ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / LK DAMAYANTI RESIDENCY

Registered No litigation declared Residential / Group Housing project

LK DAMAYANTI RESIDENCY

By L K INFRASTRUCTURE PRIVATE LIMITED

RG-MH-74580 · RERA P52000016058 · Last updated on MahaRERA portal: 21 Jul 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 60 months
  • 3 extensions taken
  • Rs 10.00 crore secured on the land, in favour of ICICI Home Finance Co Ltd
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedmoved 60 months from the original
8 of 11Construction stages donefurthest along: Staircases, 95%
46 of 148Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 112 documents Report an error

LK DAMAYANTI RESIDENCY is a Residential / Group Housing project by L K INFRASTRUCTURE PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000016058 on 16 Apr 2018. Possession is promised by 31 Mar 2028. The completion date has moved by 60 months from the original filing. 102 of the 148 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameLK DAMAYANTI RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • PLOT NO. 10
    • SECTOR - 7
    • Taloje Panchnad
    • Panvel
    • Raigarh
    • 410218
  • Pincode410218
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000016058
  • ReraGenie IDRG-MH-74580

Builder

  • NameL K INFRASTRUCTURE PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsJAYSHRIBEN KAMLESHKUMAR PATEL, SANGITABEN PRADIPKUMAR PATEL
  • Other registrations2 more →
  • Completed1 of 3

Key dates

this monthRegisteredApr 2018First promiseMar 2023Revised toMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Apr 2018
  • Promised completion31 Mar 2028
  • Revised completionRevised to 31 Mar 2028 (originally 30 Mar 2023)
  • Buildings1 building record
  • Documents filed112 files

Current status

69%102 of 148 units booked
99.9%Work done, per cost certificate

Figures as on 21 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LK DAMAYANTI RESIDENCYNA971408148

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

LK DAMAYANTI RESIDENCY: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 21 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed35

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots35
Closed/Covered29
Open Space6

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,650 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofICICI Home Finance Co Ltd
Secured amountRs 10.00 crore
CERSAI search filedYes
Declared on5 Aug 2025

Approvals and building plan

Sanctioning authorityCity And Industrial Development Corporation of India
Permissible FSI3974.25
Proposed, not sanctioned3,974 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSTATE BANK OF INDIA, SME VASHI, APMC MARKET, CENTRAL FACILITY BUILDING II, MARKET II, NEAR JALARAM C
Estimated costRs 19.83 cr
Cost incurredRs 19.82 cr
Work done99.92%
BuildingWingEstimatedIncurred
LK DAMAYANTI RESIDENCYNARs 16.80 crRs 16.79 cr
-NARs 3.03 crRs 3.02 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTHE FIRM
ArchitectNeeraj Sanjay Bhandare
EngineerSHRAVANI CONSULTANTS
EngineerDILIP VADALIYA
Chartered AccountantSUDHIR PATEL & ASSOCIATES
Chartered AccountantSWATI SUDHENDU PATEL
Chartered Accountantvishal Dagriya
Chartered AccountantBhavik jayantilal Velani
PartnerRole in project
L K INFRASTRUCTURE PRIVATE LIMITED-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000019839Mar 2023 → Mar 2026

Reason as filed by the promoterCurrently, the project has achieved 95% completion in accordance with the original sanctioned plans. Upon previous extensions of the project, we specified March 29, 2024, as the projected completion date. However, considering the circumstances outlined below, we appeal to your esteemed authority to grant us an extension to complete the entire project and obtain the Occupation Certificate till 31.03.2026. We have applied for a ground + 9th floor amendment of CC at CIDCO on 07-11-2022. The copy of application for amendment of CC is attached for your reference. The original CC was received up to

EXT52000013874Mar 2023 → Mar 2024

Reason as filed by the promoterThe Project has been delayed on account of various reasons beyond our control and more particularly due to procedural delay in operations of various Govt. Deptt. In obtaining NOCs required for OC and due to Lockdown announced on account of pandemic of Covid-19. Due to this unprecedented crises, we have witnessed the reverse migration of labourers and shortage of liquidity in the market. Moreover various private and Government offices have not been working at full strength and the complete supply chain were broken down during last two years.

