Home / Browse projects / Raigarh, Maharashtra / LK DAMAYANTI RESIDENCY
LK DAMAYANTI RESIDENCY
By L K INFRASTRUCTURE PRIVATE LIMITED
RG-MH-74580 · RERA P52000016058 · Last updated on MahaRERA portal: 21 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 2 complaints at MahaRERA
- Completion date moved by 60 months
- 3 extensions taken
- Rs 10.00 crore secured on the land, in favour of ICICI Home Finance Co Ltd
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
LK DAMAYANTI RESIDENCY is a Residential / Group Housing project by L K INFRASTRUCTURE PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000016058 on 16 Apr 2018. Possession is promised by 31 Mar 2028. The completion date has moved by 60 months from the original filing. 102 of the 148 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameLK DAMAYANTI RESIDENCY
- TypeResidential / Group Housing
- Location
- PLOT NO. 10
- SECTOR - 7
- Taloje Panchnad
- Panvel
- Raigarh
- 410218
- Pincode410218
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000016058
- ReraGenie IDRG-MH-74580
Builder
- NameL K INFRASTRUCTURE PRIVATE LIMITED
- Entity typeCompany
- DirectorsJAYSHRIBEN KAMLESHKUMAR PATEL, SANGITABEN PRADIPKUMAR PATEL
- Other registrations2 more →
- Completed1 of 3
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 Apr 2018
- Promised completion31 Mar 2028
- Revised completionRevised to 31 Mar 2028 (originally 30 Mar 2023)
- Buildings1 building record
- Documents filed112 files
Current status
Figures as on 21 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| LK DAMAYANTI RESIDENCY | NA | 9 | 7 | 140 | 8 | 148 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 21 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.
LK DAMAYANTI RESIDENCY: 90% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 21 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 90% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed35
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| LK DAMAYANTI RESIDENCY | NA | Rs 16.80 cr | Rs 16.79 cr |
| - | NA | Rs 3.03 cr | Rs 3.02 cr |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | THE FIRM |
| Architect | Neeraj Sanjay Bhandare |
| Engineer | SHRAVANI CONSULTANTS |
| Engineer | DILIP VADALIYA |
| Chartered Accountant | SUDHIR PATEL & ASSOCIATES |
| Chartered Accountant | SWATI SUDHENDU PATEL |
| Chartered Accountant | vishal Dagriya |
| Chartered Accountant | Bhavik jayantilal Velani |
| Partner | Role in project |
|---|---|
| L K INFRASTRUCTURE PRIVATE LIMITED | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterCurrently, the project has achieved 95% completion in accordance with the original sanctioned plans. Upon previous extensions of the project, we specified March 29, 2024, as the projected completion date. However, considering the circumstances outlined below, we appeal to your esteemed authority to grant us an extension to complete the entire project and obtain the Occupation Certificate till 31.03.2026. We have applied for a ground + 9th floor amendment of CC at CIDCO on 07-11-2022. The copy of application for amendment of CC is attached for your reference. The original CC was received up to
Reason as filed by the promoterThe Project has been delayed on account of various reasons beyond our control and more particularly due to procedural delay in operations of various Govt. Deptt. In obtaining NOCs required for OC and due to Lockdown announced on account of pandemic of Covid-19. Due to this unprecedented crises, we have witnessed the reverse migration of labourers and shortage of liquidity in the market. Moreover various private and Government offices have not been working at full strength and the complete supply chain were broken down during last two years.
