LEVERAGE GREEN HEIGHTS WING A
RG-MH-95506 · RERA P50500049151 · Last updated on MahaRERA portal: 6 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
LEVERAGE GREEN HEIGHTS WING A is a Residential / Group Housing project by LEVERAGE REALITIES in Nagpur, Maharashtra, registered with MahaRERA as P50500049151 on 1 Feb 2023. Possession is promised by 31 Dec 2027. 44 of the 96 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameLEVERAGE GREEN HEIGHTS WING A
- TypeResidential / Group Housing
- Location
- NAGPUR
- SHANKARPUR
- Nagpur (Rural)
- 441108
- Pincode441108
- RERA no.P50500049151
- ReraGenie IDRG-MH-95506
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on1 Feb 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed67 files
Current status
Figures as on 6 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| LEVERAGE GREEN HEIGHTS WING A | NA | 17 | 17 | 96 | 0 | 96 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.
LEVERAGE GREEN HEIGHTS WING A: 55% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 30% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Progress on shared amenities15
As on 6 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 20% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 20% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed211
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| LEVERAGE GREEN HEIGHTS WING A | NA | Rs 23.23 cr | Rs 9.76 cr |
| - | NA | Rs 2.77 cr | Rs 1.13 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PARAG KOTWAL |
| Engineer | PS PATANKAR |
| Engineer | JAYANT KADHAO |
| Chartered Accountant | KARTIK KEJDIWAL |
| Partner | Role in project |
|---|---|
| LEVERAGE REALITIES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Jan 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Jan 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed67
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: LR Wing A.pdf | 6 Feb 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (2).pdf | 6 Feb 2026 |
| Withdrawal Update Form 3File: WING A 30-09-25_merged.pdf | 6 Feb 2026 |
| Withdrawal Update Form 1File: Wing A.pdf | 24 Aug 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 24 Aug 2025 |
| Withdrawal Update Form 3File: WING A CA CERTIFICATE 30062025.pdf | 24 Aug 2025 |
| Disclosure of sold/ booked inventoryFile: Wing - A Receipt up to 31-03-25.pdf | 20 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate A Wing.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enigineer Certificate Wing A.pdf | 18 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Wing A.pdf | 8 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 02022024.pdf | 25 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 21122024.pdf | 25 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Wing A Architech Certificate.pdf | 5 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Wing - A Receipt up to 30-09-24.pdf | 2 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Certificate A Wing.pdf | 1 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: WING A FORM 1.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: WING A.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA CERTIFICATE.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: WING A.pdf | 5 Sep 2023 |
| Declaration in FORM BFile: WING A.pdf | 11 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (2).pdf | 24 Jan 2023 |
| Building plan approvalFile: Map compressed.pdf | 23 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Map compressed.pdf | 23 Jan 2023 |
| Declaration about Commencement CertificateFile: CC A.pdf | 23 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: Non Encumbrance_Financial.pdf | 18 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: A ALL.pdf | 18 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Non Encumbrance_Financial.pdf | 18 Jan 2023 |
| Details of encumbrances concerned to LegalFile: A ALL.pdf | 18 Jan 2023 |
| Copy of the legal title reportFile: Title Verification Report_compressed.pdf | 17 Jan 2023 |
| Copy of the legal title reportFile: PHOTO-2023-01-17-16-25-58.pdf | 17 Jan 2023 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 17 Jan 2023 |
| Building plan approvalFile: Plot Area.pdf | 16 Jan 2023 |
| Building plan approvalFile: Parking Area.pdf | 16 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plot Area.pdf | 16 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Parking Area.pdf | 16 Jan 2023 |
| Other - TechnicalFile: Annexure A (1).pdf | 16 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: WING A.pdf | 14 Jan 2023 |
| Copy of the legal title reportFile: FLOW.pdf | 12 Jan 2023 |
| Proforma of Agreement for saleFile: ATS WING A.pdf | 12 Jan 2023 |
| Proforma of Agreement for saleFile: 1ST.pdf | 12 Jan 2023 |
| Proforma of Agreement for saleFile: 3RD.pdf | 12 Jan 2023 |
| Proforma of Agreement for saleFile: 4TH.pdf | 12 Jan 2023 |
| Proforma of Allotment letterFile: Allotment Letter Wing A_compressed.pdf | 12 Jan 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter Wing A.pdf | 12 Jan 2023 |
| Other - FinanceFile: Undertaking Wing A.pdf | 11 Jan 2023 |
| Other - FinanceFile: Asset Based Search.pdf | 9 Jan 2023 |
| Building plan approvalFile: BUILDING PERMIT1-4.pdf | 7 Jan 2023 |
| Layout approvalFile: BP5-6-1.pdf | 7 Jan 2023 |
| Building plan approvalFile: BP5-6-2.pdf | 7 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: BP5-6-1.pdf | 7 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PERMIT1-4.pdf | 7 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BP5-6-2.pdf | 7 Jan 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMIT1-4.pdf | 7 Jan 2023 |
| CERSAI detailsFile: Non encumbrance_Financial.pdf | 7 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: WING A_compressed.pdf | 7 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: WING A.pdf | 7 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Form B_Wing A_compressed.pdf | 7 Jan 2023 |
| Proforma of Agreement for saleFile: ATS_Wing A_compressed.pdf | 7 Jan 2023 |
| PAN CardFile: Leverage Realities Pan Card.pdf | 6 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: Non encumbrance_Financial.pdf | 6 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Non encumbrance_Financial.pdf | 6 Jan 2023 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf | 6 Jan 2023 |
| Declaration in FORM BFile: Form B_Wing A_compressed.pdf | 6 Jan 2023 |
| Proforma of Allotment letterFile: Allotment Letter_compressed.pdf | 6 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Ac.pdf | 6 Jan 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation_Allotment Letter.pdf | 6 Jan 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation ATS Wing A.pdf | 6 Jan 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations, which the RERA portal never shows together
- All 67 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep LEVERAGE GREEN HEIGHTS WING A on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SHANKARPUR2,800+ in Nagpur
Kanher Nagri Developers
KANHER NAGRI DEVELOPERS
MAHALAXMI NAGAR 6
MAHALAXMI ESTATE
MAHALAXMI NAGAR 4
PADMALAXMI DEVELOPERS
Moreshwar park 4
PRASANNA PLANNERS
PRIME PLATINUM
UMAKANT VITTHAL MENDHE
MAULI NAGAR 8
MAULI INFRATECH
See every Nagpur project, with the district possession charts
Builder: LEVERAGE REALITIES
LEVERAGE REALITIES has 4 registrations on MahaRERA, including LEVERAGE GREEN HEIGHTS WING A and LEVERAGE GREEN HEIGHTS WING B. Its filings disclose 3 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if LEVERAGE GREEN HEIGHTS WING A is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of LEVERAGE GREEN HEIGHTS WING A?
The registered promoter entity is LEVERAGE REALITIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in LEVERAGE GREEN HEIGHTS WING A?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for LEVERAGE GREEN HEIGHTS WING A?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at LEVERAGE GREEN HEIGHTS WING A?
The professionals named in the filing: Architect: PARAG KOTWAL; Engineer: PS PATANKAR; Engineer: JAYANT KADHAO; Chartered Accountant: KARTIK KEJDIWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in LEVERAGE GREEN HEIGHTS WING A?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback