Home / Browse projects / Sindhudurg, Maharashtra / LAXMI ARCADE

Registration lapsed No litigation declared Residential / Group Housing project

LAXMI ARCADE

By ATHARVA DEVELOPERS

RG-MH-46982 · RERA P52900008684 · Last updated on MahaRERA portal: 27 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 36 months past the filed date
  • Completion date moved by 58 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Oct 2023Possession promised36 months past this date
5 of 11Construction stages donefurthest along: Internal walls, 90%
44 of 48Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

LAXMI ARCADE is a Residential / Group Housing project by ATHARVA DEVELOPERS in Sindhudurg, Maharashtra, registered with MahaRERA as P52900008684 on 19 Aug 2017. Possession was promised by 31 Oct 2023 and is now 36 months past that date. The completion date has moved by 58 months from the original filing. 4 of the 48 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameLAXMI ARCADE
  • TypeResidential / Group Housing
  • Location
    • kudal
    • Kudal (CT)
    • Sindhudurg
    • 416520
  • Pincode416520
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900008684
  • ReraGenie IDRG-MH-46982

Builder

  • NameATHARVA DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAYFA0200C1ZY
  • PartnersSATISH PANDURANG BORADE, JYOTI SATISH BORADE
  • Other registrations20 more →
  • Completed2 of 21
  • No longer live16 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

36 months past promisethis monthRegisteredAug 2017First promiseDec 2018Revised toOct 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Aug 2017
  • Promised completion31 Oct 2023
  • Revised completionRevised to 31 Oct 2023 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed77 files

Current status

8%4 of 48 units booked
53.6%Work done, per cost certificate

Figures as on 27 Jan 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LAXMI ARCADENA5448048

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

LAXMI ARCADE: 76% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,987 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Jun 2026

Approvals and building plan

Permissible FSI1513.53
Proposed, not sanctioned1,514 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchdombvli
Estimated costRs 2.65 cr
Cost incurredRs 1.42 cr
Work done53.58%
BuildingWingEstimatedIncurred
-NARs 2.65 crRs 1.42 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAMOD SHINDE
EngineerRUPESH TAWATE
EngineerManohar Patil
Chartered AccountantSAGAR JOSHI
Chartered AccountantCHHAJED & DOSHI
PartnerRole in project
ATHARVA DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52900011872Dec 2018 → Oct 2023

Reason as filed by the promoterThis is to mention that We halted constrution work due to following reasons 1) We have suffered financial issues during construction . 2) We were facing Booking issues as no enquries . 3) We had to halt construction further due to covid We are seeking further Extention on following grounds 1) We are arranging Finance for construction work from relatives and friends 2) We are getting enquiries from customers about restart of work 3) We are expecting good market now which shall compensate pour losses 4) Our vendors assured cooperation and support at the their end We assure no further delay onwar

