Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jul 2027Possession promisedno revision filed
7 of 97Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 27 documents Report an error

LAKE SHORE OASIS - PLOTS is a Plotted project by RSL REALITIES LLP in Nagpur, Maharashtra, registered with MahaRERA as PP1191012400005 on 20 Sep 2024. Possession is promised by 31 Jul 2027. 90 of the 97 units on this registration are recorded sold or booked. 1 complaint is on record with the regulator.

At a glance

Project

  • NameLAKE SHORE OASIS - PLOTS
  • TypePlotted
  • Location
    • PIPLA
    • Nagpur (Rural)
    • Nagpur
    • 440034
  • Pincode440034
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PP1191012400005
  • ReraGenie IDRG-MH-18628

Builder

  • NameRSL REALITIES LLP
  • Entity typePartnership
  • GSTIN27ABEFR6340R1ZJ
  • PartnerADITYA UMESH GUPTA
  • Other registrations3 more →

Key dates

this monthRegisteredSep 2024PromisedJul 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Sep 2024
  • Promised completion31 Jul 2027
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed27 files

Current status

93%90 of 97 units booked
80.9%Work done, per cost certificate

Figures as on 10 Jul 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo100%
Water SupplyNo100%
Sewerage (Chamber, Lines, Septic Tank , STP)No100%
Storm Water DrainsNo100%
Landscaping & Tree PlantingNo100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area94,494 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Sep 2024
LandownerVillageDistrict
LUXORA INFRASTRUCTURE PVT LTDMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityNAGAR PANCHAYAT BESA

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shriram Tower, Ground Floor, S V Patel Marg, Near NIT Building, Sadar, Nagpur, Maharashtra.440001
Estimated costRs 10.23 cr
Cost incurredRs 8.28 cr
Work done80.93%
BuildingWingEstimatedIncurred
-NARs 9.00 crRs 8.10 cr
NA Plot Without StructureNARs 1.23 crRs 17.98 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEKVEERA ARCHITECTS
ArchitectPARAG KOTWAL
EngineerJAYANT KADHAO
Chartered AccountantKARTIK KEJDIWAL
Chartered AccountantRIDHI DHOOT
Chartered AccountantANKIT VIKRAM TALREJA
Chartered AccountantSUMIT SANTOSH AGRAWAL & ASSOCIATES
PartnerRole in project
RSL REALITIES LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12500047Mrinal KatkarRSL REALITIES LLP03/03/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Sep 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Sep 2024
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2027

Documents filed27

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1 LAKE SHORE OASIS - PLOTS MAR-2026.pdf10 Jul 2026
Withdrawal Update Form 1File: FORM-1 LAKE SHORE OASIS - PLOTS DEC-2025.pdf10 Jul 2026
Withdrawal Update Form 2File: FORM-2 LAKE SHORE OASIS - PLOTS MAR-2026.pdf10 Jul 2026
Withdrawal Update Form 2File: FORM-2 LAKE SHORE OASIS - PLOTS DEC-2025.pdf10 Jul 2026
Withdrawal Update Form 3File: FORM-3 LAKE SHORE OASIS - PLOTS MAR-2026.pdf10 Jul 2026
Withdrawal Update Form 3File: FORM-3 LAKE SHORE OASIS - PLOTS DEC-2025.pdf10 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A MARCH 2026.pdf10 Jul 2026
Form 2A (FY 2024-2025)File: Form 2A MARCH 2025.pdf10 Jul 2026
Form 5 (FY 2025-2026)File: FORM-5 LAKE SHORE OASIS - PLOTS MAR-2026.pdf9 Jul 2026
Withdrawal Update Form 1File: Form 1 wed.pdf8 Jul 2026
Withdrawal Update Form 2File: FORM 2 05092024.pdf8 Jul 2026
Withdrawal Update Form 3File: Form3 -Lakeshore_DONE.pdf8 Jul 2026
Withdrawal Update Form 1File: Form 1 wed.pdf20 Apr 2026
Withdrawal Update Form 2File: FORM 2 05092024.pdf20 Apr 2026
Withdrawal Update Form 3File: Form3 -Lakeshore_DONE.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 wed.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1 wed.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1 wed.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM 2 05092024.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM 2 05092024.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM 2 05092024.pdf20 Jan 2026
Withdrawal Update Form 3File: Form3 -Lakeshore_DONE.pdf20 Jan 2026
Withdrawal Update Form 3File: Form3 -Lakeshore_DONE.pdf20 Jan 2026
Withdrawal Update Form 3File: Form3 -Lakeshore_DONE.pdf20 Jan 2026
Layout approvalFile: Tentative sanctioned layout map.pdf5 Sep 2024
Building plan approval or NA orderFile: NA Order LSO.pdf1 Sep 2024
Layout approvalFile: DEMARKATION.pdf1 Sep 2024

How this compares with Nagpur

93%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LAKE SHORE OASIS - PLOTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PIPLA2,800+ in Nagpur

2 kmLAKE SHORE OASIS - PLOTSCompleted 42Lapsed / revoked 19Other 51Dot size: filed unitsN

Filed coordinates, straight-line distance. 112 registered projects within 2 km.

Builder: RSL REALITIES LLP

RSL REALITIES LLP has 4 registrations on MahaRERA, including LAKE SHORE OASIS - PLOTS and LAKE SHORE OASIS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if LAKE SHORE OASIS - PLOTS is delayed beyond 31 Jul 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LAKE SHORE OASIS - PLOTS?

The registered promoter entity is RSL REALITIES LLP, a partnership as per the filing. Its GSTIN 27ABEFR6340R1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LAKE SHORE OASIS - PLOTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against LAKE SHORE OASIS - PLOTS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for LAKE SHORE OASIS - PLOTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LAKE SHORE OASIS - PLOTS?

The professionals named in the filing: Architect: EKVEERA ARCHITECTS; Architect: PARAG KOTWAL; Engineer: JAYANT KADHAO; Chartered Accountant: KARTIK KEJDIWAL; Chartered Accountant: RIDHI DHOOT; Chartered Accountant: ANKIT VIKRAM TALREJA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LAKE SHORE OASIS - PLOTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LAKE SHORE OASIS - PLOTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LAKE SHORE OASIS - PLOTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.