EA05032620099Mar 2023 → Mar 2028

Reason as filed by the promoterCurrently, the project has achieved 95% completion in accordance with the original sanctioned plans. Upon previous extensions of the project, we specified March 31, 2026, as the projected completion date. However, considering the circumstances outlined below, we appeal to your esteemed authority to grant us an extension to complete the entire project and obtain the Occupation Certificate till 31.03.2028. We have applied for a ground + 9th floor amendment of CC at CIDCO on 07-11-2022. The copy of application for amendment of CC is attached for your reference. As we said in our previous extensio

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000171866Anita BediAnita Prakash Bedi19/12/2019
CC12401092Imran Rashid ShaikhL K INFRASTRUCTURE PRIVATE LIMITED10/12/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Mar 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Apr 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Apr 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed112

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf21 Jul 2026
Withdrawal Update Form 2File: LK DAMAYANTI RERA .pdf21 Jul 2026
Withdrawal Update Form 3File: LK Damayanti Project - FORM 3 Q-1.pdf21 Jul 2026
Form 5 (FY 2025-2026)File: LK Damayanti -16058.pdf16 Jun 2026
Withdrawal Update Form 1File: Withdrawal Application Form1-Signed.pdf24 Apr 2026
Withdrawal Update Form 2File: Form 2 - Signed.pdf24 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf24 Apr 2026
Form 2A (FY 2024-2025)File: FORM 2A - FY 2024-25.pdf12 Mar 2026
Form 2A (FY 2019-2020)File: FORM 2A - FY 2019-20.pdf12 Mar 2026
Form 2A (FY 2020-2021)File: FORM 2A - FY 2020-21.pdf12 Mar 2026
Form 2A (FY 2021-2022)File: FORM 2A - FY 2021-22.pdf12 Mar 2026
Form 2A (FY 2022-2023)File: FORM 2A - FY 2022-23.pdf12 Mar 2026
Form 2A (FY 2023-2024)File: FORM 2A - FY 2023-24.pdf12 Mar 2026
Form 2A (FY 2018-2019)File: FORM 2A - FY 2018-19.pdf12 Mar 2026
Form 5 (FY 2023-2024)File: Form 5 Annual Report FY 2023-24.pdf11 Mar 2026
Form 5 (FY 2021-2022)File: Form 5 Annual Report FY 2021-22.pdf11 Mar 2026
Form 5 (FY 2020-2021)File: Form 5 Annual Report FY 2020-21.pdf11 Mar 2026
Form 5 (FY 2019-2020)File: Form 5 Annual Report FY 2019-20.pdf11 Mar 2026
Form 5 (FY 2018-2019)File: Form 5 Annual Report FY 2018-19.pdf11 Mar 2026
Form 5 (FY 2022-2023)File: Form 5 Annual Report FY 2022-23.pdf10 Mar 2026
Withdrawal Update Form 1File: FORM 1 SIGNED.pdf14 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf14 Jan 2026
Withdrawal Update Form 3File: FORM 3.pdf14 Jan 2026
Withdrawal Update Form 1File: FORM 1.pdf15 Nov 2025
Withdrawal Update Form 2File: Form 2.pdf15 Nov 2025
Withdrawal Update Form 3File: Form 3_Signed.pdf15 Nov 2025
Form 5 (FY 2024-2025)File: Scan Form-5 LKPVL 6058.pdf8 Oct 2025
Withdrawal Update Form 1File: FORM1 30 06 2025 signed.pdf7 Aug 2025
Withdrawal Update Form 2File: Form 2 30 06 2025 signed NEW.pdf7 Aug 2025
Withdrawal Update Form 3File: Form 3 final.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory - 31-03-2025.pdf30 Jul 2025
Form 1File: FORM1 Architect Certificate 31 03 2025 signed.pdf30 Jul 2025
Form 2File: Form 2 31 03 2025 signed.pdf30 Jul 2025
Form 3File: Form 3 Signed final.pdf30 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory - 31-12-2024.pdf23 Jul 2025
Form 1File: FORM 1 - Architech Certificate.pdf23 Jul 2025
Form 2File: FORM 2 - Engineer Certificate.pdf23 Jul 2025
Form 3File: FORM 3 - CA Certificate.pdf23 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - Architech Certificate.pdf8 Mar 2025
Certificates of CA (Form 3)File: FORM 3 - CA Certificate_.pdf8 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - Engineer Certificate.pdf8 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 30-09-2024.pdf8 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 31-12-2024.pdf8 Feb 2025
Declaration in FORM BFile: FORM-B DECLARATION Promoter.pdf6 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - Architech Certificate.pdf6 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - Engineer Certificate - 25-05-2024.pdf6 Jun 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 31-05-2024.pdf6 Jun 2024