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Nov 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Nov 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Nov 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Q4.pdf27 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Q1.pdf27 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form1 - 30-09-2024.pdf27 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf27 Jan 2025
Certificates of CA (Form 3)File: Form 3 31-03-2024_compressed.pdf27 Jan 2025
Certificates of CA (Form 3)File: Form 3 30-06-2024_compressed.pdf27 Jan 2025
Certificates of CA (Form 3)File: Form 3 30-09-2024_compressed.pdf27 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Q4.pdf27 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Q1.pdf27 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Q2.pdf27 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2.pdf27 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_compressed.pdf27 Jan 2025
Certificates of CA (Form 3)File: C A CERTIFICATE Form 3 - Signed_11zon.pdf29 Feb 2024
Certificates of CA (Form 3)File: C A CERTIFICATE Form 3 - Signed_11zon.pdf29 Feb 2024
Certificates of CA (Form 3)File: C A CERTIFICATE Form 3 - Signed_11zon.pdf26 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 March-23.pdf24 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 June-23.pdf24 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 September-23.pdf24 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 December-23.pdf24 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A March-23.pdf24 Feb 2024
Certificates of CA (Form 3)File: FORM 3 Dec -22_compressed.pdf24 Feb 2024
Certificates of CA (Form 3)File: FORM 3 March-23_compressed.pdf24 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Architect_Certificate_June_23.pdf23 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form_1.pdf23 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - June 23.pdf23 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate - Sep-23_compressed.pdf23 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Dec 23_compressed.pdf23 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Audit report and Form 5 FY 22-23_compressed.pdf12 Dec 2023
Certificates of CA (Form 3)File: Form-3 March-2022_compressed.pdf3 Jul 2023
Certificates of CA (Form 3)File: FORM 3 Sep-22_compressed.pdf3 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31_mar_2018-REVISED.pdf18 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31_mar_2019-REVISED.pdf18 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31_mar_2020-REVISED.pdf18 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31_mar_2021-REVISED.pdf18 Apr 2023
Certificates of CA (Form 3)File: FORM 3-March 18_compressed.pdf18 Apr 2023
Certificates of CA (Form 3)File: FORM 3- March 19_compressed.pdf18 Apr 2023
Certificates of CA (Form 3)File: FORM 3- march 20_compressed.pdf18 Apr 2023
Certificates of CA (Form 3)File: FORM 3- MARCH 21_compressed.pdf18 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect_Certificate_March_2018.pdf6 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect_Certificate_March_2019.pdf6 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect_Certificate_March_2020.pdf6 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect_Certificate_March_2021.pdf6 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5.pdf13 Jan 2023
Declaration about Commencement CertificateFile: Certificate of CC.pdf30 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2A.pdf30 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf30 May 2022
CERSAI detailsFile: CERSAI_Search_Report_200238458415_For_Asset_Based_Search_30_05_2022_16_25_47_846.pdf30 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 (Audit-2018-19).pdf30 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 (Audit-2019-20).pdf30 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 (Audit-2020-21).pdf30 May 2022
Declaration about Commencement CertificateFile: Certificate of CC.pdf13 May 2022
Certificates of CA (Form 5)File: FORM 5 Atharva_Developers.pdf31 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf2 Apr 2018
Certificates of CA (Form 3)File: CA CERT-compressed.pdf25 Nov 2017
Copy of the legal title reportFile: Title Cert.pdf24 Nov 2017
Proforma of Allotment letterFile: Agrement1.pdf24 Nov 2017
Proforma of Allotment letterFile: Agrement2.pdf24 Nov 2017
Proforma of Allotment letterFile: Agrement3.pdf24 Nov 2017
Proforma of Allotment letterFile: Agrement4.pdf24 Nov 2017
Building plan approvalFile: CC.pdf21 Nov 2017
Layout approvalFile: LAYOUT1.pdf21 Nov 2017
Layout approvalFile: LAYOUT2.pdf21 Nov 2017
Copy of Layout Approval (in case of layout)File: LAYOUT1.pdf21 Nov 2017
Copy of Layout Approval (in case of layout)File: LAYOUT2.pdf21 Nov 2017
Building Plan Approval (IOD)File: CC.pdf21 Nov 2017
Layout approvalFile: Copy of layout.pdf31 Jul 2017
Building plan approvalFile: CC-ilovepdf-compressed (1).pdf31 Jul 2017
PAN CardFile: ARTHARV.pdf31 Jul 2017
Copy of the legal title reportFile: Title certificate.pdf31 Jul 2017
Details of encumbrancesFile: eNCUMB cERT.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Copy of layout.pdf31 Jul 2017
Building Plan Approval (IOD)File: CC-ilovepdf-compressed (1).pdf31 Jul 2017
Declaration in FORM BFile: aFFIDAVIT.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: aRCHITECT cERTI.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eNGG cERT.pdf31 Jul 2017
Certificates of CA (Form 3)File: New Doc 2017-07-31 (3) (1).pdf31 Jul 2017
Proforma of Allotment letterFile: PROFORMA.pdf31 Jul 2017

How this compares with Sindhudurg

8%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one moved by 58 months
30%of Sindhudurg registrations have lapsed or been cancelledthis one is among them

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep LAXMI ARCADE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kudal (CT)530+ in Sindhudurg

2 kmLAXMI ARCADECompleted 17Lapsed / revoked 10Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 46 registered projects within 2 km.

Builder: ATHARVA DEVELOPERS

ATHARVA DEVELOPERS has 21 registrations on MahaRERA, including SHWETA CHS and Atharva Heights. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 4 past projects completed on time. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What does it mean that LAXMI ARCADE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if LAXMI ARCADE is delayed beyond 31 Oct 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LAXMI ARCADE?

The registered promoter entity is ATHARVA DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAYFA0200C1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LAXMI ARCADE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LAXMI ARCADE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LAXMI ARCADE?

The professionals named in the filing: Architect: PRAMOD SHINDE; Engineer: RUPESH TAWATE; Engineer: Manohar Patil; Chartered Accountant: SAGAR JOSHI; Chartered Accountant: CHHAJED & DOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LAXMI ARCADE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LAXMI ARCADE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LAXMI ARCADE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.