Home / Browse projects / Nagpur, Maharashtra / LAXMI NARAYAN PARK

Registered No litigation declared Residential / Group Housing project

LAXMI NARAYAN PARK

By MANOJ LAXMIKANT ITKELWAR, RAJU LAXMIKANT ITKELWAR

RG-MH-18012 · RERA P50500077320 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
0 of 55Construction stages doneacross 5 buildings; furthest along: Excavation, 80%
0Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

LAXMI NARAYAN PARK is a Residential / Group Housing project by MANOJ LAXMIKANT ITKELWAR, RAJU LAXMIKANT ITKELWAR in Nagpur, Maharashtra, registered with MahaRERA as P50500077320 on 6 Aug 2024. Possession is promised by 31 Dec 2029.

At a glance

Project

  • NameLAXMI NARAYAN PARK
  • TypeResidential / Group Housing
  • Location
    • Pawangaon
    • Kamptee
    • Nagpur
    • 440035
  • Pincode440035
  • RERA no.P50500077320
  • ReraGenie IDRG-MH-18012

Builder

  • NameMANOJ LAXMIKANT ITKELWAR, RAJU LAXMIKANT ITKELWAR
  • Entity typeOthers
  • Named personsMANOJ LAXMIKANT ITKELWAR, RAJU LAXMIKANT ITKELWAR

Key dates

this monthRegisteredAug 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Aug 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings5 building records
  • Documents filed96 files

Current status

18.3%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA30000
WING BNA20000
WING CNA20000
WING DNA20000
WING ENA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Excavation, at 80%.

WING A20%
ActivityProgress
Excavation70%
Basement (if any)0%
Podiums (if any)0%
Plinth40%
Stilt Floor30%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B25%
ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)0%
Plinth50%
Stilt Floor40%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C20%
ActivityProgress
Excavation70%
Basement (if any)0%
Podiums (if any)0%
Plinth40%
Stilt Floor30%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING D25%
ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)0%
Plinth50%
Stilt Floor40%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING E0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed60

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots60
Closed/Covered60
BuildingClosed/CoveredTotal
WING A1313
WING B1010
WING C1010
WING D1313
WING E1414

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,014 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jun 2025