Certificates of CA (Form 3)File: FORM 3 - CA Certificate - 28-05-2024.pdf6 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 FY_23-24 ANNUAL REPORT.pdf6 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - ENGINEER’S CERTIFICATE - FY 2023-24.pdf29 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 31-03-2024.pdf9 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - ENGINEER’S CERTIFICATE - FY 2022-23.pdf5 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 30-06-2021.pdf5 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 30-09-2021.pdf5 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 31-12-2021.pdf5 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 31-03-2022.pdf5 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 30-06-2022.pdf5 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 30-09-2022.pdf5 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 31-03-2023.pdf5 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 30-06-2023.pdf5 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 30-09-2023.pdf5 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 31-12-2023.pdf5 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5_ FY 2022-23_ LK Damayanti Residency.pdf10 Nov 2023
Details of encumbrances concerned to FinanceFile: Encumbrance - Legal.pdf14 Feb 2023
Details of encumbrances concerned to FinanceFile: Encumbrance - Finance.pdf14 Feb 2023
Details of encumbrances concerned to LegalFile: Encumbrance - Legal.pdf14 Feb 2023
Details of encumbrances concerned to LegalFile: Encumbrance - Finance.pdf14 Feb 2023
Declaration about Commencement CertificateFile: Declaration abot Commencement Certificate.pdf14 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM-2A - Quality Assurance Certificate (FY 2021-22).pdf14 Feb 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Booked Inventory.pdf14 Feb 2023
CERSAI detailsFile: CERSAI.pdf14 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf14 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Seprate Bank Account.pdf14 Feb 2023
Deviation Report with respect to Allotment letterFile: Davition Report of Allotment Letter.pdf14 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Davition Report model copy of Agreement.pdf14 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA FORM 5 - LK DAMAYNTI RESIDENCY_FY 2021-22.pdf15 Dec 2022
Proforma of Agreement for saleFile: Agreement for sale DRAFT.pdf15 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RERA FORM-5 - LK Damayanti Residency (FY 2021-21).pdf21 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 LKIPL.pdf12 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2A (FY2019-20).pdf23 Jul 2021

How this compares with Raigarh

69%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 60 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LK DAMAYANTI RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SECTOR - 75,900+ in Raigarh

2 kmLK DAMAYANTI RESIDENCYCompleted 41Lapsed / revoked 12Other 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 95 registered projects within 2 km.

Builder: L K INFRASTRUCTURE PRIVATE LIMITED

L K INFRASTRUCTURE PRIVATE LIMITED has 3 registrations on MahaRERA, including L. K. EXOTICA and LK DAMAYANTI RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if LK DAMAYANTI RESIDENCY is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LK DAMAYANTI RESIDENCY?

The registered promoter entity is L K INFRASTRUCTURE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LK DAMAYANTI RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against LK DAMAYANTI RESIDENCY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for LK DAMAYANTI RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LK DAMAYANTI RESIDENCY?

The professionals named in the filing: Architect: THE FIRM; Architect: Neeraj Sanjay Bhandare; Engineer: SHRAVANI CONSULTANTS; Engineer: DILIP VADALIYA; Chartered Accountant: SUDHIR PATEL & ASSOCIATES; Chartered Accountant: SWATI SUDHENDU PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LK DAMAYANTI RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LK DAMAYANTI RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LK DAMAYANTI RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.