Home / Browse projects / Bengaluru Urban, Karnataka / LAKESIDE 24
LAKESIDE 24
By SYLVAN ACRES REALTY PRIVATE LIMITED
RG-KA-79945 · RERA PRM/KA/RERA/1251/446/PR/060324/006667 · Last updated on RERA Karnataka portal: 14 Oct 2026
Source: official RERA Karnataka filing
Red flags
- Litigation declared, 3 cases
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
1 condition is on this record. The buyer report sets each one beside the rest of this filing and the projects around it.
See what the report covers Free either way: .Saved.
LAKESIDE 24 is a Residential/Group Housing project by SYLVAN ACRES REALTY PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/060324/006667 on 6 Mar 2024. Possession is promised by 2 Oct 2028. 119 of the 131 units on this registration are recorded sold or booked, and 1 of 18 construction stages are filed complete.
At a glance
Project
- NameLAKESIDE 24
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 562149
- Pincode562149
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/060324/006667
- ReraGenie IDRG-KA-79945
Builder
- NameSYLVAN ACRES REALTY PRIVATE LIMITED
- Entity typeCompany
- CINU70102PN2005PTC021479
- GSTIN29AAKCS3297G1ZT
- Authorized SignatoryRAJKUMAR PV
- DirectorRAJKUMAR PV
- DirectorsRAJKUMAR PV, RAKESH KINI A
- Project HeadRAJKUMAR P V
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on6 Mar 2024
- Promised completion2 Oct 2028
- Revised completionNone
- Buildings1 building record
- Documents filed163 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| LAKESIDE 24 | - | - | - | 131 | 0 | 131 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 18 construction stages are filed complete. The stage furthest along is Foundation footing work, at 99%.
Building: 23% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 99% |
| Upto Plinth Level | 45% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | 98% |
| RCC or MS Framed structure | 42% |
| Masonry Construction | 23% |
| Plastering inside , outside & Ceiling | 7% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 45% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | Yes | 0% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | Yes | 0% |
| Gym | No | Not applicable |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | Yes | 0% |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SYLVAN ACRES REALTY PRIVATE LIMITED | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 49.53 cr | Rs 3.37 cr |
| On-site expenditure-Salaries of workers | Rs 10.00 cr | Rs 76.97 lakh |
| Payment of taxes | Rs 9.09 cr | Rs 47.49 lakh |
| On-site expenditure-Site Overhead | Rs 2.29 cr | Rs 11.82 lakh |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 1.50 cr | Rs 2.14 lakh |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 1.00 cr | - |
| On-site expenditure-Consultants Fees | Rs 95.54 lakh | Rs 6.31 lakh |
Certifying professionals and partners4
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VINAYAK J (AUTHORISED REPRESENTATIVE OF RSP DESIGN CONSULTANTS (INDIA) PVT LTD) |
| Engineer | Mohan K R |
| Engineer | Umesh Joshi, Designated Partner of JW Consultants LLP |
| Chartered Accountant | MUNIYAL PADMANABHA BHAT |
Litigation declared3
| Case | Court | Status |
|---|---|---|
| OS 373/2006/2006 | 4TH Addl. SR Division, Bangalore Rural Court | - |
| OS 1539/2012/2012 | PRL. II Civil Judge (Jr Dn), Bangalore Rural | - |
| RSA No. 1657/2018/2018 | High court of Karnataka | - |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed163
As listed on the registration, under the names the promoter filed them with; the newest 80 of 163 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/060324/006667 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 30_09_2026 lakeside-compressed.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form - 5 Architect (QU) Lakeside-SEPT 26.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form - 6 Engineer (QU) Lakeside 24.pdf | 14 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 14 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 14 Oct 2026 |
| Q2 2026-27 Fire and Safety | 14 Oct 2026 |
| Q2 2026-27 Labour and Education Department | 14 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 14 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 14 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form_4_30_06_2026_lakeside R1.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form - 5 Architect (QU) Lakeside24.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form - 6 Engineer (QU) Lakeside24.pdf | 14 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 14 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 14 Jul 2026 |