Approvals and building plan

Sanctioning authorityMANOJ LAXMIKANT ITKELWAR, RAJU LAXMIKANT ITKELWAR
Permissible FSI11688.45
Proposed, not sanctioned11,188 sq m
Buildings approved5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shriram Tower, Ground Floor, S V Patel Marg, Near NIT Building, Sadar, Nagpur, Maharashtra.440001
Estimated costRs 64.14 cr
Cost incurredRs 11.77 cr
Work done18.34%
BuildingWingEstimatedIncurred
-NARs 32.07 crRs 5.88 cr
WING ANARs 6.41 crRs 1.18 cr
WING BNARs 6.41 crRs 1.18 cr
WING CNARs 6.41 crRs 1.18 cr
WING DNARs 6.41 crRs 1.18 cr
WING ENARs 6.41 crRs 1.18 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCHANDRASHEKHAR GIRIPUNJE
EngineerCHANDRASHEKHAR GIRIPUNJE
EngineerMahesh Balpande
Chartered AccountantCA ANKIT TALREJA
Chartered AccountantRishi Lashkare
PartnerRole in project
MANOJ LAXMIKANT ITKELWAR, RAJU LAXMIKANT ITKELWAR-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Laxmi Narayan Park FORM 1 MARCH 2026.pdf21 May 2026
Withdrawal Update Form 2File: Laxmi Narayan Park FORM 2 MARCH 2026.pdf21 May 2026
Withdrawal Update Form 3File: Laxmi Narayan Park FORM 3 MARCH 2026_compressed.pdf21 May 2026
Withdrawal Update Form 1File: FORM - 1 Architect Certificate - Sep 2025.pdf19 Feb 2026
Withdrawal Update Form 1File: FORM - 1 Architect Certificate - Dec 2025 (2).pdf19 Feb 2026
Withdrawal Update Form 2File: Laxmi Narayan Park - Form 2 - September 2025 (3).pdf19 Feb 2026
Withdrawal Update Form 2File: Laxmi Narayan Park - Form 2 - December 2025 (2).pdf19 Feb 2026
Withdrawal Update Form 3File: FORM - 3 CA Certificate - September 2025_compressed (1).pdf19 Feb 2026
Withdrawal Update Form 3File: FORM - 3 CA Certificate - December 2025 (2)_compressed.pdf19 Feb 2026
Form 1File: Laxmi Narayan Park - Form 1 - March 2025.pdf6 Sep 2025
Form 2File: Laxmi Narayan Park - Form 2 - March 2025.pdf6 Sep 2025
Form 3File: Laxmi Narayan Park - Form 3 - March 2025_compressed.pdf6 Sep 2025
Disclosure of Sold and Booked InventoryFile: Laxmi Narayan Park - Disclosure - March 2025.pdf6 Sep 2025
Withdrawal Update Form 1File: Laxmi Narayan Park - Form 1 - June 2025.pdf6 Sep 2025
Withdrawal Update Form 2File: Laxmi Narayan Park - Form 2 - June 2025.pdf6 Sep 2025
Withdrawal Update Form 3File: Laxmi Narayan Park - Form 3 - June 2025_compressed.pdf6 Sep 2025
Form 1File: Laxmi Narayan Park - Form 1 - September 2024.pdf18 Jun 2025
Form 2File: Laxmi Narayan Park - Form 2 - September 2024.pdf18 Jun 2025
Form 3File: Laxmi Narayan Park - Form 3 - September 2024.pdf18 Jun 2025
Disclosure of Sold and Booked InventoryFile: Laxmi Narayan Park - Disclosure - September 2024.pdf18 Jun 2025
Form 1File: Laxmi Narayan Park - Form 1 - December 2024.pdf18 Jun 2025
Form 2File: Laxmi Narayan Park - Form 2 - December 2024.pdf18 Jun 2025
Form 3File: Laxmi Narayan Park - Form 3 - December 2024.pdf18 Jun 2025
Disclosure of Sold and Booked InventoryFile: Laxmi Narayan Park - Disclosure - December 2024.pdf18 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - September 2024_compressed (1).pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - December 2024_compressed.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Laxmi Narayan Park - Form 1 - September 2024.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Laxmi Narayan Park - Form 1 - December 2024.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Laxmi Narayan Park - Form 3 - September 2024_compressed.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Laxmi Narayan Park - Form 3 - December 2024_compressed.pdf11 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Laxmi Narayan Park - Form 2 - September 2024.pdf11 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Laxmi Narayan Park - Form 2 - December 2024.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: Laxmi Narayan Park - Disclosure - September 2024.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: Laxmi Narayan Park - Disclosure - December 2024.pdf11 Feb 2025
Other - TechnicalFile: CC Mail.pdf30 Jul 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B) (28 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: 1 Declaration about all RERA Designated Bank Accounts (Format A) (3).pdf28 Jul 2024
Other - LegalFile: Declaration Other Legal.pdf28 Jul 2024
Other - LegalFile: Gift Deed.pdf28 Jul 2024
Other - LegalFile: Digital पावनगांव_12-1-अ_Satbara (1).pdf28 Jul 2024
Other - LegalFile: 3 Other - Technical.pdf26 Jul 2024
Other - FinanceFile: 3 Other - Technical.pdf26 Jul 2024
Other - TechnicalFile: 3 Other - Technical.pdf26 Jul 2024
Other - TechnicalFile: 3 Other - Technical.pdf26 Jul 2024
Copy of the legal title reportFile: TITLE.pdf25 Jul 2024
Other - FinanceFile: 1 Other - Legal (10).pdf15 Jul 2024
Other - TechnicalFile: 1 Copy of the legal title report (49).pdf15 Jul 2024
Layout approvalFile: 12_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-12.pdf14 Jul 2024
Building plan approvalFile: 12_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-12.pdf14 Jul 2024
PAN CardFile: rAJU pAN.pdf14 Jul 2024
Copy of Layout Approval (in case of layout)File: 12_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-12.pdf14 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 12_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-12.pdf14 Jul 2024
Declaration about Commencement CertificateFile: form d (2)_L N PARK.pdf14 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Laxmi Narayan Park.pdf14 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (14).pdf14 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest in Other Real Estate Organizations (7).pdf14 Jul 2024
Building plan approvalFile: iNDEX.pdf13 Jul 2024
Building plan approvalFile: 1_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-5.pdf13 Jul 2024
Building plan approvalFile: 2_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-6.pdf13 Jul 2024
Building plan approvalFile: 3_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-9_compressed.pdf13 Jul 2024
Building plan approvalFile: 4_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-10.pdf13 Jul 2024
Building plan approvalFile: 5_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-7_compressed.pdf13 Jul 2024
Building plan approvalFile: 6_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-8.pdf13 Jul 2024
Building plan approvalFile: 7_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-3_compressed.pdf13 Jul 2024
Building plan approvalFile: 8_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-4.pdf13 Jul 2024
Building plan approvalFile: 9_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-1_compressed.pdf13 Jul 2024
Building plan approvalFile: 10_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-2.pdf13 Jul 2024
Building plan approvalFile: 11_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-11.pdf13 Jul 2024
Details of encumbrances concerned to FinanceFile: ENCUM_Finance_LAXMI NARAYAN PARK.pdf13 Jul 2024
Details of encumbrances concerned to FinanceFile: ENCUM_LEGAL_LAXMI NARAYAN PARK.pdf13 Jul 2024
Details of encumbrances concerned to LegalFile: ENCUM_Finance_LAXMI NARAYAN PARK.pdf13 Jul 2024
Details of encumbrances concerned to LegalFile: ENCUM_LEGAL_LAXMI NARAYAN PARK.pdf13 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: iNDEX.pdf13 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 1_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-5.pdf13 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 2_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-6.pdf13 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 3_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-9_compressed.pdf13 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 4_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-10.pdf13 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 5_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-7_compressed.pdf13 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 6_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-8.pdf13 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 7_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-3_compressed.pdf13 Jul 2024

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LAXMI NARAYAN PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pawangaon2,800+ in Nagpur

Builder: MANOJ LAXMIKANT ITKELWAR, RAJU LAXMIKANT ITKELWAR

MANOJ LAXMIKANT ITKELWAR, RAJU LAXMIKANT ITKELWAR has 1 registration on MahaRERA, including LAXMI NARAYAN PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if LAXMI NARAYAN PARK is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LAXMI NARAYAN PARK?

The registered promoter entity is MANOJ LAXMIKANT ITKELWAR, RAJU LAXMIKANT ITKELWAR, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LAXMI NARAYAN PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LAXMI NARAYAN PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LAXMI NARAYAN PARK?

The professionals named in the filing: Architect: CHANDRASHEKHAR GIRIPUNJE; Engineer: CHANDRASHEKHAR GIRIPUNJE; Engineer: Mahesh Balpande; Chartered Accountant: CA ANKIT TALREJA; Chartered Accountant: Rishi Lashkare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LAXMI NARAYAN PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LAXMI NARAYAN PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LAXMI NARAYAN PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.