Emerald & Luminaire Block at Brigade El Dorado

By Brigade Tetrarch Private Limited

RG-KA-63300 · RERA PRM/KA/RERA/1251/309/PR/190722/005089 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • 2 complaints at RERA Karnataka

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Dec 2026Possession promisedno revision filed
13 of 17Construction stages donefurthest along: Plinth level Beam, 0%
231 of 1,236Units unsoldnot recorded sold or booked
2Complaints at RERA Karnatakaon this registration
Jump to the 152 documents Report an error

Emerald & Luminaire Block at Brigade El Dorado is a Residential/Group Housing project by Brigade Tetrarch Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/190722/005089 on 19 Jul 2022. Possession is promised by 31 Dec 2026. 1,005 of the 1,236 units on this registration are recorded sold or booked, and 13 of 17 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameEmerald & Luminaire Block at Brigade El Dorado
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
    • 562149
  • Pincode562149
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/309/PR/190722/005089
  • ReraGenie IDRG-KA-63300

Builder

  • NameBrigade Tetrarch Private Limited
  • Entity typeCompany
  • CINU92412KA1995PTC018247
  • GSTIN29AAACT7266Q1ZG
  • Authorized SignatoryMr. Viswa Prathap Desu
  • DirectorsPavitra Shankar, Amar Shivram Mysore, Pavitra Shankar, Roshin Mathew
  • Project HeadMohan Ayyakod
  • Other registrations9 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredJul 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on19 Jul 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed152 files

Current status

81%1005 of 1,236 units booked
0.0%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EMERALD---5300530
LUMINAIRE---4770477

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 17 construction stages are filed complete. The stage furthest along is Plinth level Beam, at 0%.

Building: 76% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Retaining wall (All types)100%
Plinth level Beam0%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
RCC or MS Framed structure100%
Masonry construction: Bricks, Concrete blocks etc0%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc100%
Basic work of Water supply, Sanitary and Electrification100%
Dadoing, Skirting, Flooring, Tiles work (All types)100%
Railing and Grill fixing100%
Electrification, Water supply and Sanitary Finishing100%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network100%
Weather Proof work(tile,concrete)100%
Painting0%
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawings100%

Progress on shared amenities41

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes100%
Internal Roads & FootpathsYes100%
Sewage and Drainage SystemYes100%
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes100%
Solid waste management and disposalYes100%
Water conservationNoNot applicable
Energy managementYes100%
Fire protection and fire safety requirementsYes100%
Education/Health/Other public amenitiesYes0%
Electricity supply transformer and substationYes100%
Emergency Evacuation servicesYes100%
Storm water drainsYes100%
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes100%
ElectricityYes100%
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes100%
Community HallNoNot applicable
Outdoor Sports facilityYes100%
Indoor Sports facilityYes100%
Swimming PoolYes100%
GymYes100%
ParksNoNot applicable
Power BackupNoNot applicable
GasYes100%
Water and SanitationYes100%
Air Conditioning And incerntionYes100%
StaircasesYes100%
LiftsYes100%
Staircases and Lift lobbies, corridor,lobbies, corridorYes100%
Fire escapesYes100%
Common entrance and exit for the building / common portico/foyer/verandahYes100%
BasementYes100%
TerraceYes100%
Outer WallYes100%
Open parking areas and common storage spacesYes100%
Provision for lodging of management staff and security staffYes100%
Water conservation and renewable energyYes100%

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area38,196 sq m
Named landowners1
LandownerVillageDistrict
Brigade Tetrarch Private Limited--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 380.09 cr
Cost incurredRs 2
Spent of the estimate0.0%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 358.58 cr-
On-site expenditure-Site OverheadRs 15.71 cr-
Payment of cessRs 1.74 cr-
Payment of taxesRs 1.50 cr-
On-site expenditure-Salaries of workersRs 86.76 lakh-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 64.97 lakh-
Payment of feesRs 64.97 lakh-
On-site expenditure-Consultants FeesRs 34.80 lakh-
Payment of PremiumsRs 4.30 lakh-
Payment of charges-Rs 2

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAbhay Itty Zachariah, M/s. Zachariah Consultants
EngineerVIJAY KUMAR S.B
Chartered AccountantT.RAMACHANDRAN AND CO.,

Complaints filed with RERA Karnataka2

Case no.ComplainantRespondentFiled
CMP/220914/0010013-Brigade Tetrarch Private Limited14/09/2022
00122/2024-Brigade Tetrarch Private Limited29/01/2024

Documents filed152

As listed on the registration, under the names the promoter filed them with; the newest 80 of 152 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/190722/005089 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Emerald & Luminaire - Form 4 - Q2.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Emerald & Luminiare - Form 5 - Q2.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Emerald & Luminaire - Form 6 - Q2.pdf15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: RERA Form-4 BCV (Emerald & Luminaire at Brigade Eldorado).pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Emerald & Luminiare - Form 5 - Q1.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Emerald & Luminaire - Form 6 - Q1.pdf15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Emerald & Luminaire at Brigade ELdorado - Form 4 - Q4.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Emarald & Luminaire - Form 5 - Q4.PDF15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Emerald & Luminaire - Form 6 - Q4.pdf15 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Apr 2026
Q4 2025-26 KSPCB- MOEF (Above 50 Acres)15 Apr 2026
Q4 2025-26 KPTCL- BESCOM15 Apr 2026
Q4 2025-26 Fire and Safety15 Apr 2026
Q4 2025-26 Airport Authority of India15 Apr 2026
Q4 2025-26 BSNL/Telecommunication Department15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Emerald & Luminaire - Form 4 - Q3.pdf14 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: E & L - Form 5 - Q3.pdf14 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: E & L - Form 6 - Q3.pdf14 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)14 Jan 2026
Q3 2025-26 KSPCB- MOEF (Above 50 Acres)14 Jan 2026
Q3 2025-26 KPTCL- BESCOM14 Jan 2026
Q3 2025-26 Fire and Safety14 Jan 2026
Q3 2025-26 Airport Authority of India14 Jan 2026
Q3 2025-26 BSNL/Telecommunication Department14 Jan 2026
Bank Account Opening Form and Cancelled ChequeFile: Cancelled Cheque.pdf16 Jul 2022
KIADB Notifications (Priliminary and Final Notification)File: Acquisition - KIADB - Notification.pdf16 Jul 2022
KIADB Allotment LettersFile: KIADB - Allotment Letters.pdf16 Jul 2022
CDP showing the proposed siteFile: CDP - E & L Block.pdf16 Jul 2022
Agreement for SaleFile: Agreement to Sell - Emerald and Luminaire at Brigade El Dorado.pdf16 Jul 2022
Brigade Reply to the queriesFile: Emerald and Luminaire- Brigade Reply to RERA queries.pdf16 Jul 2022
Registration CertificateFile: Certificate of Incorporation BTPL.pdf-
Organization StructureFile: Organisation Structure.pdf-
Certificate issued by CA Form 1File: Emerald & Luminiare - Form 4- Compressed.pdf-
Certificate issued by Architect Form 2File: Emerald & Luminiare - Form 5.PDF-
Certificate issued by Engineer Form 3File: Emerald & Luminiare - Form 6.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: E & L - Affidavit for No Litigation.pdf-
Certificate from Chartered AccountFile: Approval cost - Emerald & Luminaire.pdf-
Balance Sheet 2020 - 2021File: Balance Sheet - 2020-21 - CA UDIN.pdf-
Balance Sheet 2019 - 2020File: Balance Sheet - 2019-20.pdf-
Balance Sheet 2018 - 2019File: Balance Sheet - 2018-19.pdf-
Audited Profit and Loss Statement 2020 - 2021File: Profit & Loss - 2020-21.pdf-
Audited Profit and Loss Statement 2019 - 2020File: Profit & Loss - 2019-20.pdf-
Audited Profit and Loss Statement 2018 - 2019File: P & L 2018-19.pdf-
Director's Report 2020 - 2021File: Directors Report 2020-21.pdf-
Director's Report 2019 - 2020File: Directors Report 2019-20.pdf-
Director's Report 2018 - 2019File: Directors Report 2018-19.pdf-
Cash Flow Statement 2020 - 2021File: Cash Flow Statement - 2020-21.pdf-
Cash Flow Statement 2019 - 2020File: Cash Flow Statement - 2019-20.pdf-
Auditor's Report 2020 - 2021File: Auditors Report - 2020-21.pdf-
Auditor's Report 2019 - 2020File: Auditors Report - 2019-20.pdf-
Auditor's Report 2018 - 2019File: Auditors Report - 2018-19.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR 20-21.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITR 19-20.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: ITR 18-19.pdf-
Brigade El Dorado - Plan Sanction - Phase 2-
BESCOM NOC-
E & L at Brigade El Dorado - Sanction Plans-
Site Plan-
Brigade El Dorado - Revised Fire NOC-
E & L - Section Plan and Specification-
E & L - Section Plan-
Specification - E & L Block-
E & L - Section Plan-
Site Plan and Blown Up Plan-
Brigade El Dorado - Title Opinion-

How this compares with Bengaluru Urban

81%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Emerald & Luminaire Block at Brigade El Dora on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmEmerald & Luminaire BlocOther 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 24 registered projects within 2 km.

Builder: Brigade Tetrarch Private Limited

Brigade Tetrarch Private Limited has 10 registrations on RERA Karnataka, including Jasper and Iridium at Brigade El Dorado and Aurum at Brigade El Dorado. Its filings declare 4 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Emerald & Luminaire Block at Brigade El Dorado is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Emerald & Luminaire Block at Brigade El Dorado?

The registered promoter entity is Brigade Tetrarch Private Limited, a company as per the filing. Its CIN U92412KA1995PTC018247 and GSTIN 29AAACT7266Q1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Emerald & Luminaire Block at Brigade El Dorado?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Emerald & Luminaire Block at Brigade El Dorado?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Emerald & Luminaire Block at Brigade El Dorado?

The professionals named in the filing: Architect: Abhay Itty Zachariah, M/s. Zachariah Consultants; Engineer: VIJAY KUMAR S.B; Chartered Accountant: T.RAMACHANDRAN AND CO.,. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Emerald & Luminaire Block at Brigade El Dorado?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Emerald & Luminaire Block at Brigade El Dorado. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Emerald & Luminaire Block at Brigade El Dora to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.