Home / Browse projects / Nagpur, Maharashtra / LAKE SHORE OASIS

Registered No litigation declared Residential / Group Housing project

LAKE SHORE OASIS

By RSL REALITIES LLP

RG-MH-30866 · RERA P50500079204 · Last updated on MahaRERA portal: 9 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Plinth, 90%
1 of 1Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 125 documents Report an error

LAKE SHORE OASIS is a Residential / Group Housing project by RSL REALITIES LLP in Nagpur, Maharashtra, registered with MahaRERA as P50500079204 on 17 Feb 2025. Possession is promised by 31 Dec 2027. 0 of the 1 unit on this registration is recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameLAKE SHORE OASIS
  • TypeResidential / Group Housing
  • Location
    • ENSARA METRO PARK
    • MOUZA-PIPLA
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440034
  • Pincode440034
  • RERA no.P50500079204
  • ReraGenie IDRG-MH-30866

Builder

  • NameRSL REALITIES LLP
  • Entity typePartnership
  • Other registrations3 more →

Key dates

this monthRegisteredFeb 2025PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Feb 2025
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed125 files

Current status

0%0 of 1 units booked
38.2%Work done, per cost certificate

Figures as on 9 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ROW HOUSE NO 62NA22101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Plinth, at 90%.

ROW HOUSE NO 62: 39% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth90%
Stilt Floor90%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes25%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,830 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
LUXORA INFRASTRUCTURE PRIVATE LIMITEDGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban

Approvals and building plan

Sanctioning authorityBESA-PIPLA NAGARPANCHAYAT
Permissible FSI6516.48
Proposed, not sanctioned147 sq m
Buildings approved24
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shriram Tower, Ground Floor, S V Patel Marg, Near NIT Building, Sadar, Nagpur, Maharashtra.440001
Estimated costRs 8.25 cr
Cost incurredRs 3.16 cr
Work done38.24%
BuildingWingEstimatedIncurred
ROW HOUSE NO 62NARs 7.70 crRs 3.16 cr
-NARs 55.60 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr PARAG KOTWAL
EngineerEr JAYANT KADHAO
Chartered AccountantCA ANKIT TALREJA
Chartered AccountantSUMIT SANTOSH AGRAWAL & ASSOCIATES
PartnerRole in project
RSL REALITIES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed125

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 125 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: FORM 5.pdf9 Jul 2026
Withdrawal Update Form 1File: FORM-1 LAKE SHORE OASIS MAR-2026.pdf8 Jul 2026
Withdrawal Update Form 2File: FORM-2 LAKE SHORE OASIS MAR-2026.pdf8 Jul 2026
Withdrawal Update Form 3File: FORM-3 LAKE SHORE OASIS MAR-2026.pdf8 Jul 2026
Withdrawal Update Form 1File: FORM-1 LAKE SHORE OASIS MAR-2026.pdf1 Jun 2026
Withdrawal Update Form 2File: FORM-2 LAKE SHORE OASIS MAR-2026.pdf1 Jun 2026
Withdrawal Update Form 3File: FORM-3 LAKE SHORE OASIS MAR-2026.pdf1 Jun 2026
Withdrawal Update Form 1File: FORM 1 DEC-25.pdf20 Apr 2026
Withdrawal Update Form 2File: FORM 2 DEC-25.pdf20 Apr 2026
Withdrawal Update Form 3File: CA Certificate.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM 1 DEC-25.pdf10 Feb 2026
Withdrawal Update Form 2File: FORM 2 DEC-25.pdf10 Feb 2026
Withdrawal Update Form 3File: CA Certificate.pdf10 Feb 2026
Withdrawal Update Form 1File: FORM 1_LAKE SHORE OASIS_SEPT 2025.pdf4 Feb 2026
Withdrawal Update Form 2File: form 2 LAKE SHORE OASIS sep 2025 AMENDED.pdf4 Feb 2026
Withdrawal Update Form 3File: FORM 3_LAKE SHORE OASIS_SEPT 2025.pdf4 Feb 2026
Withdrawal Update Form 1File: FORM-1 JUN- 25.pdf20 Jan 2026
Withdrawal Update Form 1File: FORM-1 JUN- 25.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM-2 JUN-25.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM-2 JUN-25.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM-3 JUN-25 SCANNED COMPRESSED.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM-3 JUN-25 SCANNED COMPRESSED.pdf20 Jan 2026
Building plan approvalFile: Building Map Plot -60.pdf3 Jan 2026
Building plan approvalFile: PLAN ROW HOUSE NO 60.pdf3 Jan 2026
Building plan approvalFile: PLAN ROW HOUSE NO 61.pdf3 Jan 2026
Building plan approvalFile: PLAN ROW HOUSE NO 64.pdf3 Jan 2026
Building plan approvalFile: PLAN ROW HOUSE NO 65.pdf3 Jan 2026
Building plan approvalFile: PLAN ROW HOUSE NO 66.pdf3 Jan 2026
Building plan approvalFile: PLAN ROW HOUSE NO 66.pdf3 Jan 2026
Building plan approvalFile: PLAN ROW HOUSE NO 67.pdf3 Jan 2026
Building plan approvalFile: PLAN ROW HOUSE NO 68.pdf3 Jan 2026
Building plan approvalFile: PLAN ROW HOUSE NO 69.pdf3 Jan 2026
Building plan approvalFile: PLAN ROW HOUSE NO 70.pdf3 Jan 2026
Building plan approvalFile: PLAN ROW HOUSE NO 72.pdf3 Jan 2026
Building plan approvalFile: PLAN ROW HOUSE NO 73.pdf3 Jan 2026
Building plan approvalFile: PLAN ROW HOUSE NO 74.pdf3 Jan 2026
Building plan approvalFile: PLAN ROW HOUSE NO 75.pdf3 Jan 2026
Building plan approvalFile: PLAN ROW HOUSE NO 76.pdf3 Jan 2026
Building plan approvalFile: PLAN ROW HOUSE NO 77.pdf3 Jan 2026
Building plan approvalFile: PLAN ROW HOUSE NO 78.pdf3 Jan 2026
Building plan approvalFile: PLAN ROW HOUSE NO 79.pdf3 Jan 2026
Building plan approvalFile: PLAN ROW HOUSE NO 80.pdf3 Jan 2026
Building plan approvalFile: PLAN ROW HOUSE NO 81.pdf3 Jan 2026
Form 5 (FY 2024-2025)File: FORM-5 MAR-25 SCANNED.pdf28 Oct 2025
Withdrawal Update Form 1File: FORM-1 JUN- 25.pdf25 Oct 2025
Withdrawal Update Form 2File: FORM-2 JUN-25.pdf25 Oct 2025
Withdrawal Update Form 3File: FORM-3 JUN-25 SCANNED COMPRESSED.pdf25 Oct 2025
Withdrawal Update Form 1File: FORM 1_LAKE SHORE OASIS_JUNE-2025 (2).pdf18 Oct 2025
Withdrawal Update Form 1File: FORM 1_LAKE SHORE OASIS_SEPT 2025.pdf18 Oct 2025
Withdrawal Update Form 2File: FORM 2_LAKE SHORE OASIS_JUNE-2025 (2).pdf18 Oct 2025
Withdrawal Update Form 2File: FORM 2_LAKE SHORE OASIS_SEPT 2025.pdf18 Oct 2025
Withdrawal Update Form 3File: FORM 3_LAKE SHORE OASIS_JUNE-2025.pdf18 Oct 2025
Withdrawal Update Form 3File: FORM 3_LAKE SHORE OASIS_SEPT 2025.pdf18 Oct 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LAKESHORE OASIS_FORM 3_MAR-25.pdf29 Apr 2025
LAKESHORE OASIS_FORM 2_MAR-2529 Apr 2025
Declaration in FORM BFile: 5 Commencement Certificates _ NA Order for plotted development.pdf15 Feb 2025
Declaration in FORM BFile: 6 Commencement Certificates _ NA Order for plotted development.pdf15 Feb 2025
Layout approvalFile: lAYOUTv1.pdf12 Feb 2025
Layout approvalFile: LAYOUT V2.pdf12 Feb 2025
Building plan approvalFile: lAYOUTv1.pdf12 Feb 2025
Building plan approvalFile: LAYOUT V2.pdf12 Feb 2025
Building plan approvalFile: bUILDING PLAN.pdf12 Feb 2025
Copy of Layout Approval (in case of layout)File: lAYOUTv1.pdf12 Feb 2025
Copy of Layout Approval (in case of layout)File: LAYOUT V2.pdf12 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: form b luxora.pdf12 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: form b rsl llp.pdf12 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: lAYOUTv1.pdf12 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: LAYOUT V2.pdf12 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: bUILDING PLAN.pdf12 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: na order merged-5-8.pdf3 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: reply lakeshore.pdf3 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: 1 Declaration about all RERA Designated Bank Accounts (Format A) (17).pdf3 Feb 2025
Other - FinanceFile: reply lakeshore.pdf3 Feb 2025
Other - TechnicalFile: reply lakeshore.pdf3 Feb 2025
Copy of the legal title reportFile: LEGAL TITLE REPORT_compressed-1-9.pdf21 Jan 2025
Copy of the legal title reportFile: LEGAL TITLE REPORT_compressed-18-24.pdf21 Jan 2025
Copy of the legal title reportFile: LEGAL TITLE REPORT_compressed-10-17.pdf21 Jan 2025
Proforma of Allotment letterFile: ALLOTMENT LETTER 62.pdf21 Jan 2025
Declaration in FORM BFile: FORM B PROMOTER LAKE.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf21 Jan 2025

How this compares with Nagpur

0%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LAKE SHORE OASIS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOUZA-PIPLA2,800+ in Nagpur

Builder: RSL REALITIES LLP

RSL REALITIES LLP has 4 registrations on MahaRERA, including LAKE SHORE OASIS - PLOTS and LAKE SHORE OASIS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if LAKE SHORE OASIS is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LAKE SHORE OASIS?

The registered promoter entity is RSL REALITIES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LAKE SHORE OASIS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LAKE SHORE OASIS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LAKE SHORE OASIS?

The professionals named in the filing: Architect: Ar PARAG KOTWAL; Engineer: Er JAYANT KADHAO; Chartered Accountant: CA ANKIT TALREJA; Chartered Accountant: SUMIT SANTOSH AGRAWAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LAKE SHORE OASIS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LAKE SHORE OASIS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LAKE SHORE OASIS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.