| Q1 2026-27 Fire and Safety | 14 Jul 2026 |
| Q1 2026-27 Labour and Education Department | 14 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 14 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 14 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form - 5 Architect (QU) Lakeside-MAR 26.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form - 6 Engineer (QU) Lakeside 24.pdf | 14 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 14 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 14 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 14 Apr 2026 |
| Q4 2025-26 Fire and Safety | 14 Apr 2026 |
| Q4 2025-26 Labour and Education Department | 14 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 14 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 14 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 31122025.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form - 5 Architect (QU) Lakeside-DEC 25.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form - 6 Engineer (QU) Lakeside 24.pdf | 12 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 12 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 12 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 12 Jan 2026 |
| Q3 2025-26 Fire and Safety | 12 Jan 2026 |
| Q3 2025-26 Labour and Education Department | 12 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 12 Jan 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 12 Jan 2026 |
| 1. sources of fund is not supported by financial statement, please submit the supporting documents HFile: SOURCE OF FUND UPLOAD.pdf | 4 Mar 2024 |
| What are all the sources of funds to complete the project? With supporting documents. Hence not okFile: SOURCE OF FUND UPLOAD.pdf | 12 Feb 2024 |
| 1) as already observed promoter need to upload correct defect free notarized form-b affidavit by reFile: FORM B UPLOAD.pdf | 12 Feb 2024 |
| 2) litigations are pending regarding land in civil courts since 2006 & 2012, if the project is approFile: LEGAL OPINION UPLOAD.pdf | 12 Feb 2024 |
| 2) litigations are pending regarding land in civil courts since 2006 & 2012, if the project is approFile: AFFIDAVIT UPLOAD.pdf | 12 Feb 2024 |
| 2) Promoter has not changed to the local project Engineer address details instead uploaded the RKM pFile: ENGINEER KYC.pdf | 12 Feb 2024 |
| 2) Promoter has not changed to the local project Engineer address details instead uploaded the RKM pFile: CERTIFICATE.pdf | 12 Feb 2024 |
| Uploaded financial statements not visibleFile: FINANCIAL SATEMENT - COMPRESSED.pdf | 6 Dec 2023 |
| upload EC from 1-4-2006 to 28/2/2014 & 1/1/2022 to till dateFile: EC.pdf | 6 Dec 2023 |
| Form-B need to be notarized , by filling/ retaining only relevant information , hence not ok.File: CLEAR AFFIDAVIT.pdf | 6 Dec 2023 |
| Updated clarification instead of updating the local project Engineer address details. Therefore PleaFile: RKM PROFILE.pdf | 6 Dec 2023 |
| Certain clauses in the proforma agreement for sale are inconsistent with the GOK-notified AgreementFile: FINAL AFS.pdf | 6 Dec 2023 |
| 1. Uploaded financial statements not visibleFile: FINANCIAL STATEMENTS.pdf | 15 Nov 2023 |
| 3. upload bank account statement, bank account name should be as per bank account direction circularFile: RERA DESIGNATED ACCOUNT NAME.pdf | 15 Nov 2023 |
| 1) upload EC from 1-4-2006 to 28/2/2014 & 1/1/2022 to till dateFile: EC.pdf | 15 Nov 2023 |
| 2) MR in favuor of agricultural land owner before conversionFile: MR BEFORE CONVERSION.PDF | 15 Nov 2023 |
| 4) Form-B need to be notarized , by filling/ retaining only relevant information , hence not okFile: CLEAR AFFIDAVIT.pdf | 15 Nov 2023 |
| 1) As per the uploaded CDP document the proposed site comes in the industrial zone upload the changeFile: CHANGE OF LAND USE.PDF | 15 Nov 2023 |
| 3) Upload all sanctioned drawings. (Section drawing is not uploaded)File: SITE PLAN.pdf | 15 Nov 2023 |
| 1) Once again updated Amenities and common area details are incorrect, therefore please update the sFile: AMENITIES.PDF | 15 Nov 2023 |
| ) The corrected copy is not uploaded. Once again uploaded proforma of the Agreement for Sale (AFS)File: FINAL AFS.pdf | 15 Nov 2023 |
| 3. upload bank account statement, bank account name should be as per bank account direction circularFile: Sylvan aces.pdf | 19 Oct 2023 |
| 1) Carpet Area Mentioned in the project details Page not matching with the sanction plan clarify / uFile: CARPET AREA CERTIFICATION.pdf | 19 Oct 2023 |
| 1) Once again updated Amenities and common area details are incorrect, therefore please update the sFile: CERTIFICATE BY ARCHITECT-Proj Spec.pdf | 19 Oct 2023 |
| 5) Please upload the Certificate from the Registered Engineer indicating the structural safety adoptFile: STRUCTURAL SAFETY.pdf | 19 Oct 2023 |
| MR in favuor of agricultural land owner instead of katha extractFile: MR.pdf | 19 Oct 2023 |
| 7) Uploaded the format without required details, Therefore Please update the project address and AnnFile: ALLOTEMENT LETTER.pdf | 19 Oct 2023 |
| 8) Uploaded the drawing without certified by the Engineer's signature. Therefore Please upload the SFile: STP DESIGN.pdf | 19 Oct 2023 |
| Upload profit and loss account and balance sheet 2020-21, 2021-22 & 2022-23 with CA UDIN along withFile: 2020-21.pdf | 22 Sep 2023 |
| Upload profit and loss account and balance sheet 2020-21, 2021-22 & 2022-23 with CA UDIN along withFile: 2021-22.pdf | 22 Sep 2023 |
| Upload profit and loss account and balance sheet 2020-21, 2021-22 & 2022-23 with CA UDIN along withFile: 2022-23 - FINAL.pdf | 22 Sep 2023 |
| Upload bank passbook/pass sheet, bank account name should be as per bank account direction circularFile: BANK PASS BOOK.pdf | 22 Sep 2023 |
| 1) recent RTCFile: RTC.pdf | 22 Sep 2023 |
| 2) MR in favuor of land ownerFile: SYLVAN ACRES KHATA.pdf | 22 Sep 2023 |
| 3) EC from 1-4-2006 to 28/2/2014 & 1/1/2022 to till dateFile: EC.pdf | 22 Sep 2023 |
| 4) mother conversion order dated 10/12/2008File: MOTHER CONVERSION ORDER.PDF | 22 Sep 2023 |
| 5) approved layout planFile: Site Plan.pdf | 22 Sep 2023 |
| 6) from-B need to be notarized , by filling/ retaining only relevant informationFile: CLEAR AFFIDAVIT.pdf | 22 Sep 2023 |
| 1) Area details the project details page not matching with the Approved Plan (total area , covers arFile: Site Plan.pdf | 22 Sep 2023 |
| 2) Carpet Area Mentioned in the project details Page not matching with the sanction plan clarify / uFile: Site Plan.pdf | 22 Sep 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Free monthly report: Bengaluru on RERA Karnataka, month by month. What registered each month, the flat types and carpet areas being built, the taluks and the completion pipeline, from these same filings.
Buyer report
Built from this project's RERA Karnataka filing, in plain language.
- 1 condition on this project's record set out, with the clear checks alongside
- Every unit as filed, tower by tower: carpet area, undivided share of the land and parking, with the sizes placed against the other projects of the taluk
- The land chain survey by survey: conversion order, deed, khata and joint development, in date order
- The construction schedule the promoter filed, planned dates against actual ones, item by item
- Joined against every project registered within 2 km, which the register never shows together
- What to check before you book, drawn from this filing
Not included: the filed documents themselves (the report lists which are on file and does not read them) and a project watch.
Keep LAKESIDE 24 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 33 registered projects within 2 km.
Soul@Godrej Ananda
Universal Metro Properties LLP
Dioro & Beryl at Brigade El Dorado
Brigade Tetrarch Private Limited
Emerald & Luminaire Block at Brigade El Dorado
Brigade Tetrarch Private Limited
Northern Lights by Puravankara KVN
KVN Property Holdings LLP
Northern Lights by Puravankara KVN Phase 2
KVN Property Holdings LLP
Godrej Ananda Phase 2
Universal Metro Properties LLP
See every Bengaluru Urban project, with the district possession charts
Builder: SYLVAN ACRES REALTY PRIVATE LIMITED
SYLVAN ACRES REALTY PRIVATE LIMITED has 1 registration on RERA Karnataka, including LAKESIDE 24. Its filings disclose no earlier RERA Karnataka projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if LAKESIDE 24 is delayed beyond 2 Oct 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of LAKESIDE 24?
The registered promoter entity is SYLVAN ACRES REALTY PRIVATE LIMITED, a company as per the filing. Its CIN U70102PN2005PTC021479 and GSTIN 29AAKCS3297G1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in LAKESIDE 24?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at LAKESIDE 24?
The professionals named in the filing: Architect: VINAYAK J (AUTHORISED REPRESENTATIVE OF RSP DESIGN CONSULTANTS (INDIA) PVT LTD); Engineer: Mohan K R; Engineer: Umesh Joshi, Designated Partner of JW Consultants LLP; Chartered Accountant: MUNIYAL PADMANABHA BHAT. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in LAKESIDE 24?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback