LANDMARK SQUARE
By SQUARE ANGLE INFRASTRUCTURE
RG-MH-77935 · RERA P53000054594 · Last updated on MahaRERA portal: 28 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
LANDMARK SQUARE is a Others project by SQUARE ANGLE INFRASTRUCTURE in Kolhapur, Maharashtra, registered with MahaRERA as P53000054594 on 31 Jan 2024. Possession is promised by 31 Dec 2027. 20 of the 59 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameLANDMARK SQUARE
- TypeOthers
- Location
- B WARD NEAR SWAMI SAMETH MANDIR JARAG NAGAR
- SWAMI SAMARTH NAGAR KOLHAPUR
- Kolhapur (M Corp.)
- Karvir
- Kolhapur
- 416012
- Pincode416012
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53000054594
- ReraGenie IDRG-MH-77935
Builder
- NameSQUARE ANGLE INFRASTRUCTURE
- Entity typePartnership
- GSTIN27AEOFS6342B1ZX
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersASHISH GANPATRAO NALAWADE, ASHWIN PRAFULLA SHAH, AMOL SHIVANAND KONDE, SNEHAL RAHUL KATKAR, VISHAL VILAS KAJAVE
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Jan 2024
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed85 files
Current status
Figures as on 28 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| LANDMARK SQUARE | NA | 10 | 8 | 47 | 12 | 59 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 70%.
LANDMARK SQUARE: 61% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 60% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed96
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| LANDMARK SQUARE | NA | Rs 9.33 cr | Rs 5.10 cr |
| - | NA | Rs 30.00 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SWAPNIL ARCHITECTS AND INTERIOR DESIGNER Swapnil Sankpal |
| Engineer | NIKHIL SADASHIV BHOI |
| Engineer | Pratiraj Pandurang Patil |
| Chartered Accountant | NITISH VANDURE PATIL AND ASSOCIATES |
| Chartered Accountant | Sanjay Velhal |
| Partner | Role in project |
|---|---|
| SQUARE ANGLE INFRASTRUCTURE | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Jan 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Jan 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Dec 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Dec 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed85
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architech certificate.pdf | 28 Apr 2026 |
| Withdrawal Update Form 2File: Engineer Certificate (3).pdf | 28 Apr 2026 |
| Withdrawal Update Form 3File: Form - 3 CA Certificate (2).pdf | 28 Apr 2026 |
| Form 2A (FY 2025-2026)File: form 2A (18).pdf | 28 Apr 2026 |
| Withdrawal Update Form 1File: Architect Certificate 1.pdf | 5 Mar 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 5 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Final Copy_compressed.pdf | 5 Mar 2026 |
| Building plan approvalFile: Sanctioned Plan.pdf | 8 Dec 2025 |
| Commencement certificateFile: Commencement Certificate.pdf | 8 Dec 2025 |
| Building plan approvalFile: Sanctioned Plan.pdf | 8 Dec 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 8 Dec 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 8 Dec 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 8 Dec 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 8 Dec 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 8 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 final_11zon.pdf | 8 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 final_11zon.pdf | 8 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 final_11zon.pdf | 8 Dec 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 8 Dec 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 8 Dec 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 8 Dec 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 8 Dec 2025 |
| Form 2A (FY 2024-2025)File: Form 2A -2024-2025.pdf | 8 Dec 2025 |
| Form 5 (FY 2024-2025)File: form 5.pdf | 8 Dec 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 19 Jul 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 19 Jul 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 19 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 7 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: from 3 march 2025_compressed.pdf | 7 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate march 2025.pdf | 7 May 2025 |
| Disclosure of sold/ booked inventoryFile: sold inventory march 2025.pdf | 7 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form-2A march 25.pdf | 7 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 4 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 self declaration.pdf | 4 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 4 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: sold unsold.pdf | 4 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Declaration.pdf | 21 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf | 21 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold inventory.pdf | 21 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 21 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance concerned to finance.pdf | 2 Aug 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance concerned to finance.pdf | 2 Aug 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance concerned to finance.pdf | 2 Aug 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance concerned to finance.pdf | 2 Aug 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance.pdf | 2 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 2 Aug 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Declaration.pdf | 2 Aug 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B - Bank Letter.pdf | 2 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 19 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 19 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 19 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) (5).pdf | 8 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects certificate.pdf | 13 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers cetificate.pdf | 13 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 13 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: disclosure sold and unsold.pdf | 13 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Declaration.pdf | 13 Apr 2024 |
| Other - LegalFile: Sale Deed.pdf | 23 Jan 2024 |
| Other - LegalFile: Partnership Deed.pdf | 23 Jan 2024 |
| Other - TechnicalFile: Square angle Infrastructure.pdf | 23 Jan 2024 |
| Layout approvalFile: LAOUT PLAN.pdf | 8 Jan 2024 |
| Building plan approvalFile: Sanctioned Plan.pdf | 8 Jan 2024 |
| PAN CardFile: PAN Card.pdf | 8 Jan 2024 |
| Copy of the legal title reportFile: Legal Title and Search Report.pdf | 8 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance concerned to finance.pdf | 8 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance concerned to Legal.pdf | 8 Jan 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance concerned to finance.pdf | 8 Jan 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance concerned to Legal.pdf | 8 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: LAOUT PLAN.pdf | 8 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan.pdf | 8 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 8 Jan 2024 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 8 Jan 2024 |
| Declaration in FORM BFile: Form B Declaration.pdf | 8 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate .pdf | 8 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 Engineer Certificate .pdf | 8 Jan 2024 |
| CERSAI detailsFile: CERSAI Declaration.pdf | 8 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 1 CA Certificate .pdf | 8 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 8 Jan 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Kolhapur
Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 85 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep LANDMARK SQUARE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SWAMI SAMARTH NAGAR KOLHAPUR880+ in Kolhapur
Filed coordinates, straight-line distance. 45 registered projects within 2 km.
GRUHALAXMI RACHANA
BATU BUILDERS
SRI SRI RESIDENCY
SRI SRI BUILDERS AND DEVELOPERS PROPRIETOR
ONE EARTH
DESHPANDE INFRA
DRONAGIRI
ASHTIN INDIA PVT LTD
JEWEL SQUARE
RATNARAJ BUILDERS AND DEVELOPERS
SAPPHIRE SKY
S.S.Builders and Developers
See every Kolhapur project, with the district possession charts
Builder: SQUARE ANGLE INFRASTRUCTURE
SQUARE ANGLE INFRASTRUCTURE has 2 registrations on MahaRERA, including LANDMARK SQUARE and SHARADA SQUARE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.
Frequently asked questions
What are my rights if LANDMARK SQUARE is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of LANDMARK SQUARE?
The registered promoter entity is SQUARE ANGLE INFRASTRUCTURE, a partnership as per the filing. Its GSTIN 27AEOFS6342B1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in LANDMARK SQUARE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for LANDMARK SQUARE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at LANDMARK SQUARE?
The professionals named in the filing: Architect: SWAPNIL ARCHITECTS AND INTERIOR DESIGNER Swapnil Sankpal; Engineer: NIKHIL SADASHIV BHOI; Engineer: Pratiraj Pandurang Patil; Chartered Accountant: NITISH VANDURE PATIL AND ASSOCIATES; Chartered Accountant: Sanjay Velhal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in LANDMARK SQUARE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback