Red flags

  • Litigation declared, 3 cases

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared

1 condition is on this record. The buyer report sets each one beside the rest of this filing and the projects around it.

See what the report covers Free either way: .
Oct 2028Possession promisedno revision filed
1 of 18Construction stages donefurthest along: Foundation footing work, 99%
12 of 131Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 163 documents Report an error

LAKESIDE 24 is a Residential/Group Housing project by SYLVAN ACRES REALTY PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/060324/006667 on 6 Mar 2024. Possession is promised by 2 Oct 2028. 119 of the 131 units on this registration are recorded sold or booked, and 1 of 18 construction stages are filed complete.

At a glance

Project

  • NameLAKESIDE 24
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
    • 562149
  • Pincode562149
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/060324/006667
  • ReraGenie IDRG-KA-79945

Builder

  • NameSYLVAN ACRES REALTY PRIVATE LIMITED
  • Entity typeCompany
  • CINU70102PN2005PTC021479
  • GSTIN29AAKCS3297G1ZT
  • Authorized SignatoryRAJKUMAR PV
  • DirectorRAJKUMAR PV
  • DirectorsRAJKUMAR PV, RAKESH KINI A
  • Project HeadRAJKUMAR P V

Key dates

this monthRegisteredMar 2024PromisedOct 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on6 Mar 2024
  • Promised completion2 Oct 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed163 files

Current status

91%119 of 131 units booked
6.5%Of the estimated cost spent so far

Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LAKESIDE 24---1310131

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 18 construction stages are filed complete. The stage furthest along is Foundation footing work, at 99%.

Building: 23% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work99%
Upto Plinth Level45%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)0%
Retaining wall (All types)98%
RCC or MS Framed structure42%
Masonry Construction23%
Plastering inside , outside & Ceiling7%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes45%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes0%
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes0%
GymNoNot applicable
ParksYes0%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasYes0%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesYes0%

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,816 sq m
Named landowners1
LandownerVillageDistrict
SYLVAN ACRES REALTY PRIVATE LIMITED--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 74.37 cr
Cost incurredRs 4.81 cr
Spent of the estimate6.47%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 49.53 crRs 3.37 cr
On-site expenditure-Salaries of workersRs 10.00 crRs 76.97 lakh
Payment of taxesRs 9.09 crRs 47.49 lakh
On-site expenditure-Site OverheadRs 2.29 crRs 11.82 lakh
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 1.50 crRs 2.14 lakh
Principal sum and interest payable to financial institutions-Scheduled BanksRs 1.00 cr-
On-site expenditure-Consultants FeesRs 95.54 lakhRs 6.31 lakh

Certifying professionals and partners4

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVINAYAK J (AUTHORISED REPRESENTATIVE OF RSP DESIGN CONSULTANTS (INDIA) PVT LTD)
EngineerMohan K R
EngineerUmesh Joshi, Designated Partner of JW Consultants LLP
Chartered AccountantMUNIYAL PADMANABHA BHAT

Litigation declared3

CaseCourtStatus
OS 373/2006/20064TH Addl. SR Division, Bangalore Rural Court-
OS 1539/2012/2012PRL. II Civil Judge (Jr Dn), Bangalore Rural-
RSA No. 1657/2018/2018High court of Karnataka-

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed163

As listed on the registration, under the names the promoter filed them with; the newest 80 of 163 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/060324/006667 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 30_09_2026 lakeside-compressed.pdf14 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form - 5 Architect (QU) Lakeside-SEPT 26.pdf14 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form - 6 Engineer (QU) Lakeside 24.pdf14 Oct 2026
Q2 2026-27 Water supply and sewage board14 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)14 Oct 2026
Q2 2026-27 KPTCL- BESCOM14 Oct 2026
Q2 2026-27 Fire and Safety14 Oct 2026
Q2 2026-27 Labour and Education Department14 Oct 2026
Q2 2026-27 Airport Authority of India14 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department14 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form_4_30_06_2026_lakeside R1.pdf14 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form - 5 Architect (QU) Lakeside24.pdf14 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form - 6 Engineer (QU) Lakeside24.pdf14 Jul 2026
Q1 2026-27 Water supply and sewage board14 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)14 Jul 2026
Q1 2026-27 KPTCL- BESCOM14 Jul 2026
Q1 2026-27 Fire and Safety14 Jul 2026
Q1 2026-27 Labour and Education Department14 Jul 2026
Q1 2026-27 Airport Authority of India14 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department14 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4.pdf14 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form - 5 Architect (QU) Lakeside-MAR 26.pdf14 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form - 6 Engineer (QU) Lakeside 24.pdf14 Apr 2026
Q4 2025-26 Water supply and sewage board14 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)14 Apr 2026
Q4 2025-26 KPTCL- BESCOM14 Apr 2026
Q4 2025-26 Fire and Safety14 Apr 2026
Q4 2025-26 Labour and Education Department14 Apr 2026
Q4 2025-26 Airport Authority of India14 Apr 2026
Q4 2025-26 BSNL/Telecommunication Department14 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 31122025.pdf12 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form - 5 Architect (QU) Lakeside-DEC 25.pdf12 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form - 6 Engineer (QU) Lakeside 24.pdf12 Jan 2026
Q3 2025-26 Water supply and sewage board12 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)12 Jan 2026
Q3 2025-26 KPTCL- BESCOM12 Jan 2026
Q3 2025-26 Fire and Safety12 Jan 2026
Q3 2025-26 Labour and Education Department12 Jan 2026
Q3 2025-26 Airport Authority of India12 Jan 2026
Q3 2025-26 BSNL/Telecommunication Department12 Jan 2026
1. sources of fund is not supported by financial statement, please submit the supporting documents HFile: SOURCE OF FUND UPLOAD.pdf4 Mar 2024
What are all the sources of funds to complete the project? With supporting documents. Hence not okFile: SOURCE OF FUND UPLOAD.pdf12 Feb 2024
1) as already observed promoter need to upload correct defect free notarized form-b affidavit by reFile: FORM B UPLOAD.pdf12 Feb 2024
2) litigations are pending regarding land in civil courts since 2006 & 2012, if the project is approFile: LEGAL OPINION UPLOAD.pdf12 Feb 2024
2) litigations are pending regarding land in civil courts since 2006 & 2012, if the project is approFile: AFFIDAVIT UPLOAD.pdf12 Feb 2024
2) Promoter has not changed to the local project Engineer address details instead uploaded the RKM pFile: ENGINEER KYC.pdf12 Feb 2024
2) Promoter has not changed to the local project Engineer address details instead uploaded the RKM pFile: CERTIFICATE.pdf12 Feb 2024
Uploaded financial statements not visibleFile: FINANCIAL SATEMENT - COMPRESSED.pdf6 Dec 2023
upload EC from 1-4-2006 to 28/2/2014 & 1/1/2022 to till dateFile: EC.pdf6 Dec 2023
Form-B need to be notarized , by filling/ retaining only relevant information , hence not ok.File: CLEAR AFFIDAVIT.pdf6 Dec 2023
Updated clarification instead of updating the local project Engineer address details. Therefore PleaFile: RKM PROFILE.pdf6 Dec 2023
Certain clauses in the proforma agreement for sale are inconsistent with the GOK-notified AgreementFile: FINAL AFS.pdf6 Dec 2023
1. Uploaded financial statements not visibleFile: FINANCIAL STATEMENTS.pdf15 Nov 2023
3. upload bank account statement, bank account name should be as per bank account direction circularFile: RERA DESIGNATED ACCOUNT NAME.pdf15 Nov 2023
1) upload EC from 1-4-2006 to 28/2/2014 & 1/1/2022 to till dateFile: EC.pdf15 Nov 2023
2) MR in favuor of agricultural land owner before conversionFile: MR BEFORE CONVERSION.PDF15 Nov 2023
4) Form-B need to be notarized , by filling/ retaining only relevant information , hence not okFile: CLEAR AFFIDAVIT.pdf15 Nov 2023
1) As per the uploaded CDP document the proposed site comes in the industrial zone upload the changeFile: CHANGE OF LAND USE.PDF15 Nov 2023
3) Upload all sanctioned drawings. (Section drawing is not uploaded)File: SITE PLAN.pdf15 Nov 2023
1) Once again updated Amenities and common area details are incorrect, therefore please update the sFile: AMENITIES.PDF15 Nov 2023
) The corrected copy is not uploaded. Once again uploaded proforma of the Agreement for Sale (AFS)File: FINAL AFS.pdf15 Nov 2023
3. upload bank account statement, bank account name should be as per bank account direction circularFile: Sylvan aces.pdf19 Oct 2023
1) Carpet Area Mentioned in the project details Page not matching with the sanction plan clarify / uFile: CARPET AREA CERTIFICATION.pdf19 Oct 2023
1) Once again updated Amenities and common area details are incorrect, therefore please update the sFile: CERTIFICATE BY ARCHITECT-Proj Spec.pdf19 Oct 2023
5) Please upload the Certificate from the Registered Engineer indicating the structural safety adoptFile: STRUCTURAL SAFETY.pdf19 Oct 2023
MR in favuor of agricultural land owner instead of katha extractFile: MR.pdf19 Oct 2023
7) Uploaded the format without required details, Therefore Please update the project address and AnnFile: ALLOTEMENT LETTER.pdf19 Oct 2023
8) Uploaded the drawing without certified by the Engineer's signature. Therefore Please upload the SFile: STP DESIGN.pdf19 Oct 2023
Upload profit and loss account and balance sheet 2020-21, 2021-22 & 2022-23 with CA UDIN along withFile: 2020-21.pdf22 Sep 2023
Upload profit and loss account and balance sheet 2020-21, 2021-22 & 2022-23 with CA UDIN along withFile: 2021-22.pdf22 Sep 2023
Upload profit and loss account and balance sheet 2020-21, 2021-22 & 2022-23 with CA UDIN along withFile: 2022-23 - FINAL.pdf22 Sep 2023
Upload bank passbook/pass sheet, bank account name should be as per bank account direction circularFile: BANK PASS BOOK.pdf22 Sep 2023
1) recent RTCFile: RTC.pdf22 Sep 2023
2) MR in favuor of land ownerFile: SYLVAN ACRES KHATA.pdf22 Sep 2023
3) EC from 1-4-2006 to 28/2/2014 & 1/1/2022 to till dateFile: EC.pdf22 Sep 2023
4) mother conversion order dated 10/12/2008File: MOTHER CONVERSION ORDER.PDF22 Sep 2023
5) approved layout planFile: Site Plan.pdf22 Sep 2023
6) from-B need to be notarized , by filling/ retaining only relevant informationFile: CLEAR AFFIDAVIT.pdf22 Sep 2023
1) Area details the project details page not matching with the Approved Plan (total area , covers arFile: Site Plan.pdf22 Sep 2023
2) Carpet Area Mentioned in the project details Page not matching with the sanction plan clarify / uFile: Site Plan.pdf22 Sep 2023

How this compares with Bengaluru Urban

91%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Free monthly report: Bengaluru on RERA Karnataka, month by month. What registered each month, the flat types and carpet areas being built, the taluks and the completion pipeline, from these same filings.

Keep LAKESIDE 24 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmLAKESIDE 24Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 33 registered projects within 2 km.

Builder: SYLVAN ACRES REALTY PRIVATE LIMITED

SYLVAN ACRES REALTY PRIVATE LIMITED has 1 registration on RERA Karnataka, including LAKESIDE 24. Its filings disclose no earlier RERA Karnataka projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if LAKESIDE 24 is delayed beyond 2 Oct 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of LAKESIDE 24?

The registered promoter entity is SYLVAN ACRES REALTY PRIVATE LIMITED, a company as per the filing. Its CIN U70102PN2005PTC021479 and GSTIN 29AAKCS3297G1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in LAKESIDE 24?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at LAKESIDE 24?

The professionals named in the filing: Architect: VINAYAK J (AUTHORISED REPRESENTATIVE OF RSP DESIGN CONSULTANTS (INDIA) PVT LTD); Engineer: Mohan K R; Engineer: Umesh Joshi, Designated Partner of JW Consultants LLP; Chartered Accountant: MUNIYAL PADMANABHA BHAT. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LAKESIDE 24?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LAKESIDE 24. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LAKESIDE 24 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.