf | 7 Jul 2017 |
| Building Plan Approval (IOD)File: IOD_a.pdf | 7 Jul 2017 |
| Building Plan Approval (IOD)File: IOD_b.pdf | 7 Jul 2017 |
| Building Plan Approval (IOD)File: IOD_c.pdf | 7 Jul 2017 |
| Building Plan Approval (IOD)File: IOD_d.pdf | 7 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eternis Idyllia B.pdf | 7 Jul 2017 |
| Layout approvalFile: Layout.pdf | 6 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 6 Jul 2017 |
| Declaration in FORM BFile: eternis bada.pdf | 6 Jul 2017 |
| Certificates of CA (Form 3)File: Segment 001 of Eternis Idyllia B Serena B, Natura B and C.pdf | 6 Jul 2017 |
| Certificates of CA (Form 3)File: Segment 002 of Segment 002 of Eternis Idyllia B Serena B, Natura B and C.pdf | 6 Jul 2017 |
| Certificates of CA (Form 3)File: Segment 003 of Segment 002 of Eternis Idyllia B Serena B, Natura B and C.pdf | 6 Jul 2017 |
| Certificates of CA (Form 3)File: Segment 004 of Eternis Idyllia B Serena B, Natura B and C.pdf | 6 Jul 2017 |
| Details of encumbrancesFile: Encumbrance Lodha Eternis Idyllia B, Serena B, Natura B and C.pdf | 3 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: One Lodha Eternis - Natura B,C, Serena B and Idyllia B - Form One.pdf | 1 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Two Lodha Eternis - Natura B,C, Serena B and Idyllia B - Form One.pdf | 1 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Three Lodha Eternis - Natura B,C, Serena B and Idyllia B - Form One.pdf | 1 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Four Lodha Eternis - Natura B,C, Serena B and Idyllia B - Form One.pdf | 1 Jul 2017 |
| Proforma of Allotment letterFile: ATS Amenities and Allotment Letter.pdf | 30 Jun 2017 |
| Building plan approvalFile: IODApproval.pdf | 24 Jun 2017 |
| Building Plan Approval (IOD)File: IODApproval.pdf | 24 Jun 2017 |
| PAN CardFile: LODHA IMPRESSION REAL ESTATE PRIVATE LIMITED.pdf | 23 Jun 2017 |
| Copy of the legal title reportFile: Title Report.pdf | 23 Jun 2017 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| PALAVA SAVANNA AND SIENA | KALYAN SHILPHATA ROAD | 423 | Completed | Aug 2020 | Sep 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 140 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 46 filed documents as one ZIP, foldered, with a manifest
Keep LODHA ETERNIS IDYLLIA B, SERENA B, NATURA B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near .6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 295 registered projects within 2 km.
INSPIRE RESIDENCY
SARDAR REALTY
MAHAKALI HILLS
Mohid Construction Co
ZENNITH
APEXBLISS INFRAVENTURES PRIVATE LIMITED
SHIVSAI SRA CHS
AARC REAL ESTATE DEVELOPERS PRIVATE LIMITE
SPLENDOR ESQUINA
SPLENDOR SRL PRIVATE LIMITED
93 PALLADIAN
Vijayalaxmi Builders & Contractors
See every Mumbai Suburban project, with the district possession charts
Builder: MACROTECH DEVELOPERS LIMITED
Macrotech Developers Limited has 141 registrations on MahaRERA, including LODHA BELMONDO ASHBRIDGE D, E and LODHA BELMONDO AUGUSTA B. Its filings disclose 6 earlier MahaRERA projects: declares 5 of 6 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if LODHA ETERNIS IDYLLIA B, SERENA B, NATURA B AND C is delayed beyond 31 Dec 2018?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of LODHA ETERNIS IDYLLIA B, SERENA B, NATURA B AND C?
The registered promoter entity is MACROTECH DEVELOPERS LIMITED, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in LODHA ETERNIS IDYLLIA B, SERENA B, NATURA B AND C?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against LODHA ETERNIS IDYLLIA B, SERENA B, NATURA B AND C?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for LODHA ETERNIS IDYLLIA B, SERENA B, NATURA B AND C?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at LODHA ETERNIS IDYLLIA B, SERENA B, NATURA B AND C?
The professionals named in the filing: Architect: VILAS DESAI & ASSOCIATES; Engineer: K C SHAH CONSULTANTS; Chartered Accountant: B B JAIN & ASSOCIATES; Chartered Accountant: MSKA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in LODHA ETERNIS IDYLLIA B, SERENA B, NATURA B AND C?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback