Home / Browse projects / Raigarh, Maharashtra / Laxmi Raghunath Niwas

Completed No litigation declared Mixed project

Laxmi Raghunath Niwas

By ELEGANCE BUILDCON

RG-MH-93969 · RERA P52000048908 · Last updated on MahaRERA portal: 25 Apr 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
11 of 11Construction stages doneacross 2 buildings; every applicable stage filed complete
0 of 1Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

Laxmi Raghunath Niwas is a Mixed project by ELEGANCE BUILDCON in Raigarh, Maharashtra, registered with MahaRERA as P52000048908 on 24 Jan 2023. The registration is recorded completed; possession was promised by 31 Dec 2025. 1 of the 1 unit on this registration is recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameLaxmi Raghunath Niwas
  • TypeMixed
  • Location
    • M G Road
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000048908
  • ReraGenie IDRG-MH-93969

Builder

  • NameELEGANCE BUILDCON
  • Entity typePartnership
  • PartnersAshok Dharma Mhatre, Keshav Pandurang Sonawane, Vijay Dattatray Kharkar

Key dates

this monthRegisteredJan 2023PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Jan 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed66 files

Current status

100%1 of 1 units booked

Figures as on 25 Apr 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Laxmi Raghunath NiwasNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete across 2 buildings.

Laxmi Raghunath Niwas100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 25 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed11

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots11
Closed/Covered8
Open Space3

Land and ownership9

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area262 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
LandownerVillageDistrict
Laxmiraghunath NiwasPanvelRaigarh
Chandrakant Raghunath MurbadkarPanvelRaigarh
Shakuntala Shashikant MurbadkarPanvelRaigarh
Anil Raghunath MurbadkarPanvelRaigarh
Milind Shashikant MurbadkarPanvelRaigarh
Ashwini Rajendra SagvekarPanvelRaigarh
Smita Kamlakar ChaudharyPanvelRaigarh
Revati Rajendra ChaudharyPanvelRaigarh
Jyotika Vinayak PanditPanvelRaigarh

Approvals and building plan

Permissible FSI547.38
Proposed, not sanctioned547 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 2 3 4 5 And 6 Ground Floor Sai Sneh Chs Ltd Plot No 230 1 Behind Mtnl Building Old Panvel Raigad Maharashtra Pin 410 206

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR ANJALI DAMLE NADGAUNDI
EngineerMANDAR A NADGAUNDI
EngineerSK Consultants & Engineers
Chartered AccountantS T P & Associates
Chartered AccountantGaurav S Rajpal & Co
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
ELEGANCE BUILDCON-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Apr 2024

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Laxmi Raghunath Niwas.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Laxmi Raghunath Niwas as on 2nd February 2024.pdf22 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Laxmi Raghunath Niwas as on 2nd February 2024.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Laxmi Raghunath Niwas 02-02-2024.pdf19 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: final a.pdf5 Apr 2024
Building plan approval or NA orderFile: scan (1)_compressed.pdf2 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: scan (1)_compressed.pdf2 Apr 2024
Building plan approval or NA orderFile: Layout.pdf27 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout.pdf27 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Laxmi Raghunath Niwas as on Dec 2023.pdf6 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Laxmi Raghunath Niwas as on Dec 2023.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Laxmi Raghunath Niwas as on Dec 2023.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Laxmi Raghunath Niwas as on March 2023.pdf8 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Laxmi Raghunath as on March 2023.pdf8 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Laxmi Raghunath as on June 2023.pdf8 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Laxmi Raghunath as on September 2023.pdf8 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Laxmi Raghunath Niwas as on March 2023 (UPDATED).pdf8 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Laxmi Raghunath Niwas as on June 2023 (UPDATED).pdf8 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Laxmi Raghunath Niwas as on September 2023 (UPDATED).pdf8 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Laxmi Raghunath Niwas March 2023.pdf8 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Laxmi Raghunath Niwas 30th June 2023.pdf8 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Laxmi Raghunath Niwas 30th September 2023.pdf8 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 111.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2222.pdf27 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Laxmi Raghunath Niwas as on June 2023.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Laxmi Raghunath Niwas as on September 2023.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Laxmi Raghunath Niwas 30th June 2023.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Laxmi Raghunath Niwas 30th September 2023.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Laxmi Raghunath Niwas as on March 2023.pdf29 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Laxmi Raghunath Niwas as on March 2023.pdf29 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Laxmi Raghunath Niwas as on 2022-23.pdf29 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Elegance.pdf13 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annequre A -Elegance.pdf13 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A -Elegance.pdf13 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement -Elegance_11zon.pdf13 Jan 2023
Other - FinanceFile: RERA BANK ACCOUNT.pdf14 Dec 2022
Proforma of Agreement for saleFile: AFS_Elegance Buildcon_Laxmiraghunath Niwas_14012023.pdf12 Dec 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER PROFORMA.pdf8 Dec 2022
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE DECLARATION FROM OWNER.pdf16 Nov 2022
Details of encumbrances concerned to LegalFile: ENCUMBRANCE DECLARATION FROM OWNER.pdf16 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFCATE LATEST.pdf16 Nov 2022
Deviation Report with respect to Allotment letterFile: ALLOTMENT LETTER AND agreement for sale LATEST.pdf16 Nov 2022
OtherFile: RERA BANK ACCOUNT.pdf16 Nov 2022
OtherFile: ARCHITECT CERTIFICATE LATEST.pdf16 Nov 2022
Other - TechnicalFile: Renewed CC Order.pdf16 Nov 2022
Other - TechnicalFile: DECLARATION OF FORM B OF LANDOWNER.pdf16 Nov 2022
Other - TechnicalFile: ENGINEER CERTIFCATE LATEST.pdf16 Nov 2022
Other - TechnicalFile: ARCHITECT CERTIFICATE LATEST.pdf16 Nov 2022
Declaration in FORM BFile: Declaration Form B notarized Latest.pdf21 Jul 2022
Copy of the legal title reportFile: 1 TITLE REPORT WITH ANNEXURES Part1.pdf27 Jun 2022
Copy of the legal title reportFile: 1 TITLE REPORT WITH ANNEXURES Part2.pdf27 Jun 2022
Copy of the legal title reportFile: 1 TITLE REPORT WITH ANNEXURES Part3.pdf27 Jun 2022
Declaration in FORM BFile: 1 Declaration in FORM B NEW.pdf27 Jun 2022
OtherFile: POWER OF ATTORNEY Part1.pdf27 Jun 2022
OtherFile: POWER OF ATTORNEY Part2.pdf27 Jun 2022
OtherFile: POWER OF ATTORNEY Part3.pdf27 Jun 2022
OtherFile: POWER OF ATTORNEY Part4.pdf27 Jun 2022
CERSAI detailsFile: CRESAI Report.pdf28 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Jan 2022
Building plan approval or NA orderFile: 1CC Drg.pdf18 Jan 2022
Layout approvalFile: 1CC Drg.pdf18 Jan 2022
Copy of Layout Approval (in case of layout)File: 1CC Drg.pdf18 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: 1CC Drg.pdf18 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: 1CC Order.pdf18 Jan 2022
PAN CardFile: PAN Eligance Buildcon.pdf15 Jan 2022
Declaration about Commencement CertificateFile: Declaration about CC.pdf15 Jan 2022

How this compares with Raigarh

100%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Laxmi Raghunath Niwas on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Panvel5,900+ in Raigarh

2 kmLaxmi Raghunath NiwasCompleted 246Lapsed / revoked 70Other 156Dot size: filed unitsN

Filed coordinates, straight-line distance. 472 registered projects within 2 km.

Builder: ELEGANCE BUILDCON

ELEGANCE BUILDCON has 1 registration on MahaRERA, including Laxmi Raghunath Niwas. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Laxmi Raghunath Niwas is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Laxmi Raghunath Niwas?

The registered promoter entity is ELEGANCE BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Laxmi Raghunath Niwas?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Laxmi Raghunath Niwas?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Laxmi Raghunath Niwas?

The professionals named in the filing: Architect: AR ANJALI DAMLE NADGAUNDI; Engineer: MANDAR A NADGAUNDI; Engineer: SK Consultants & Engineers; Chartered Accountant: S T P & Associates; Chartered Accountant: Gaurav S Rajpal & Co; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Laxmi Raghunath Niwas?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Laxmi Raghunath Niwas. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Laxmi Raghunath Niwas to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.