Reason as filed by the promoterCurrently, the project has achieved 95% completion in accordance with the original sanctioned plans. Upon previous extensions of the project, we specified March 31, 2026, as the projected completion date. However, considering the circumstances outlined below, we appeal to your esteemed authority to grant us an extension to complete the entire project and obtain the Occupation Certificate till 31.03.2028. We have applied for a ground + 9th floor amendment of CC at CIDCO on 07-11-2022. The copy of application for amendment of CC is attached for your reference. As we said in our previous extensio
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000171866 | Anita Bedi | Anita Prakash Bedi | 19/12/2019 |
| CC12401092 | Imran Rashid Shaikh | L K INFRASTRUCTURE PRIVATE LIMITED | 10/12/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Mar 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Apr 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Apr 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2028
Documents filed112
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 21 Jul 2026 |
| Withdrawal Update Form 2File: LK DAMAYANTI RERA .pdf | 21 Jul 2026 |
| Withdrawal Update Form 3File: LK Damayanti Project - FORM 3 Q-1.pdf | 21 Jul 2026 |
| Form 5 (FY 2025-2026)File: LK Damayanti -16058.pdf | 16 Jun 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1-Signed.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 - Signed.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 24 Apr 2026 |
| Form 2A (FY 2024-2025)File: FORM 2A - FY 2024-25.pdf | 12 Mar 2026 |
| Form 2A (FY 2019-2020)File: FORM 2A - FY 2019-20.pdf | 12 Mar 2026 |
| Form 2A (FY 2020-2021)File: FORM 2A - FY 2020-21.pdf | 12 Mar 2026 |
| Form 2A (FY 2021-2022)File: FORM 2A - FY 2021-22.pdf | 12 Mar 2026 |
| Form 2A (FY 2022-2023)File: FORM 2A - FY 2022-23.pdf | 12 Mar 2026 |
| Form 2A (FY 2023-2024)File: FORM 2A - FY 2023-24.pdf | 12 Mar 2026 |
| Form 2A (FY 2018-2019)File: FORM 2A - FY 2018-19.pdf | 12 Mar 2026 |
| Form 5 (FY 2023-2024)File: Form 5 Annual Report FY 2023-24.pdf | 11 Mar 2026 |
| Form 5 (FY 2021-2022)File: Form 5 Annual Report FY 2021-22.pdf | 11 Mar 2026 |
| Form 5 (FY 2020-2021)File: Form 5 Annual Report FY 2020-21.pdf | 11 Mar 2026 |
| Form 5 (FY 2019-2020)File: Form 5 Annual Report FY 2019-20.pdf | 11 Mar 2026 |
| Form 5 (FY 2018-2019)File: Form 5 Annual Report FY 2018-19.pdf | 11 Mar 2026 |
| Form 5 (FY 2022-2023)File: Form 5 Annual Report FY 2022-23.pdf | 10 Mar 2026 |
| Withdrawal Update Form 1File: FORM 1 SIGNED.pdf | 14 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 14 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 14 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 15 Nov 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 15 Nov 2025 |
| Withdrawal Update Form 3File: Form 3_Signed.pdf | 15 Nov 2025 |
| Form 5 (FY 2024-2025)File: Scan Form-5 LKPVL 6058.pdf | 8 Oct 2025 |
| Withdrawal Update Form 1File: FORM1 30 06 2025 signed.pdf | 7 Aug 2025 |
| Withdrawal Update Form 2File: Form 2 30 06 2025 signed NEW.pdf | 7 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 final.pdf | 7 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory - 31-03-2025.pdf | 30 Jul 2025 |
| Form 1File: FORM1 Architect Certificate 31 03 2025 signed.pdf | 30 Jul 2025 |
| Form 2File: Form 2 31 03 2025 signed.pdf | 30 Jul 2025 |
| Form 3File: Form 3 Signed final.pdf | 30 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory - 31-12-2024.pdf | 23 Jul 2025 |
| Form 1File: FORM 1 - Architech Certificate.pdf | 23 Jul 2025 |
| Form 2File: FORM 2 - Engineer Certificate.pdf | 23 Jul 2025 |
| Form 3File: FORM 3 - CA Certificate.pdf | 23 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - Architech Certificate.pdf | 8 Mar 2025 |
| Certificates of CA (Form 3)File: FORM 3 - CA Certificate_.pdf | 8 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - Engineer Certificate.pdf | 8 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 30-09-2024.pdf | 8 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 31-12-2024.pdf | 8 Feb 2025 |
| Declaration in FORM BFile: FORM-B DECLARATION Promoter.pdf | 6 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - Architech Certificate.pdf | 6 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - Engineer Certificate - 25-05-2024.pdf | 6 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 31-05-2024.pdf | 6 Jun 2024 |
| Certificates of CA (Form 3)File: FORM 3 - CA Certificate - 28-05-2024.pdf | 6 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 FY_23-24 ANNUAL REPORT.pdf | 6 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - ENGINEER’S CERTIFICATE - FY 2023-24.pdf | 29 May 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 31-03-2024.pdf | 9 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - ENGINEER’S CERTIFICATE - FY 2022-23.pdf | 5 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 30-06-2021.pdf | 5 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 30-09-2021.pdf | 5 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 31-12-2021.pdf | 5 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 31-03-2022.pdf | 5 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 30-06-2022.pdf | 5 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 30-09-2022.pdf | 5 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 31-03-2023.pdf | 5 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 30-06-2023.pdf | 5 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 30-09-2023.pdf | 5 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - 31-12-2023.pdf | 5 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5_ FY 2022-23_ LK Damayanti Residency.pdf | 10 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance - Legal.pdf | 14 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance - Finance.pdf | 14 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance - Legal.pdf | 14 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance - Finance.pdf | 14 Feb 2023 |
| Declaration about Commencement CertificateFile: Declaration abot Commencement Certificate.pdf | 14 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM-2A - Quality Assurance Certificate (FY 2021-22).pdf | 14 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Booked Inventory.pdf | 14 Feb 2023 |
| CERSAI detailsFile: CERSAI.pdf | 14 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf | 14 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Seprate Bank Account.pdf | 14 Feb 2023 |
| Deviation Report with respect to Allotment letterFile: Davition Report of Allotment Letter.pdf | 14 Feb 2023 |
| Deviation Report with respect to model copy of AgreementFile: Davition Report model copy of Agreement.pdf | 14 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA FORM 5 - LK DAMAYNTI RESIDENCY_FY 2021-22.pdf | 15 Dec 2022 |
| Proforma of Agreement for saleFile: Agreement for sale DRAFT.pdf | 15 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RERA FORM-5 - LK Damayanti Residency (FY 2021-21).pdf | 21 Mar 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 LKIPL.pdf | 12 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2A (FY2019-20).pdf | 23 Jul 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 112 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep LK DAMAYANTI RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SECTOR - 75,900+ in Raigarh
Filed coordinates, straight-line distance. 95 registered projects within 2 km.
Plot No -77 Sector -17 Kalamboli Bus Depot
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
BHAVESHWAR AQUA - 1
BHAVESHWAR INFRATECH
ETERNIA
GREENSCAPE DEVELOPERS PRIVATE LIMITED
MONARCH BROOKEFIELDS
MONARCH BROOKEFIELDS LLP
BHAVESHWAR AQUA - 2
BHAVESHWAR INFRATECH
OM REGENCY
OSCAR INFRASTRUCTURE PRIVATE LIMITED
See every Raigarh project, with the district possession charts
Builder: L K INFRASTRUCTURE PRIVATE LIMITED
L K INFRASTRUCTURE PRIVATE LIMITED has 3 registrations on MahaRERA, including L. K. EXOTICA and LK DAMAYANTI RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if LK DAMAYANTI RESIDENCY is delayed beyond 31 Mar 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of LK DAMAYANTI RESIDENCY?
The registered promoter entity is L K INFRASTRUCTURE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in LK DAMAYANTI RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against LK DAMAYANTI RESIDENCY?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for LK DAMAYANTI RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at LK DAMAYANTI RESIDENCY?
The professionals named in the filing: Architect: THE FIRM; Architect: Neeraj Sanjay Bhandare; Engineer: SHRAVANI CONSULTANTS; Engineer: DILIP VADALIYA; Chartered Accountant: SUDHIR PATEL & ASSOCIATES; Chartered Accountant: SWATI SUDHENDU PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in LK DAMAYANTI RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback